SOER 2015 Implementation Plan Presented at the 18th EIONET Air Quality Meeting Dublin, 24-25 October 2013 Presentation prepared by the SOER 2015 Coordination.

Slides:



Advertisements
Similar presentations
SOER 2010: structure and approach. Structure of SOER 2010 A Exploratory assessment Global drivers Megatrends Uncertainties Long-term policy implications.
Advertisements

European State of the Environment and Outlook Report 2010 – Part C Milan Chrenko, NFP/Eionet coordinator.
European State of the Environment and Outlook Report 2010 – Part C Milan Chrenko, NFP/Eionet coordinator.
European State of the Environment and Outlook Report 2010 – Part C Barbara Clark – SOER Part C Team Coordinator.
SOER 2015 Part C NFP / EIONET MEETING 17 October 2013 SOER 2015 Coordination Group (Milan Chrenko & Cathy Maguire)
– European-level thematic State of Environment (SOE) information
NRC Biodiversity EEA new Strategic Cycle Copenhagen, 27&28 October 2013 Ivone Pereira Martins, Head of Group, NSV1.
Joint NFP/experts Seminar on Forward- looking Information in Environment Assessment Copenhagen, May 2008 FOLLOW-UP ACTIVITIES Anita Pirc Velkavrh.
Ecosystems and Human Well-being: A Manual for Assessment Practioners Slide No 1 Towards a MA manual for sub-global assessments Thomas Henrichs National.
Glimpses from the EEA ICT strategy
An introduction to EEA-Eionet 1 July, Fielding Johnson Building University of Leicester.
Event / date: West Balkan NFPs-EEA Coordination meeting / 21 Oct 2014 Author: Anita Künitzer (ETC/ICM) Event / date: West Balkan NFPs-EEA Coordination.
SOER 2015 State and Outlook Environment Report EEA Adriana Gheorghe.
Eionet NFP Meeting 28/29 September 2011 European Environment Agency.
NFP/EEA Working Group on Eionet priority data flows (EPDF) - Status and developments for water Beate Werner Eionet FW workshop Copenhagen, 18 – 19 June.
SOER 2015 on the web Martin Fowell (UK Eionet National Focal Point team)
The European Environment State and Outlook 2015 (SOER 2015) SOER 2015 Coordination Group, European Environment Agency (EEA) BISE-CHM Expert Meeting -4.
NRC Soil working group on contaminated sites and brownfields EC JRC, Ispra, Italy – March 2015 EEA approach to setting indicators Geertrui Louwagie.
European Environment Agency EUROPE’S ENVIRONMENT Assessment of Assessments AoA Portal: AoA Contact:
SOER 2015 Implementation Plan Presented at the 18 th EIONET Air Quality Meeting Dublin, October 2013 Bases on a presentation prepared by the SOER.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Proposal Mapping Europes Environmental.
Shared Environmental Information System for Europe for Europe SEIS 25 October 2007, Dublin.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Copenhagen 22 May 2015 Division.
SOER 2015 Project Plan Meeting on Environmental Assessments 16-17April 2013 Integrated Environmental Assessments (Thomas Henrichs)
Click to edit Master title style eea.europa.eu 8 th EIONET workshop on climate change impacts, vulnerability and adaptation (24 June 2014) EEA activities.
UNSD Recent international developments in Energy Statistics.
NFP/Eionet meeting, October 2014, EEA PAN NFP/Eionet coordination European Environment Agency (EEA) Key points and actions Bratislava, Slovakia,
SOER 2010 and SENSE Milan Chrenko European Environment Agency.
The European Environment State and Outlook 2015 SOER 2015 Coordination Group, European Environment Agency (EEA) Implementation Plan NRC Biodiversity,
Eionet, the EEA & SOER 2015 – An introduction Martin Fowell (UK Eionet National Focal Point team)
EEA and Eionet example on sharing comparable data and information David Stanners Adriana Gheorghe.
EEA and Eionet example on sharing comparable data and information Adriana Gheorghe Fourth meeting of the WG on Environmental Governance and Climate Change.
SOER 2010 country assessments and SENSE Lessons learned and the way forward – The European perspective Bernt Röndell (SES), SEIS coordinator at EEA.
1 The EEA/EIONET Information System current applications and further developments relevant for EECCA countries Stefan Jensen.
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
Biodiversity.europa.eu BISE EEA and ETC/BD Rania Spyropoulou.
The Integrated Food Security Phase Classification in Sudan –Next Steps
Auditing Sustainable Development Goals
Tanzania JAS: Proposed work program for Joint Analysis /Programming
Europe’s Environment Assessment of Assessments EE-AoA 2011
The FAIRMODE ways of communication
Main aims Reporting Data Agree overall approach/framework to reporting
Writing and Publishing at the EEA
44th Meeting of the Standing Committee Bonn, Germany, October 2015 Report on activities of the Strategic Plan Working Group Ines Verleye,
The GEO-6 Matrix Drafting Approach
Swiss Cooperation with the EEA and within EIONET
Supporting Kenya and Uganda in developing and strengthening environmental-economic accounting for improved monitoring of sustainable development Alessandra.
Third Climate-ADAPT Webinar
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
Eva Royo Gelabert Project Manager Marine assessments
Update: EEA/Eionet developments
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
SOER 2010 country assessments and SENSE Lessons learned and ideas about the way forward Bernt Röndell (SES), SEIS coordinator at EEA 1.
Eva Royo Gelabert Project Manager Marine assessments
Ambient Air Quality Directives
Preparatory Workshop of the Pilot Boreal Natura 2000 Seminar
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
Reporting and Water Information System for Europe (WISE)
Eva Royo Gelabert Project Manager Marine assessments
Tobias Lung, Project manager – State of the Environment Reporting
Second Independent Evaluation of UNAIDS
SCG Meeting Brussels, 18 February 2005
Working group on data & information sharing DIS under CIS of WFD
Reportnet 3.0 Requirements Catalogue
Meeting of Water Directors Progress on Reporting and WISE
UNEP / Division of Early Warning and Assessment (DEWA)
Scene setter European Commission DG Environment
UNEP / Division of Early Warning and Assessment (DEWA)
4th Meeting of the Expert Group on the Integration of Statistical and Geospatial Information (UN EG-ISGI) – Nov 2017 Summary of progress Martin Brady,
Draft Charter Community of Practice for Direct Access Entities
Presentation transcript:

SOER 2015 Implementation Plan Presented at the 18th EIONET Air Quality Meeting Dublin, 24-25 October 2013 Presentation prepared by the SOER 2015 Coordination Group Anke Lükewille (EEA) 1

SOER […] publish a report on the state of, trends in and prospects for the environment every five years 1995 - report (151 pp) + summary SOER 1995 - addresses 5 EAP targets - focus on sectoral integration 1996 1997 1998 1999 2000 - big report (446 pp) + summary SOER 1999 - addresses environmental trends - focus on DPSIR, link between issues 2001 2002 2003 2004 2005 - bigger report (569 pp, Part A, B & C) SOER 2005 - addresses air, water, land - focus on DPSIR, core set of indicators 2006 2007 2008 2009 2010 - several reports (Parts A, B, C + Synthesis) SOER 2010 - addresses 6EAP priority areas - focus on systemic challenges 2011 2012 2013 ... 2

SOER 2015 The path from SOER 2010 to SOER 2015 Planning Reflecting Producing Assessing SOER 2015 Project Plan (Q1) SOER 2015 Implementation Plan (Q2) START WORK (Q3) 2010 2011 2012 2013 2014 2015 3

SOER 2015 More of the same, or something different? ... Both! What should stay similar? Maintain familiar structure, Parts A (global), B (Europe), Part C (national), Synthesis Expand on existing ‘narrative‘, i.e. analysis of systemic challenges, see SOER 2010 What might be different? Build more on other EEA work, more focus on, and refering to, existing indicators and reports Involve stakeholders more, especially in reflecting on implications and ‘prospects‘ Publish a credible and reliable, relevant and timely, legitimate and transparent, targeted and accessible assessment in 2015. Aim 4

SOER 2015 A suite of product(s): short briefs + up-to-date indicators DATA-related DATA-related 5

SOER 2015 Synthesis Focus: A synthesis across different SOER 2015 parts to provide a strategic integrated and cross-thematic assessment Format: 200 pages report, A5 format (mulitple languages); in addition we will explore scope for more interactive, derivative publications Basis: Key conclusions from the other SOER 2015 parts; reflections based on flanking activities; and dedicated stakeholder workshops Eionet: Formal Eionet consultation (May/June 2014); dedicated EEA Management Board seminar in March 2014 6

SOER 2015 Part A – Global Megatrends Focus: An updated assessment of global megatrends (GMT), i.e. focussing on the same issues presented in SOER 2010 Format: 11 GMT fiches, 4 pages each; complemented by showing indicators used in GMT fiches within SOER 2015 Online Basis: 8 non-environmental GMT primarly based on non-EEA sources, 3 environmental GMT building also on thematic EEA information Eionet: Eionet consultation on GMT fiches (May/June 2014); discussion with NRC-FLIS network on underpinning analysis GMT fiches FLIS indicators 7

SOER 2015 Part B – Thematic SOE information Focus: A series of brief summaries of state and trend in key environmental themes, guide through EEA knowledge base Format: 20-30 thematic fiches, 4 pages; complemented by an online presentation to integrate fiches with EEA thematic indicators Basis: Part B will primarily build on and guide to regular EEA reporting, indicators and assessment work within the respective thematic areas Eionet: Eionet feedback on structure and topics (Oct 2013); Eionet consultation on fiches (Mar/Apr 2014); regular data flows EEA indicators thematic fiches 8

SOER 2015 Part C – Country level SOE information (1) Focus: A series of summaries of national state of environment assessments, to show key environmental issues at country level Format: One country fiche per country, 4 pages each (based on a template and guidance by EEA to ensure some level of comparability) Basis: Drafted by countries; country fiches should largely be based on – or provide summaries of – existing national SOE reports Eionet: Eionet gives feedback on template and guidance (Oct 2013), based on this NFP and/or NRC-SOE draft country fiches and update SERIS (estimated average workload: 10 to 15 days per country) country fiches 9

EEA & country indicators SOER 2015 Part C – Cross-country comparisons (2) Focus: A series of indicator-based country comparisons for 8-10 selected themes based on existing EEA indicators Format: 8 to 10 cross-country comparison fiches, 4 pages each; each based on one established EEA indicator; in SOER 2015 online scope to link this national intepretation of same indicator via SENSE Basis: Drafted by EEA; cross-country comparisons based on EEA (CSI) indicators with country information; supplemented by SENSE Eionet: Eionet feedback on indicator selection and method (Oct 2013); Eionet consultation on cross-country comparison fiches (Mar/Apr 2014); plus (voluntary) contributions to SENSE EEA & country indicators omparison fiches 10

EEA & country indicators SOER 2015 SOER 2015 Online = NOT the same as SOE Online Focus: An internet based representation of all SOER 2015 components, allowing interconnectivity between parts Format: A stand-web-based ‘SOER 2015 Online‘ platform – linked with EEA website; scope also to add a related mobile application (app) Basis: The fiches drafted in Parts A, B, C; the Synthesis report; related EEA indicators set (and national indicators via SENSE) – link to broader ‘SOE online‘ (i.e. EOE, PDF, IMS, etc.) as appropiate Eionet: Eionet contributes to drafting and quality assurance of all SOER 2015 parts; Eionet feeds SOE online with existing information flows FLIS indicators EEA indicators EEA & country indicators GMT fiches thematic fiches country fiches SOER 2015 Online 11

SOER 2015 A suite of product(s): short briefs + up-to-date indicators 12

SOER 2015 Timeline from Planning to Publication   Focus Indicative timing Project Plan and Implementation Plan  Agree on a shared Implementation Plan (i.e. this document), to guide and structure strands of SOER 2015 work. until July 2013 Phase 1 – Final Outline  Develop outlines and guidance for all parts, include feedback loop with Eionet; SOER 2015 Online concept. until Nov/Dec 2013 (all Parts) Phase 2 – First Draft  Prepare a full draft of all fiches and the Synthesis; develop a fully functional test version of SOER 2015 Online. Jan to Mar 2014 (Parts B & C) Jan to May 2014 (Other Parts) Phase 3 – Quality Assurance  Review includes 2 weeks EEA-internal and 6 weeks Eionet and Scientific Committee consultation. Mar & Apr 2014 (Parts B & C) May & Jun 2014 (Other Parts) Phase 4 – Final Draft  Finalise drafts, based on consultation process; prepare a beta-testing version of SOER 2015 Online. until Jul 2014 (Parts A,B, C) until Sep 2014 (Synthesis) Phase 5 – Publication Process  Final consistency checks, lay-out, translate, print fiches and Synthesis; and finalise SOER 2015 Online. until Jan 2015 (all Parts) (data update in Nov 2014) Phase 6 – Dissemination  Launch SOER 2015, disseminate to respective audiences. all of 2015 13

SOER 2015 EEA SOER 2015 Coordination Group The overall SOER 2015 Lead lies with Jock Martin (Head of Programme Integrated Environmental Assessments, IEA); a SOER 2015 Coordination Group ensures the project implementation.   Contact point / Co-lead SOER 2015 Synthesis Team  Thomas Henrichs (IEA) SOER 2015 Part A Team  Teresa Ribeiro (IEA) SOER 2015 Part B Team Johannes Schilling (ACC) Mike Asquith (IEA) Frank Wugt Larsen (NSV) SOER 2015 Part C Team Cathy Maguire (IEA) Milan Chrenko (GAN) SOER 2015 Online Team Søren Roug (OSE) Andy Martin (SES) SOER 2015 Communication Team  Brendan Killeen (COM) 14

SOER 2015 Direct Eionet involvement (1) The NFPs coordinate reviews by the respective thematic NRC and other country-level experts as part of the regular consultation process;  See consultation calendar in implementation plan (cf NFP). (2) The NFPs and NRC-SOE, channel country-level input to the SOER 2015, especially as part of the Part C (including country fiches, SERIS, SENSE);  Draft country fiches, update SERIS, (voluntary) input to SENSE-III. (3) The NFPs reflect on the findings of the Synthesis stakeholder workshops at a dedicated session during the regular Eionet meetings;  For example at March 2014 Eionet/NFP meeting. 15

We look forward to all your important contributions! 16