RAND WATER’S PRESENCE IN Mpumalanga

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop North West.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Free State.
Portfolio Committee on Water Affairs and Forestry Support Received from DWAF and Amatola Waters Role in Rural Development of Water, Sanitation and Forestry.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP AND ACIP Quarterly Workshop GAUTENG Presented.
NCOP: SELECT COMMITTEE ON CO-OPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS BRIEFING ON THE FINDINGS OF THE FORENSIC INVESTIGATION IN TERMS OF SECTION 106.
Water System Planning Study
WS Infrastructure Programme
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY 06 th MAY 2008.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Thames Valley/Matatoki Water Supplies October 2012.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Northern Cape.
PRESENTATION TO PCWEA – 17 APRIL OVERVIEW OVERVIEW  Established in 1997 by the Minister of Water Affairs and Forestry in accordance with the.
1 Water Services to Schools and Clinics Programme 20 June 2007 Presentation to Select Committee on Education and Recreation By DWAF.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Western Cape.
WS Infrastructure Programme Quarterly Workshop GAUTENG REGION Presented by: Jabulani Maluleke RBIG Project Manager: Date: 31 – 01 October 2013.
ACTING Chief Financial Officer Water Trading Entity
Report to the Portfolio Committee on Human Settlements on the closure of Servcon Housing Solutions (Servcon) 26 February 2014.
PRESENTATION TITLE Presented by: Name Surname Directorate Date BRIEFING OF THE SELECTION PANEL FOR WATER SECTOR ENTITIES Name Surname: MR ANIL SINGH Designation:
Presentation by Ms Z Mathe Chief Director: Water Trading Entity January 2011 Presentation to the Portfolio Committee: Water & Environment Financial.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
PRESENTATION TO PCWEA 18 APRIL Presenters: Adv. G Khoza Mr. NA Mashele.
Integrated National Electrification Programme (INEP): Overall Performance (End of January 2012) Dr Wolsey Barnard.
Water is our Passion Click to edit Master subtitle style 5/30/11 PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE LEPELLE NORTHERN WATER STRAT PLAN, ANNUAL.
Statistical Presentation on the Condolences for the late former President Nelson Rolihlahla Mandela 23 December
BULK WATER TARIFFS OF BUSHBUCKRIDGE WATER Presented By: Ms. TP Nyakane Maluka - Chairperson Mr. MA Letswalo- Acting Chief Executive.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
PROPOSED BULK WATER TARIFFS for 2010/11 BUSHBUCKRIDGE WATER Presented By: Mr. P Ngomana- Chairperson Mr. Mapholoba A Letswalo- Acting Chief Executive.
Public Hearings on Division of Revenue Bill, 25 February 2009 Presentation by Department of Water Affairs and Forestry 1.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Briefing the Portfolio Committee on Water and Sanitation on Interventions to improve water.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS MAHOMED VAWDA Acting Chief Director: Institutional Oversight Dept of Water Affairs Dept of Water.
PERFORMANCE REVIEW Outlook for 2005/06 Financial Year Performance/Expenditure Expenditure review 2001/02 – 2007/08 Department of Local Government & Housing.
Asset Degradation Modelling at Townsville Water
Briefing the Portfolio Committee on Water and Sanitation on the
Municipal Water Infrastructure Grant (MWIG)
SECTION 47 REPORT 2014/15 (SUMMARY)
Annual report for the 2014/15 financial year
Briefing on Current Expenditure and their Performance Trends
WEST RAND DISTRICT MUNICIPALITY
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Mangawhai Wastewater Strategy and Options 7 August 2017.
Trevor Balzer: Acting CFO Helgard Muller : CD Water Services
BRIEFING THE PORTFOLIO COMMITTEE ON WATER AND SANITATION
COMMENTS ON THE DEBT OWED BY MUNICIPALITIES TO WATER BOARDS SALGA INPUT 20 MARCH 2007 BY WILLIAM MORAKA.
Mpumalanga Report on 2015/16 Delivery Plans and 2016/17 Business Plan
Presentation by Department: Water Affairs 22 March 2011
Mr Ntandazo Vimba and Henri Marais
Rand Water TARIFF CONSULTATION OCTOBER 2016.
FIRST QUARTER ANALYSIS REPORT
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 18 October 2017.
SECTION 47 REPORT 2013/14 (SUMMARY)
Cape Town Water Outlook 2018
KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS January 2018
City of Fernley City Council Meeting
Responses to issues raised: report as submitted on 4 April 2018
EASTERN CAPE ECD Conditional Grant Fourth Quarter 2017/18
Raw Water Use Charges for 2016/17 Financial Year
WASTEWATER MANAGEMENT 19 September 2018
PRESENTATION TO PORTFOLIO COMMITTEE OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS ON LOCAL GOVERNMENT IN THE MPUMALANGA PROVINCE ………………………… TOGETHER.
STANDING COMMITTEE ON APPROPRIATIONS
Best Practices in Operation and Maintenance of Waste Water Treatment
Major Vaal River Consultation Meeting Raw Water Use Charges for 2019/20 Financial Year 24 October 2018.
Annual Report 2008/09 Albany Coast Water Board Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs.
Water Services Targets
Presentation by: Ms N. Ngele
LEPELLE NORTHERN WATER
Presentation transcript:

RAND WATER’S PRESENCE IN Mpumalanga PRESENTATION TITLE Presented by: Name Surname Directorate Date

Regional Bulk Infrastructure Reticulation Related Projects Challenges and Way Forward 2

Regional Bulk Infrastructure – Bushbuckridge The Asset planning division together with the assistance of operations have assessed the immediate infrastructure needs for the area of operation. Demand is currently only partially being met from a number of abstraction and treatment plants as most plants suffer from a lack of maintenance. In order to bring current plants up to design capacity and reliability, renewal projects are recommended at several of the plants to provide standby capacity, improving operational control for both water quantity and quality purposes. This is the immediate focus of the capital expenditure program. The following projects have been identified: Acornhoek Water treatment plant – Refurbishment of the water treatment system. Thulamhashe water treatment plant – Automation and addition of redundancy on the Hoxane water treatment plant – Automation and addition of redundancy on the coagulant dosing system. This will include various other aspects realting to the improvement of water treatment Meeting further demand, current and future, will require augmentation of both treatment and bulk pipeline capacity. This is considered as the second phase of the program although some augmentation of infrastructure is expected to be invested in the initial stages. This is expected to increase as condition assessments of the infrastructure are completed in the upcoming year. The following projects have been identified: Additional Hoxane raw water pump station and connecting pipeline Additional Hoxane purification and pumping station. Hoxane to Ndonga pipeline (800/700diameter) 20Ml reservoir at Ndonga Pipeline Ndonga to Cunningmore (800/700diameter) An interim cash flow projection over the five year period is estimated at R600m.

Bushbuckridge Local Municipality supply area Plant (WTW) Design Cap (Ml/day) Operational capacity (Ml/day) Operatio nal capacity due to drought Production reduction due to drought (%) Municipal Area Raw water source Raw water source status Inyaka 100 0% Bushbuckridge Inyaka Dam Fair Hoxane 27 25 Sabie river (release from Inyaka dam) Thulam ahashe 9.0 6 3 50% Mutlumuvi river Poor Acornh oek 6.0 4 Agricultural dam and klein sand river Edinbu rgh 3.0 2,7 1 63% Agricultural dam Sand River 1.0 0.8 0.4 40% Sand river Marite 2.4 Nwaritjie river (release from Inyaka Dam)

Mbombela Local Municipality supply area Rand Water undertakes operations and maintenance for the Kanyamazane plant only Therefore, Rand Water has limited ability to increase capacity Contract with Mbombela has expired and on a month-to-month basis. The current contract does not even cover the cost of running the plant. There is current and increasing debt. In the last session in January 2017, Mbombela agreed to take to council the settlement agreement on the accumulated debt. However, given the past, there is little chance of success. Therefore Rand Water’s success in this area is limited. Plant (WTW) Design Cap (Ml/day) Operational capacity (Ml/day) Current Operational capacity due to drought Production reduction due to drought (%) Municipal Area Raw water source Raw water source status Kanyamazan e New 47 53 0% Mbombela Crocodile river (release from Kwena dam) Fair Kanyamazan e Old 6 2.4 Nyongane 14 22 Sabie river (release from Inyaka dam) Mshadza Package plant 2 0.8 0.4 50% Small stream Poor Dwaleni Package Plant 0.6 0.3 poor Mganduzwe ni Package Plant 100% Agricultural dam

Additional Challenges Concession Agreement With Sembcorp Silulumanzi This is a 30 year concession with Mbombela However, this is limited to the more affluent areas of Mbombela Rand Water operates the rural and poorer areas

Summary on Projects in Mpumalanga Reticulation Related Projects in Mpumalanga Summary on Projects in Mpumalanga Rand Water is the implementing agent for the list of projects listed below . These projects are funded through MIG, MWIG NWRI , RBIG and MPG. Rand Water was appointed to undertake projects on behalf on different local municipalities in Mpumalanga Rand Water undertook these projects and the list of completion dates is shown on the following slides The list of projects was presented in the 2014 – 15 financial year Project Name / Description Current % Completion to date (work done thusfar compared to expected work) 1. Thembisile Hani Completed – April 2016  2. Thembisile Hani Completed – March 2016 3. Thembisile Hani Completed – April 2016 4. Thembisile Hani 5. Thembisile Hani Completed – Sep 2015 6. Thembisile Hani 7. Thembisile Hani 8. Thembisile Hani 9. Thembisile Hani 1. Emakhazeni Completed – August 2016 2. Emakhazeni Completed - 30 June 2016 3. Emakhazeni 4. Emakhazeni 5. Emakhazeni 6. Emakhazeni 7. Emakhazeni

Project Name / Description Current % Completion to date (work done thusfar compared to expected work) 1. Victor Khanye Completed – August 2016 2. Victor Khanye Completed – April 2016 3. Victor Khanye Completed – June 2016 1. Bushbuckridge 97.5% 2. Bushbuckridge 90.0% 3. Bushbuckridge 92.0% 4. Bushbuckridge Completed – December 2015 5. Bushbuckridge Completed - November 2015 6. Bushbuckridge 7. Bushbuckridge Completed – Sep 2015 1. Dr Pixley Ka Seme Completed - June 2016 2. Dr Pixley Ka Seme 3. Dr Pixley Ka Seme 4. Dr Pixley Ka Seme 5. Dr Pixley Ka Seme 1. Dipaleseng Completed – March 2016 2. Dipaleseng 3. Dipaleseng 1. Govan Mbeki 1. Steve Tshwete Completion (71%) – October 2016

9 Mpumalanga – Strategic Challenges No. Description Scheme DWS Response 1 Identification of assets for takeover Bushbuckridge Scheme There was transfer of regional bulk assets to the Botshabelo District Municipality in 2009. This was disestablished and the assets transferred to Bushbuckridge. The IRR Masterplan identifies the Bushbuckridge scheme for transfer to the regional water utility (Rand Water). The critical matter remains outstanding. The new councilors of BBR are of the opinion that the municipality should continue with ownership. Therefore Rand Water’s operations will not be viable. 2 Western Highveld Scheme The IRR Masterplan identifies the Western Highveld scheme for transfer to the regional water utility (Rand Water). However this matter remains outstanding. 3 Funding Plan Bushbuckridge and Western Highveld Schemes The recommendation of work done by consultants on behalf of DWS is silent on the required funding. 4 Resistance by local municipalities Bushbuckridge Local Municipality There is increasing uncertainty in the relationship with Bushbuckridge Local Municipality. Rand Water received communication in January 2017, that council resolved to take over all projects that Rand Water has been undertaking 9

THANK YOU