Yukon Government 3rd Annual Industry Conference

Slides:



Advertisements
Similar presentations
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Advertisements

Organization of Primary Entities
Program Management Office (PMO) Design
Ensure Vendor/Engineer of Choice Product Quality
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
Project Management Framework May 2010 Ciaran Whyte Risk Administrator Planning & Strategic Projects Unit.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
PROJECT DELIVERY SYSTEMS
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
“Not everything that counts can be counted; and not everything that can be counted counts.” - Albert Einstein, Famous Genius.
Project Delivery and Contract Strategy (PDCS) Project Delivery and Contract Strategy Research Team Project Delivery and Contract Strategy Research Team.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Project Management PTM721S
Yukon Government 3rd Annual Industry Conference
2017 Education Series – NCHCA/CEO/City of Ottawa February 24, 2017
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
Contract Formulation and Administration
CallTower Implementation Process Overview
Unit 1 What is Project Management
Light Rail Transit Project
ACEC INDIANA Environmental Business & Funding Source Conference
EE Third-Party Solicitation Process Workshop Solicitation Alignment
What Small and Emerging Contractors Need to Know Introduction to Construction Risks and Contracting Practices © Copyright 2017 NASBP.
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Objectives of the Training
Call for competition process
TechStambha PMP Certification Training
Infrastructure Cost Mitigation
Temporary Works Co-ordination
Phase 2 Tollgate Review Discussion Template
Quality Management Systems – Requirements
Pre-contract Planning and Practice
Phase 1 Tollgate Review Discussion Template
PROJECT DELIVERY METHODS
CH 3: Selecting the bid and choosing proposal team
OCPS CCNA SELECTION COMMITTEE TRAINING
Cost Containment Working Group Board Update
Internal Audit Who? What? When? How? Why? In brief . . .
Preliminary Project Execution Plan
Project Kick-off <Customer Name> <Project Name>
Roles and Responsibilities
Construction Management Services April 16, 2018
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Brieana Reed-Harmel, Broadband Project Manager
Honoraria for Design Build Projects Methodology Assessment Matrix
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Yukon Government 3rd Annual Industry Conference Quality of Documents in Construction – Identifying Impacts and Solutions Whitehorse, YT – February 22, 2017 By Gil Brulotte, Chair of Canadian Construction Association

WHAT IS THE PROBLEM? As the Owner Requested it As the Architect Conceived it As the Structural Engineer Designed it As the General Contractor Bid it And After all the Change Orders All the Owner Really Wanted ….

MORE ABOUT THE WORKSHOPS Prince George St. John’s Vancouver Charlottetown Ottawa Fredericton Saskatoon Calgary Cambridge Whitehorse Halifax

ROUNDTABLE DISCUSSIONS Who is ensuring Quality Control & Coordination? Sharing of Risks How to measure completeness? How much time is involved?

Managing expectations Contractors’ role in design details? SHARING OF RISKS Communication Collaboration Managing expectations Contractors’ role in design details?

HOW TO MEASURE COMPLETENESS, GOOD VS. BAD? Prior to Bid Call: independent peer review, checklist After Bid Call: RFI, addenda, large variance in bid prices During Construction: Delay in permit process, changes, supplemental instructions, claims

HOW MUCH TIME IS REQUIRED? Project Delivery Methods Project Specific – nature & complexity Other Constraints – funding approval, labour shortage, knowledge transfer… How much time is required?

Insufficient Fee/Design Contingency Owners’ (Unnecessary) Pressure SURVEY QUESTIONS Insufficient Fee/Design Contingency Owners’ (Unnecessary) Pressure Lack of Final Coordination/Checking Lack of Coordination Between Architects & Engineers Insufficient Design Time “Design and Documentation Quality Survey – Comparison of Designers’ and Contractors Perspectives” (CSIRO May 2000) by Paul A. Tilley and Stephen L. McFallan

Inexperienced Contractors Requiring More Details SURVEY QUESTIONS Inexperienced Contractors Requiring More Details Shortage of Skilled & Qualified People Shortage of Experienced Spec Writers Perception that New Technology will Reduce Design Time Fragmentation of Consulting Services Intentional Assignment of Design Responsibility to Contractors New Trends of BIM&IPD Increase Collaboration

413 Completed copies of the questionnaire/survey: Architects – 71 SURVEY RESULTS 413 Completed copies of the questionnaire/survey: Architects – 71 Consulting Engineers – 57 Contractors – 138 Owners – 84 Others (or not identified) – 63

SURVEY RESULTS 3. Lack of Final Coordination/Checking Frequency(3.7)/Impact(4.3) 5. Insufficient Design Time Frequency(3.6)/Impact(4.1) 4. Lack of Coordination Between A&E Frequency(3.3)/Impact(4.1) 2. Owners’ (Unnecessary) Pressure Frequency(3.4)/Impact(3.9) 1. Insufficient Fee/Design Contingency Frequency(3.4)/Impact(3.4) 7. Shortage of Skilled & Qualified People 9. Perception that New Technology will Reduce Design Time Impact 10. Fragmentation of Consulting Services 8. Shortage of Experienced Specs Writers Frequency 6. Inexperienced Contractors Requiring More Details 11. Intentional Assignment of Design Responsibility to Contractors 12. New Trends of BIM&IPD Increase Collaboration

SOLUTIONS: COORDINATION Lack of Final Coordination, Checking & Proofreading / Lack of Coordination Between Architects & Engineers More internal review Commit to internal quality control process Internal mentorship program Better coordination between A&E Independent peer review

SOLUTIONS: INSUFFICIENT TIME FOR DESIGN Establish standard/best practice for design time Better communicate Owner/Consultant contractual obligations and expectations

SOLUTIONS: OWNERS’ EXPECTATION Owners Place Unnecessary Pressure on Consultants Better managing Owners’ expectation Enhancing communication and collaboration Owners be active in providing timely feedback and instructions during the design process Education for Owners and procurement authorities

SOLUTIONS: INSUFFICIENT FEE/DESIGN CONTINGENCY Use Quality Based Selection (QBS) in selecting Consultants Establish standard/best practice for design fee / design contingency Align design fee with the required level of services

ENGAGING OWNERS AND CONSULTANTS Full report is available from www.cca-acc.com Meetings/Presentations after releasing the report: Association of Consulting Engineering Companies of Canada (ACEC) Royal Architectural Institute of Canada (RAIC) Construction Specifications Canada (CSC) Federal Government Departments (Annual Government-CCA meeting in April 2016)

JOINT GOVERNMENT-INDUSTRY WORKING GROUP PSPC, DND, DCC, ACEC, RAIC, CSC, and CCA To recommend action plan on the top issues identified in the CCA report: Lack of final coordination, checking and proofreading Lack of coordination between architects and engineers Insufficient time for design / Owners placing unnecessary pressure on consultants (e.g. unrealistically high expectation, inability to make timely decisions) Insufficient fee / design contingency

JOINT GOVERNMENT-INDUSTRY WORKING GROUP RECOMMENDATIONS 1. Lack of final coordination, checking and proofreading: Define milestone achievements for each project Explicitly apply the necessary accountabilities to the appropriate parties Put greater weight in the RFP evaluation on efforts placed on coordination activities Ensure coordination utilizing owner/consultant sign-off procedures Constructability review in the RFP

JOINT GOVERNMENT-INDUSTRY WORKING GROUP RECOMMENDATIONS 2. Lack of coordination between architects and engineers: Explicitly define the QA/QC coordination deliverable Sign-off by each design team member Checklist approach to assess QA/QC coordination Employ appropriate technology

JOINT GOVERNMENT-INDUSTRY WORKING GROUP RECOMMENDATIONS 3/4. Insufficient time for design / Owners placing unnecessary pressure on consultants: Establish a detailed schedule for design delivery Streamline contract approval process following the concept design stage When encountering tight schedules, pursue other procurement methods (e.g. DB, CM) Regular meetings with Consultant throughout the project

JOINT GOVERNMENT-INDUSTRY WORKING GROUP RECOMMENDATIONS 5. Insufficient fee / design contingency: Select Consultants using QBS Incorporate past performance ratings into the evaluation criteria Ensure a sufficient contingency for design Apply more discriminatory rated criteria in the evaluation

What are the recommendations/best practices for private projects? NEXT STEPS FOR CCA What are the recommendations/best practices for private projects? How to engage Owners and Consultants to review their business practices? Prepare checklist for Contractors to recognize complete/incomplete design documents? Contractor’s Roles & Contribution

Thank you! Ideas and Questions?