QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING

Slides:



Advertisements
Similar presentations
COST EFFECTIVE SOFTWARES IN ENGINEERING
Advertisements

(2) Rules of Construction. How Thick or thin Size Analysis of Real Construction.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Taking off and ESTIMATING
The line sketch with modified height for the plinth floor is displayed.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally.
Er. Kashmir Dass M.E. (Hons.) Civil Sr. Lecturer in Civil Engineering, Sant Baba Attar Singh Govt. Polytechnic College, Badbar, Barnala Measurements in.
& CRITERIA FOR MAXIMUM ELEVATION OF RESIDENTIAL BUILDINGS IN FLOODPLAINS William L. Coulbourne, P.E. Applied Technology Council
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
BEAMS,COLUMS AND LINTELS
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
Ken YoussefiUC Berkeley 1 Structural, Piping, and Welding Drawings.
1 HVACR116 – Trade Skills Structural Drawings. 2.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CE Estimation & Quantity Surveying Prepared by Prof. S.L. DAVID ANANDARAJ.
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
CE Estimation & Quantity Surveying UNIT – IV VALUATION Prepared by Prof. S.L. DAVID ANANDARAJ.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
ME31B: CHAPTERTHREE INTRODUCTION TO STRUCTURAL DESIGN.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Residential Floor Plans
Chapter 22 Introduction to Elevations. 2 Links for Chapter 22 Elevation Basics Surface Materials Related Web Sites.
Orthographic Drawings
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Leads Institute of Technology & Engineering Subject Code : Name Of Subject :Building Construction Name of Unit : Concrete Topic : Plain Concrete.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Quantity Surveying.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Drawings Introduction to FIDIC - Drawings -.
Construction Documents
Estimating Project Costs
Building Planning and Drawing
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Drawing Interpretation
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
ESTIMATION AND COSTING
PLAN, NETWORK ANALYSIS AND 3D MODELING OF MULTISTORY BUILDING
Construction Project Management
What is the best method for constructing schools in Palestine ?
SEISMIC ANALYSIS AND DESIGN OF AN APARTMENT BUILDING WITH SHEAR WALLS
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Pre-Contract Cost Control
Estimating the Cost for the Concrete Pad
Quantity surveying Valuation & Spacifications Department of Architectural Assistantship Govt. Polytechnic for Women FARIDABAD.
Structural Drawing Chapter 19.
Awarding Criterion for late tender: the lowest bid- why?
Section and Details Vocabulary and Basic Information
Building Construction I Sofia Sebastian 1
Estimating the Cost for the Concrete Pad
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Detailed Contents Estimation Purpose of Estimating
Detailed Contents Estimation Purpose of Estimating
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Quantities and Price.
Quantities and Price.
Estimating the Cost for the Concrete Pad
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Masonry Bearing Walls.
Chapter 8 Framing Systems.
Muskat Secondary School Project
Advancd Measurement and Contract Administration
Presentation transcript:

QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING Submitted By M.SURYA NARAYANA 14FF5A0105 K.NAGARAJU 14FF5A0104 N.SOMARAJU 14FF5A0106 G.SAIKUMAR 13FF1A0108 B.SANTOSH KUMAR 14FF5A0103 M.PRAKASH 13FF1A0115 A.RAMBABU 14FF5A0101

ABSTRACT This document appendix of project development procedure manual (PDPM). The project development quantity and cost estimates of each items (walls, excavation, column, plastering, painting, ceiling, flooring, etc...) includes the policy and procedures required for developing project quantity and estimates. This document provides minimum guidance necessary to develop reasonably accurate cost estimates but doesn’t take place of experience and prudent engineering judgment. This guidance included discussion of many different factors that affect project cost estimates. Estimator should consider all of these factors as necessary in developing project cost estimates.

INTRODUCTION: Before taking up any project for its execution the owner or builder or engineer should have thorough knowledge about the volume of work that can be completed within the limits of his funds. It becomes necessary to prepare to estimate or probable cost for the intended work from the given drawings and specifications. If the probable cost is more than the funds available, attempts are made to lesson the cost by reducing work or by changing or altering specifications or modifying certain items. There is no hard and fast rule for finding out the dimensions from the drawing (plans, elevation, sections, etc..) but for quick work certain principles, may be followed. Beginners find it difficult to take dimension (length, breadth and height) from the plan, elevation and section, but they can easily find out the dimensions by measurements from the existing building. Foundation is more difficult for the beginners as it is not exposed and not visible. An estimator should picture the object (building, structure, etc...) in his mine from the study of drawing and specifications.

DETAILED ESTIMATION Preparation of detailed estimate consists of working out the quantities of different items of work then working out the cost that is the estimate is prepared . Details of measurements and calculation of quantities:- The whole work is divided into different items of work as Earth work, concrete , brick work etc. and the items are classified and grouped under different sub-heads, and details of each item of work are taken out and quantities under each item are computed in prescribe form DETAILSOF MEASUREMENT FORM:- S.NO DESCRIPTION OF ITEM NOS LENGTH BREADTH DEPTH QUANTITY

CENTRE LINE METHOD EARTH WORK CONCRETE IN FOUNDATION SOLING DAMP PROOF COURSE MASONRY R.C.C FLOORING AND ROOFING PLASTERING AND POINTING PILLARS DOORS AND WINDOWS WOOD AND IRON WORK PAINTING

ESTIMATION OF QUANTITY OF STEEL OF R.C.C ELEMENTS INTRODUCTION: In olden day’s availability and usage of steel as reinforcement is less. After introduction of steel size of the members are reduced, self weight is reduced tremendously, strength, durability and life of the structure increased. Almost all engineering structures R.C.C is used sparingly. Estimation of steel is to be included as a separate item in abstract estimate. Bar bending schedule are very much useful in bending of bars for the required size and shape. METHOD OF ESTIMATE OF STEEL:  Estimation of steel from the structural drawings Estimation of steel on the percentage basis of concrete

DESCRIPTION OR PARTICULARS ANALYSIS OF RATES AND ABSTRACT ESTIMATION INTRODUCTION: The determination of cost per unit of particular item of work, from the cost of material cost of labour charges, cost of machinery hire charges, VAT, Pretty super vision charges, contingencies, contractors profit etc. for its completion is known as the analysis of rates. The rates of materials and Labour charges vary from place to place. ABSTRACT ESTIMATION: The cost under item of work is calculated from the quantities already computed at workable rate, and total cost is worked out in a prescribed form, abstract estimation. ITEM NO DESCRIPTION OR PARTICULARS QUANTITY UNIT RATE AMOUNT

CONCLUSION: Before taking up any project for its execution the owner or builder or engineer should have thorough knowledge about the volume of work that can be completed within the limits of his funds. It becomes necessary to prepare to estimate or probable cost for the intended work from the given drawings and specifications. If the probable cost is more than the funds available, attempts are made to lesson the cost by reducing work or by changing or altering specifications or modifying certain items.

Thank You