A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD

Slides:



Advertisements
Similar presentations
Assumptions: Incompressible substance, B. Negligible heat transfer
Advertisements

WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Coupled Thermo-electric VTB Simulation Model of Cooling Loop of a Ship System Jamil Khan, Ruixian Fang, A. Monti, Wei Jiang, University of South Carolina.
1 Absorber Heat Transfer and Other Issues A Comparison between MICE and the Forced Flow Absorber System Michael A. Green Lawrence Berkeley National Laboratory.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
Heather Instasi Tulio Borel. Objectives Design a radiant heating system for a greenhouse located in Atascadero, CA Hot ethylene-glycol solution flowing.
PowerStream / Jonathan Smith / Your « One-Stop-Shop » for machine-tool peripherals PowerStream SA.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Mounting Direction Water Cooler Best solution OK Risk of air bubbles in the system Heatsink Water channels Inlet Outlet.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
Nuclear Thermal Hydraulic System Experiment
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
August 7, 2003K. Chow, LHC Luminosity Detector Thermal Analysis1 Analysis cases Approach: Start simple to get information— with speed with confidence that.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Cooling System Solutions
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Exercises for Q1. Insulated copper tube A thin walled 10 mm copper tube is used to transport a low-temperature refrigerant with a temperature that is.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Installation rules and guidelines
SPS High Energy LSS5 Thermal contact & cooling aspects
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
P. Sutcliffe Liverpool University
Feedback on transfer line sizing and flow calculations for UT
SVT Mechanics & Beam Pipe
Status of Cooling Development in Karlsruhe
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
Axion Relics Thermal – mechanical simulation for a flange UHV 114/63 1D with copper gasket
VELO Thermal Control System
UPDATES on INSIDE MECHANICS
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Integration issues at IHEP
Integrated Design: APEX-Solid Wall FW-Blanket
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Pixel CO2 Cooling Status
Tests on a dummy facet of PIX upgrade using CO2 cooling
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Steam traps Applications and Recommendations
PANDA Collaboration Meeting
Door Heat Exchanger: Specification
Presentation transcript:

A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD G. Giraudo CGEM-IT workshop IHEP Beijing 13-14 March 2017

2 TIGER CHIPS 0.8 W - 25 mm2 2 ANALOG REGULATORS 0.8 W - 6 mm2 CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino

FE1 56x40 mm FE2 56x30 mm FE1+FE2 h≈16 mm d≈4 mm 4 THERMAL PADS NEEDED CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino

A COPPER BOX (HEAT EXCHANGER) ADDED TO FE1 BOARD THERMAL CONTACT THROUGH THERMAL INTERFACE MATERIALS (ELECTRICAL INSULATOR) (THERM-A-GAP PARKER CHOMERICS, k=6.5 W/m∙K) (THERMFLOW 777 PARKER CHOMERICS, k=7.7 W/m∙k) DELIVERY & HEXAUST OF THE COOLANT THROUGH SS 316 TUBES & FITTINGS ALL COMPONENTS ARE BRAISED BOX FIXED ON FE1 BOARD WITH SCREWS (not shown) WEIGHT < 50 g CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino

Tmax =21.5 oC WATER TIN18 °C 0.5 l/min ΔP=0.05bar THERMAL LOAD=0.8 WATER TIN18 °C 0.5 l/min ΔP=0.05bar THERMAL LOAD=0.8 W CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino

DETAILED STUDY: VERY PRELIMINARY TEMPERATURE DROP DUE TO THE GEOMETRY ≈ 8 oC CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino

INLET ΔP<0.2 bar ΔT<0.3 °C OUTLET 3 LINES IN - 3 LINES OUT POSITION FOR THE Y MANIFOLDS MUST BE CONSIDERED IN THE WHOLE DESIGN. BEST POSITION: AS CLOSE AS POSSIBLE TO THE HEAT EXCHANGERS VOLUME SAVING SOLUTION: 1 LINE IN - 1 LINE OUT 9+9 HEAT EXCHANGERS GROUPED TOGETHER ΔP≈0.6 bar, ΔT≈1 °C CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino

WHAT’S NEXT: PROTOTYPE FOR THE HEAT EXCHANGER Validation of the FEM model Feasibility DESIGN OF THE WHOLE SYSTEM Chiller, Valves, Flow regulators, … INTEGRATION IN BESIII (L1 & L2 BOARDS?) CGEM-IT workshop IHEP Beijing 13-14 March 2017 G.Giraudo INFN Torino