ISOLDE Technical Report for the ISCC

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Nuclear physics: the ISOLDE facility
Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC.
Richard Catherall EN-STI CERN, 6 th July 2011 ISOLDE Technical Report for the ISCC.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Technical Report for the ISCC Meeting 23 rd June 2010 Richard Catherall EN-STI-RBS.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Schedule Access to the hall b508. Magdalena Kowalska.
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
Report Technical Director Storage-Ring-Installation Completed
Update on the PSB Cooling and Ventilation Systems
Crab Cavity Technical Coordination meeting:
RF acceleration and transverse damper systems
Richard Catherall EN-STI 2nd February 2011
Technical Report for the ISCC Meeting 23rd June 2010
ISOLDE Technical Report
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
the high-voltage network of CERN ToMORROW
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
RF operation of REX-ISOLDE
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
East Hall under construction
Alexander Herlert, CERN (PH-SME-IS)
MEDICIS Facility Isotope Separator Controls and HMI
ISOLDE Technical Report for the ISCC
HIE-ISOLDE Project: Planning & Resources
ISOLDE Technical report for INTC 21/5/2007
V. Fedosseev, R. Losito AB/ATB/LPE ISCC, 31/10/2005
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Technical Report ISCC Meeting 16th February 2009
Magdalena Kowalska, CERN PH-SME-IS
Superbeams with SPL at CERN
Technical report for ISOLDE INTC 19 May 2007
A. Herlert, CERN PH-SME-IS
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Mats Lindroos for The ISOLDE team
SLHC-PP kick-off meeting, CERN 9 April 2008
Experimental Areas – LS2 planning
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
East Hall under construction
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

ISOLDE Technical Report for the ISCC Richard Catherall EN-STI CERN, 31st January 2012

Agenda Targets REX RILIS Shutdown work 2011/2012 Safety News from EN Water cooling Access INCA Timing Safety News from EN

Targets A third target nanomaterial (SiC, Y2O3, CaO) for ISOLDE 35Ar from CaO469-VD7 for Proprietary CERN technology J. Nucl. Mat. 416, 99 (2011) Ions per second 31Ar (15.1ms) 32Ar (98ms) 33Ar (174.1ms) 34Ar (844ms) 35Ar (1.78s) ISOLDE 6.3E+01 3.6E+03 2.0E+05 2.6E+06 3.0E+08 TRIUMF - 7.0E+02 2.9E+04 6.5E+06 Yields on 31,32Ar measured by ISOLDE experiment IS476 – H. Fynbo and B. Blank. Turrion, M.; Urszula, H.-I. ISOLDE Yield Database. https://oraweb.cern.ch/pls/isolde/query_tgt (accessed December 1st, 2011) TRIUMF. ISAC Yield Measurement. http://www.triumf.info/facility/research_fac/yield.php (accessed December 5th, 2011) GANIL. SPIRAL Beams. http://pro.ganil-spiral2.eu/users-guide/accelerators/spiral-beams (accessed December 5th, 2011) T. Stora

REX improvements 1. Addition of FC readout channels Avoid having to move cables between XL65 and XL20 line when reading out Miniball and beta-NMR FCs - XEBS.FC20: new FC installed at the same location as EBIS.BO10 - XL65.FC100: new PAM for the Miniball FC - XL20. FC100: new PAM for the beta-NMR FC 2. REX controls upgrade Discussion about an upgrade of a number REX controls items have started. Four work packages identified. WP1: PLC/RS422 Controlled Power-supplies WP2: REX magnetic field regulation WP3: REX Linac RF Controls WP4: REX EBIS pulsed power-converters Work to be carried out between now and end of LS1 3. Increased performance of the new REXTRAP RF excitation (e.g. reduced loading time) F. Wenander

REX consolidation and improvements Linac cooling water Several trips during 2011 Flow can be reduced on the BTY line magnets -> Install flow regulators (gain ~7 m3/h) Vacuum upgrade in RFQ section (high losses with highly charged ions) New Hi-pace pump installed in front of RFQ Renovation of DB2 (this shutdown) Enable 2 ms RF pulse length on all amplifiers for slow extraction (this shutdown) Max rep rate: 50 Hz without 9-gap / 15-20 Hz with 9-gap Need reduced power for the 9-gap -> lower max energy D. Voulot

9-gap amplifier upgrade Upgrade of 9-gap amplifier to ensure stable operation during the 2014- 2018 period Replace final stage tube, 130 kW, 2 ms pulse length Estimated cost 300 k€ Commissioning early 2014 D. Voulot, H. Broere

Call for support by external students Project 1. Setup the TwinEBIS testbench a. Finalize design and installation of mechanical parts, 6 months b. Re-commission superconducting solenoid c. Produce a control system for power supplies, current readouts, vacuum control system, interlocks. Labview experience, 6-9 months d. Commission the source, test alternative cathode and gun types, increase electron beam current and energy. Electron beam simulations. >12 months Experienced student(s) Contact person: F. Wenander New IrCe cathode Modified Wehnelt electrode Courtesy of T. Berg TwinEBIS testbench Project 2. Detect low-intensity stable beam contamination using an MCP * Install the equipment (2 dedicated MCPs and vacuum chamber) * Set up electronics for particle counting of low-energetic (30-60 keV) ions * Evaluate the setup, i.e. test efficiencies, counting rates etc * Estimated time 3 months Contact persons: F. Wenander, M. Kowalska and B. Marsh

RILIS operation Ion beams of 15 elements were produced Laser ON time in 2011: 2756 h – Total 2527 h – On-line > 50 % of the Total running time of ISOLDE facility Beam Sm Ga Mg At Pb Dy Nd Pr Ag Tl Cd Mn Ni Yb Zn Planned 80 104 256 160 184 64 136 - 112 208 288 120 272 376 Real 89 101 146 269 221 35 110 4 92 231 242 390 348 73 407 V. Fedosseev, B. Marsh

ISOLDE RILIS development New ion beam - Astatine May 2011 (b, c) : 6 ionization schemes were compared up to 150 pA of 205At was obtained August 2011(d) : A series of Rydberg states observed At ionization potential measured precisely Dye laser scan, At-205 ion current measured with a Faraday cap

Shutdown Work Beam instrumentation General maintenance Exchange of double scanner unit in HRS separator zone Displacement of PAM’s externally to HRS separator zone. Migration of PLC software for PAM’s Grids and FNBS to IEPLC standard General maintenance Electricity, ventilation, robots, water, vacuum, laser window exchange….etc Controls applications Upgrade of various applications TIMBER traceability on-going Front End maintenance Faraday cage pistons to be replaced with “nuclearized” pistons & new cabling New HT cable to be pulled through HT transfer tube Target ramping cards Installation of controlled current reduction cards (ramping cards) for GPS & HRS target & EBIS cathode power supplies

Water cooling system Modifications of the existing target cooling system Refilling of reservoir with “clean” demineralized water from another circuit. Previous filled from target station closed circuit Diversion of water drainage Modification of controls to implement a delay before switching to reservoir Independent pressure regulation of GPS and HRS water circuits Tests on cavity cooling using 27C water cooling New HIE-ISOLDE specs for cooling tower. May need a water cooling sub-station?

Access to ISOLDE Following report by RP on the evaluation of the shielding at ISOLDE EDMS 1142606 Fencing to be put up before start up. Turnstile will be moved to new sas in E. Siesling

Control room workstation FEC (Front End Computer) INjector Control Architecture @ Advantages: Better performance thanks to centralised computing Settings history logged in DB Better scalability Better security Control room workstation Working set Knob Specific applications 3-tier Architecture based protocol INCA deployments status: PSB & LINAC 2 PS LEIR & LINAC 3 SPS ISOLDE System INCA Application server 2012 CMW (middleware) Why at Isolde? Control system uniformity within the accelerators complex More flexibility and customization capabilities FEC (Front End Computer) FESA server Real Time tasks E.Piselli (BE-OP-PSB)

Timing Signals Renovation T. Giles, P. Fernier

General Safety ISOLDE Primary area inspection by the French and Swiss authorities  Few minor remarks Web based safety course will be requested to get the access rights of the primary area A-P Bernardes

Date to be discuss with RP Safety Supervised area Existing Building 170 Date to be discuss with RP (D < 6mSv/year) Controlled area Supervised area  Controlled area: No more VCT (Short term visitor) Medical certificate mandatory to get the dosimeter No visitor allowed (only technical visits) A-P Bernardes

Target life cycle and Handling Handling with 1 remote controlled vehicle 2 new Kuka linear Robots In Isolde Target Area (2013) Deliver the new target to the exchange point for the Kuka robots Remove hot target and place on the shelf (during shut down) Move the 3 years decayed target from shelf to hot cell Move waste containers (with “standard” trans-pallet) New hot Cell (2013) To PSI New Target S. Marzari

S. Marzari, T. Stora HRS Shielding improvement New storage ~5000 m3 earth removal ~200m2 for nuclear medicine S. Marzari, T. Stora

Civil engineering overview Building 115 Class C lab Building 507 Light building Target area extension TSR extension Medical Isotope Facility Building 199 cold box Building 198 Compressor room

Thank You To the ISOLDE team and all the supporting groups …and for your attention