Est. Begin Construction

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Bridge Enhancements 07/22/2013 Route 47 Missouri River Bridge Bridgescape, LLC.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Downtown Revitalization Along Lafayette and Diamond Bridge Avenues Borough of Hawthorne October 15, 2014 Borough Engineer: Stephen T. Boswell, Ph.D., P.E.,
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Capital Improvement Program City of Warren, Ohio April 2012.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Georgia Transportation Infrastructure Bank (GTIB) Bert Brantley Deputy Executive Director State Road and Tollway Authority MAY 2013 STATE ROAD AND TOLLWAY.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
York Region’s Pedestrian and Cycling Municipal Partnership Program Presentation to 2014 Sustainable Mobility and Healthy Communities Summit ACT Canada.
Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Current Construction Projects Major Projects Pinellas County.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Phase 2: 30% Design Plans September 4 th, 2012.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Metro Highway Program Presentation to CMAA Abdollah Ansari
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Arizona Forward Update
Existing Interchange CC 215 Single bridge I 15
Southwest Parkway and Chisholm Trail Briefings
Four Winds Condominium Association August 2, 2017
Hesperian Boulevard Corridor Improvement Project San Lorenzo
Public Information Centre No. 2
City Council Meeting November 7, 2016
Central Polk Parkway PD&E Study
June 5, 2017.
Interstate 15 North Phase 4
DATA Transportation 101 Project Status March 20, 2002
Col. Pike Multimodal: About the Project
Interstate 15 North Phase 4 8/19/2015 Update
June 26, 2017.
River to Sea TPO Meeting US 92/International Speedway Boulevard
Florida Transportation Commission FY 2009
Transportation Projects
Maricopa County Transportation Improvement Program
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
Early Voting Starts Oct. 20 | Election Day Nov
25th Avenue Grade Separation
25th Avenue Grade Separation
projects update ATLANTA district
Contract 60X10 Informational Meeting Weber I-55
Comprehensive Transportation Plan
Coast to Coast Trail: FDOT District Seven Update
Protected Bicycle Lanes Finally Pedal Their Way to KC…
2019 Capital Program Title of Presentation
NEWLY RENOVATED RETAIL SPACE FOR LEASE!
Presentation transcript:

Est. Begin Construction Performance Report May 2017 Capital Improvement Projects All Projects Under Construction On Target Under Review Pending Funding At Risk Project Funding Source Estimated Completion Total Cost (in Million) Health A-01 Windy Hill / I-75 Interchange DDI CID/SPLOST/ARC/SRTA 2017 $19.4 Bridge is active and open to traffic under new DDI configuration. Bridge construction continues on decorative fencing, arches, and lighting. Anticipate full completion June 2017. A-02 Windy Hill East & West Side Road Improvement CID/SPLOST/SRTA $26.9 WH – E, construction is complete. WH – W, construction is complete. B-23 US 41 Cobb Pkwy Enhancement CID/SPLOST/GDOT $36.7 Landscape installation – Middle section complete. Sections at Galleria area & the River – Near completion. I-285 at Cobb Pkwy Interchange – Project is underway. B-02 US 41 / Cobb Pkwy Central Streetscape CID/ARC $3.8 - Lighting relocation. Coordinating design and GDOT approval. B-14 Riverwood Parkway Streetscape CID $0.65 - Coordinating with the County on the CFA. B-19 Cumberland Boulevard Bridgescape CID/GDOT $2.2 Finalizing fence fabrication, bridge construction/fence installation will begin in June 2017. Interstate North Parkway Ped Improvements 2018 $8.6 - Interstate N. Pkwy – frm the Marriott to Windy Ridge Pkwy is complete, frm Windy Ridge Pkwy to Cumberland Blvd - construction work continues including a 10 ft. multi-use trail, curb/gutter, walls, and decorative lighting. A-13 I-285 Pedestrian Bridge CID/CCDOT 2017 $9.8 Open to pedestrians on game days. Construction work continues on wall and fencing, and bus ramp along east side of ped bridge. Anticipate full completion Aug 2017. C-01 Bob Callan Trunk Trail Ph. II Segment A CID/FHWA/ARC 2019 $8.81 Construction work continues. Bob Callan Trailhead has been closed due to construction work. Anticipate completion 2019. Windy Ridge Bridge Ped Enhancement CCDOT 2017 $10.0 Open to pedestrians and motorist. Project is near completion, installing decorative fencing and lighting. Anticipate full completion June 2017. A-08 Cumberland Blvd West Intersection Improvement & Ph III Streetscape CID/CCDOT/GDOT 2018 $6.3 Contractor has completed clearing work, and will begin erosion control. Select Projects In Design/ROW On Target Under Review Pending Funding At Risk 0 Project Funding Source Est. Begin Construction Est. Total Cost (in Million) Health A-12 Akers Mill Ramp CID 2017 $48.9 Phase 1 - GDOT is advancing construction on this phase. Phase 2 - Received official approval from FHWA. C-12 Palisades/Paces Mill NRA Unit Rehabilitation CID/TBD TBD Undetermined - Short listed firms are scheduled to interview end of May 2017.. A-03 Terrell Mill Connector SPLOST/GDOT 2019 $30.0 County is conducting design and is anticipated to be complete June 2017. Beginning ROW phase Summer 2017.