Hillsborough MPO School Safety Study

Slides:



Advertisements
Similar presentations
McKenna Boulevard Traffic Management Meeting Presented to: McKenna Blvd. Residents W. Madison Police Precinct, Madison June 13, 2007.
Advertisements

January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
House Bill 2 and P3 Update Aubrey Layne Secretary of Transportation December 17, 2014.
Type Name Here Technical Program Services Eduardo C. Serafin, PE, AICP.
CP methodology adapted to Stockholm Convention Swedish International Development Agency S ESSION 9.C United Nations Environment Program Division of Technology.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Bicycle and Pedestrian Count Program FHWA Certification of Statewide Planning Process July 21, 2015 Celebrating 100 Years of Innovation, Mobility and Economic.
Plan and TIP Prioritization Process September 2015.
Louisiana Safe Routes to School. Where it’s safe, get kids walking and biking Where it’s not safe, make it safe Safe Routes to School goals.
MOBILITY 2030: THE METROPOLITAN TRANSPORTATION PLAN FOR THE DALLAS-FORT WORTH METROPOLITAN AREA North Central Texas Council of Governments Transportation.
HEPMPO US 40 Pedestrian Safety Study WVDOT MPO Planning Conference 9/16/2015 Matt Mullenax (HEPMPO) Daniel Szekeres (Michael Baker International)
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
THE DRAFT CAMPO 2040 REGIONAL TRANSPORTATION PLAN Mobile Meeting Presentation.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Oregon’s All Roads Transportation Safety (ARTS) Program Zahidul Siddique, Ph.D., PE, PTOE Oregon Department of Transportation October 26, st International.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
Safety Data Initiatives in Reauthorization – What Can We Expect? Kathy Krause, FHWA Office of Safety 30 th Annual International Traffic Records Forum July.
PROMOTING BIKING AND WALKING AS FUN, HEALTHY FORMS OF TRANSPORTATION IN PHILADELPHIA ELEMENTARY SCHOOLS.
Ken McLeod Program Manager THE BICYCLE FRIENDLY STATE PROGRAM.
BIKE AND PEDESTRIAN IMPROVEMENTS AND EDUCATION HILLSBOROUGH COUNTY PUBLIC SCHOOLS MPO SCHOOL TRANSPORTATION WORKING GROUP
Pedestrian Facility Improvement Program
Town Road Improvement Project Plan
Transportation Improvement Plan (TIP) Project Solicitation
Update of Transportation Priorities Plan
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
REGIONAL BICYCLE AND PEDESTRIAN PLAN
Hillsborough MPO School Safety Study
Pedestrian Safety & Mobility Study
Project Management Team Meeting #3
Boulder Junction Town Road Improvement Project
Signalized Intersection Lighting
Parking and Transportation Master Plan Executive Summary
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
CAPITAL DISTRICT TRANSPORTATION COMMITTEE Project Evaluation
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Road Safety Audit Findings
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Public Information Meeting NW 100th Street Reconstruction Project
Planning and Prioritizing At-Grade Railroad Crossings
FHWA Bicycle and Pedestrian Program
Meeting of the Hillsborough MPO Board December 5, 2017
Bicycle and Pedestrian Plan Vision/Goals/Objectives
Moving Maryland Toward Zero Deaths
Hillsborough MPO School Safety Study
Hillsborough MPO School Safety Study
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Non-Motorized Safety Planning in SW Michigan
Network Screening & Diagnosis
TELL THE TPO Community Transportation Survey
Hillsborough MPO School Safety Study
Sarah Tracy, P.E., PTOE Assistant Traffic Engineer
MPO Board Presentation
2016 Pedestrian Plan Introduction.
Technical Communication
2045 LRTP Overview United Way of St Johns County May 10, 2019.
Alex Henry FDOT District Seven Safety Office
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Overview: Culvert Inventory Project
Brieana Reed-Harmel, Broadband Project Manager
Clark County, WA Safety Management Program
2045 LRTP Overview North District Citizens Planning Advisory Committee.
TSMO – What Does It Mean for Planners?
Presentation transcript:

Hillsborough MPO School Safety Study Update August 2017

Hillsborough MPO School Safety Study Study Purpose Improve Safety for Students in Hillsborough County Task Prioritize school areas for multimodal safety and access reviews aimed at identifying opportunities to enhance the safety and comfort of getting to and from school. This is just a reminder, they’ve seen it before, so you don’t need to go through it all Result Complete Field Reviews at 10 School Areas

Today’s Objective Overview of Project Approach Initial Screening Evaluation Results Initial “Shortlist” of School Areas

Project Approach Overview Multi-Step Process: D. Screening 2 –Contributing Factors C. Screening 1 – Crashes + Students B. Define School Evaluation Areas A. Define School Types Prioritize Schools Step 1 Conduct Field Reviews of Highest Priority Schools Step 2 An overview of the project approach, went through this in detail last month, spend a couple of seconds to remind them of the process, then that we are focusing on the Screen 1 evaluation and some of Screen 2 G. Follow-Up Activities F. Complete School Safety Audits E. Detailed School Area Review Identify enhancements for highest priority schools Results

Screening 1 Evaluation Crashes and Students within School Areas: Example: Middle School 2-Mile Area School Students Enrolled Walk-Area Students Total Pedestrian and Bicycle Crashes School Age/Time Crashes School Crashes per 100 Area Students Adams 769 425 164 6 1.4 Barrington 1,352 313 2 0.0 Benito 1,049 550 3 5.5 Buchanan 713 188 62 1 5.3 Burnett 745 261 28 3.8 Burns 1,227 364 33 Coleman 965 728 92 4

Screening 1 Evaluation Ranking the Measures: Example: Middle School 2-Mile Area Value Rankings School Students Enrolled Walk Area Students Total Pedestrian and Bicycle Crashes School Age/Time Crashes School Crashes per 100 Area Students Walk Area Student Rank Total Pedestrian/Bicycle Crash Rank School Crash Rank School Crash Ratio Rank Adams 769 425 164 6 1.4 3 1 Barrington 1,352 313 2 0.0 5 7 Benito 1,049 550 5.5 Buchanan 713 188 62 5.3 4 Burnett 745 261 28 3.8 Burns 1,227 364 33 Coleman 965 728 92

Total Pedestrian/Bicycle Crash Rank School Crash Ratio Rank Screening 1 Evaluation Applying a Weight to the Measures: Example: Middle School 2-Mile Area Weighted Rankings School Walk Area Student Rank Total Pedestrian/Bicycle Crash Rank School Crash Rank School Crash Ratio Rank Composite Score Weighted Rank Adams 3 1 1.4 Barrington 5 7 6 6.0 Benito 2 3.3 Buchanan 4 4.2 Burnett 4.7 Burns 5.2 Coleman 1.8 20% 20% 50% 10%

Move the Top 10 from each school type to the Shortlist Screening 1 Evaluation Weighting the Weighted Rankings by Area Distance: 2-Mile Area 1-Mile Area 0.5-Mile Area Screen 1 Ranking School Weighted Rank Adams 1 Barrington 7 Benito 3 Buchanan 4 Burnett 5 Burns 6 Coleman 2 School Weighted Rank Adams 2 Barrington 6 Benito 4 Buchanan 3 Burnett Burns 7 Coleman 1 School Weighted Rank Adams 2 Barrington 5 Benito 4 Buchanan 6 Burnett Burns Coleman 1 School Comp. Score Weighted Rank Adams 1.69 2 Barrington 5.95 6 Benito 3.69 4 Buchanan 4.39 5 Burnett 3.59 3 Burns 6.33 7 Coleman 1.31 1 Note: This is the weighting that we are currently using; if they bring it up we are not too far in to change the way we are weighting by distance…if anything we could weight the 0.5 mile area more. 31% 33% 36% Move the Top 10 from each school type to the Shortlist

Screening 1 – Shortlist of School Areas PROPOSED SHORTLIST

Screening 2 Measures Arterial Road Intersections Collector Road Intersections Percent of Students on Free/Reduced Lunch Within MPO Defined Community of Concern Getting to School Survey Results # of Students Previously Receiving Non-Funded (courtesy) Busing Recent RSA or other Safety Study Programed Work/Capital Project

Screening 2 Measures

Next Steps Further review and evaluation of “shortlist” areas to identify 10 school areas for review Technical Review Meeting 9/13 Select 10 School Areas Schedule and conduct reviews Follow-up and finalize recommendations

Other considerations Charter Schools no busing, no not determine location

ELEMENT Engineering Group Thanks and Questions Contact Information: MPO Project Manager Lisa Silva, AICP, PLA silval@plancom.org Consultant Contacts Tindale Oliver Chris Keller, AICP ckeller@tindaleoliver.com ELEMENT Engineering Group Matthew Weaver, P.E., CPM mweaver@elementeg.com