THE HUMAN FACTOR IN PROJECT MANAGEMENT Group work Bases of group work

Slides:



Advertisements
Similar presentations
 How to make the application process better for candidates  How to make the sifting process more relevant and easy for the recruiter  How to manage.
Advertisements

From state affairs to asset management Peter Höflechner, MRICS.
Introduction to Systems Development and Systems Analysis
Components of software quality assurance system overview
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
Managing Projects
Introduction to the Energy Efficiency Accreditation Scheme EAUC Conference April 2008.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Chapter 5 Initiating and Planning Systems Development Projects
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 4th Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
Chapter 2-Introduction to Making Multimedia
Goal and Scope Where are we going and what path will we be taking?
The Environment and Cost Benefit Analysis in Feasibility Studies
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Project Management Chapter 3. Objectives Become familiar with estimation. Be able to create a project workplan. Understand why project teams use timeboxing.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
Ch 4 -1 The Internal Assessment Process for Strategic Decision Making Decision Analysis Dr. Ayham Jaaron.
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
Chapter 5 : Initiating and Planning Systems Development Projects.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
A survey based analysis on training opportunities Dr. Jūratė Kuprienė Framing the digital curation curriculum International Conference Florence, Italy.
© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process.
IT Governance: COBIT, ISO17799 & ITIL. Introduction COBIT ITIL ISO17799Others.
The Project Management Life Cycle. What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Staffing In General Practice Amrit Rehal May 2005.
Chapter 23 – Nonprofit Organizations u Importance of nonprofit organizations u Well over $100 billion is donated and allocated each year u Assets probably.
HANDLE BY M.Suganya AP/IT Aim: To present the concept regarding how the sotware projects are planned, monitored and controlled. Objective:  To introduce.
1 Chapter 2 A Generic View of Process Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman.
RELATIONSHIP BETWEEN FINANCIAL STATEMENTS FINANCIAL STATEMENTS AS A SYSTEM.
Intro to Business, 7e © 2009 South-Western, Cengage Learning SLIDE CHAPTER Types of Production Production Planning Planning.
LCCA Life-Cycle Cost Analysis Group 3A. Introduction “Life-cycle cost analysis (LCCA) is a method for estimating the total cost of ownership of a building,
THE WHAT, WHY AND HOW OF OUTSOURCING INFORMATION SYSTEMS.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Multitude of source of errors - various style of source of errors will affect the SQA components * The environment in which software development & maintenance.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Budgeting Small Business Information Systems Professor Barry Floyd.
Introduction The need for financial planning Balance sheet and income statement overview Internal and external documents Calculating costs Debt servicing.
CHAPTER 14 MANAGING PROJECTS. Project Management (Introduction) These numbers vary based on the study but… We spend about $1 trillion on IT projects 3.
Chapter 3 Managing the Information Systems Project
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 2-Introduction to Making Multimedia
Components of software quality assurance system overview
Introduction to Project Management
Project Management Techniques
Components of software quality assurance system overview
TRAINING & DEVELOPMENT
Business System Development
Systems Analysis and Design
Business System Development
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
MBI 630: Systems Analysis and Design
Enron Energy Services Energy Management Outsourcing Overview
Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e.
תחרות בין-צוותיות מקוונת בשיפוט עמיתים כאסטרטגיית הוראה בחינוך הגבוה
Chapter 5 Initiating and Planning Systems Development Projects
Lecture # 3 Software Development Project Management
CIS 210 Systems Analysis and Development
THE HUMAN FACTOR IN PROJECT MANAGEMENT Group work Bases of group work
Roles and Responsibilities of a Project Manager
Chapter 5 Initiating and Planning Systems Development Projects
Capital Improvement Plans
Project Name Presented by: Name of presenter
Chapter 2-Introduction to Making Multimedia
Data Analytics course.
Equipment Maintenance Office Supplies Replenishment
Presentation transcript:

THE HUMAN FACTOR IN PROJECT MANAGEMENT Group work Bases of group work Creative group work Assessment of group activities Meetings more efficient Management of personal time Problems of time management Planning and management methods and tools for using of time Desk and archive for productivity raising Management of people Leadership Motivating and rewarding Treatment of poor performance Post-assessment to the work Delegation Standpoints of management Management of the boss Self management Stress management

Introduction to project work The previous stages of the project The organization and starting of the project The role and responsibilities of the project manager Project planning Project staging, stages and tasks distribution The project economics The project cost makers Assessment of the labor costs Templates of the project budget presentation Monitoring of the project budget Cash flow calculations Calculation of project results Investment calculations - the customer's point of view Software project work capacity assessment Introduction to the work capacity assessment FPA – Function Point Analysis Asset-R – Analytical Software Size Estimation Technique - Real-Time COCOMO – Constructive Cost Model Poor man method Development of assessment methods Timetables Risk management

PROJECT WORK 2 Project reviews Project plan documenting Project management documentation The group formation and maintenance Project management and monitoring methods Project reporting Change management Outsourcing Project is delayed Project completion and follow-up survey Project follow-up survey Project management tools Project management questionnaires Project manager promting speech Course Summary

TOOTLIK TARKVARAPROTSESS Sissejuhatus tootlikku tarkvaraprotsessi Hea programmi tunnused Kuidas tootlikult tehakse häid programme ? Tarkvara tootmise küpsuse hindamine Tarkvaraprotsessi mõõtmine Inspektsioonid Sissejuhatus inspektsioonidesse Inspektsioonide hindamine Inspektsioonide plaan Inspektsiooninimekirjad Inspektsioonide korraldamine Inspektsiooniprotsess Inspektsiooni protokoll Inspekteerimise juhiseid Veaanalüüs Taaskasutamine Projekti kvaliteediplaan ISO 9000 – kvaliteedisüsteemi standard Isiklik kvaliteet