NEXCOM Next Generation Air/Ground Communications

Slides:



Advertisements
Similar presentations
Overview of the interoperability Regulation
Advertisements

U.S. Plans for ADS-B Briefing for
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
Next Generation Air/Ground Communications (NEXCOM)
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
International Civil Aviation Organization
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
USPTO Seal Patent Public Advisory Committee Meeting John B Owens II Chief Information Officer July 8, 2010.
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
Weather Technology in the Cockpit (WTIC) Planning and Status Update July 22, 2014 Eldridge Frazier 1 Friends and Partners in Aviation Weather FPAW)
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Data Link Communications
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
October 2002 Field Approval Process Improvement. October Topics  Background  FAPIT Recommendations  Status  Volume 2, Chapter 1  M-DAR.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Newark Project Overview January 2009.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Advancing National Wireless Capability Date: March 22, 2016 Wireless Test Bed & Wireless National User Facility Paul Titus Department Manager, Communications.
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
FAA VoIP- Interoperability Event Summary Report
Workshop on preparations for ANConf/12 − ASBU methodology
Supportability Design Considerations
ADS-B Regulations, Standards and Guidance
Ground Marker Regional Briefing to AWP
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
NEXCOM Next Generation Air/Ground Communications Appendix G
International Civil Aviation Organization
NEXCOM by Bruce Eckstein FAA.
NEXCOM by Bruce Eckstein FAA.
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
San Diego County & Imperial County
ATN Subnetwork Implementation:
Joint FAA/Eurocontrol Future Communications Study (FCS)
NGN Interoperability TIA DEL DOCUMENT #:
International Civil Aviation Organization
International Civil Aviation Organization
ICAO ACP Working Group M Iridium Sub Group Overview
A Concept for Launch and Reentry Collaborative Decision Making (CDM)
Presentation transcript:

NEXCOM Next Generation Air/Ground Communications                                NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead

NEXCOM Program Background NARC Recommendations & FAA Response Report on spectrum status FAA to provide annual update of status & projected demand Continue to support VDL-2 development FAA uses VDL-2 as incubator of datalink program and operational concept validation FAA expects combined capacity of VDL-2 & VDL-3 required to meet RTCA Combined Operational Concept & OEP objectives Expedite system demo of VDL-3 in a certified system FAA will demo a “certifiable” VDL-3 voice system and an “interoperable” data system by 2004 in advance of rule publication

NEXCOM Program Background NARC Recommendations & FAA Response Develop an alternative plan if VDL-3 proves untimely FAA begins deployment of 8.33 capable radios in 2003 Lead development of common next generation communications system FAA believes VDL-3 is next system through 2030 FAA will work with ICAO to jointly study VHF architecture & critically review alternate band solutions as proposed

Operational System Demo NEXCOM System Demonstration Plan 2001 2002 2003 2004 2005 System Demo I System Demo II Operational System Demo System Demo I Equipment: Air: MITRE Prototype Ground: ‘99 Configuration ITT MDR with FAA Prototype RIU Objective: Show VDL-3 technology is viable Demonstrates: Coverage Voice Quality Voice Override Integrated Voice and Data Objective: Show NEXCOM system architecture viability Demonstrates: Sector Handoffs ATN Network Interoperability System Management Commercial infusion Technology maturation Objective: Show commercial avionics certifiability and operational suitability Demonstrates: Operational digital voice Infosec capabilities Commercial avionics Human factors System Demo II Equipment: Air: MITRE & FAA Tech Center Prototypes Vendor Avionics (prototype) Ground: ITT MDR with FAA Prototype RIU Vendor Rapid Development equipment Operational System Demo Equipment: Air: Vendor Avionics Ground: ITT MDR with FAA Prototype RIU & GNI 4

NEXCOM Schedule Overview 2001 2003 2004 2009 2005 2002 2006 2007 2008 Demo 10/02 System Demo I 10/03 System Demo II 10/04 Operational Demo MDR MDR deployment 7/01 Contract Award 10/02 In-Service Decision Ground System Validation & Inter-Operability Tests with Airborne Avionics 7/02 Prototype Contract Award 10/01 System Reqmnts Document 1/05 Full Scale Dev Contract Award 07-12 Implementation 12/09 Operational 10/02 Characteristics Complete 8/03 Notice of Availability TSO Avionics 10/01 MOPS 8/04 Certified Aircraft 6/05-12/09 Airlines equip Rule Making Analysis & rule writing 6/05 VDL-3 Rule Published 1/02 RTCA Principals of Use 1/04 NPRM

NEXCOM VDL-3 AVIONICS TIMELINE 2001 2002 2003 2004 FAA VDL-3 TSO (AVR) Record Release Clearance Disposition of Comments Complete Notice of Availability (TSO) Draft TSO Initiated Submit to Legal Legal Review Pub in Fed Register Disposition Closed AIR Internal Review AGC Review 7/01 6/02 9/02 10/02 2/03 5/03 7/03 4 Mos 3/03 6/03 8/03 AVIONICS MANUFACTURERS (Development/Test) System Test & Integration Complete (contractor) Pre-Production/Interoperable Avionics to WJHTC PD, SOW, OTA Template Available to Vendors Prelim Design Complete ‘04 Demo - Ops Site PD (1st Industry Draft) ‘03 Demo - TC Certified Aircraft Avionics OTA 8/01 9/13/01 9/28/01 12/01 6/03 6/03 10/03 8/04 10-11/04 20 Months Discussions w/Manufacturers TSO Data Pkg to ACO AVIONICS MANUFACTURERS (TSOA) ACO Reviews TSO Data Pkg Prep/Sub Prelim SSA & Plan for SW Aspects of Cert TSOA 9/03 11/03 10/03 Prep/Submit Flight Test Plan & Balance of Design Approval Docs Conformity Insp & Install. Flight Test AVIONICS MANUFACTURERS (Installation STC) Submit Application for STC STC 10/03 12/03 4/04 2/04 7/04 6 Months Standards/ Requirements Interoperability Docs SC189 SPR Data VDR Subcommittee AEEC “A” Version MOPS Complete AEEC Char Available Operational Apprvl (AFS) Green Cover MOPS Available SC 198 SPR Voice MOPS SARPS 9/01 10/01 10/01 5/02 6/02 10/02 8/30/01

NEXCOM Program Risks Issue: Certified Avionics availability Action Plan: FAA/Airspace Users to collaborate on demo schedule & participation FAA/Industry to develop partnership agreements to develop, install & test avionics FAA/Users to provide in-kind support to demo operations Status: System Architecture & Integration Committee work – complete Characteristics development – pending AEEC General Session

NEXCOM Program Recommended Action: Approve initiation of VDL-3 characteristics development based upon existing 750 architecture