Process Requirements and Design Approach

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Advertisements

ESS Cryogenic System Design
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
NCSX Helium Bakeout System M. Kalish 3/25/02
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
LCLS-II Cryogenic Distribution System CDS Surface Components PDR Jerry Makara December 16, 2014.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Installation Package - Electrical
Technical Procurement Plan
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Technical Requirements
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
Process Simulation for the LCLS-II Cryogenic Systems
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
2K Cold Box PDR Introduction
FRIB Cryogenic Support
Cryoplant Installation Overview
Electrical and Controls
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
Overview of Mechanical Design
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
ILC Cryogenic Systems Draft EDR Plan
BriXS – MariX WG 8,9 LASA December 13, 2017.
ESS Target Cryogenic System European Cryogenic Days CERN
Testing/Commissioning of 2 K Cold Box
2K CB FDR Overview:  Agenda, Charge, Review Process
SC1R Cold Box PDR Mechanical Design
2K Cold Box Process Design
2K Cold Box Mechanical Design
SC1R Cold Box PDR: Process Requirements
Pressure Piping Analysis
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
Scope, Requirements Deliverables & Schedule
Cryogenics – The Basics
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
ESR2 Process Cycle Design
ESR2 Process Cycle Design
Presentation transcript:

Process Requirements and Design Approach Vishy Ravindranath LCLS-II 2 K Cold Box PDR September 27, 2016

Outline 2 K Cold Box Location Inputs for Process Model: LCLS-II Heat Loads & Pressure Drop Calculations 2 K Process Model 2 K Cold Compressor Requirements 2 K Cold Box Design – P&ID, Interfaces, Utilities & Engineering Standards LCLS-II 2 K CBX PDR, Sept 27, 2016

Requirements Overview –First Light & Normal Beam Operations 1 Cryoplant 2 Cryomodule Strings U-Tube Connections 14 MV/m Gradient 2E10≤ Qo ≤3E10 Compressor System 4.5 K Coldbox LHe Dewar 2.0 K Norm Beam Operations 2 Cryoplants 2 Cryomodule Strings U-Tube Connections Removed Gradient - 16 MV/m 2E10≤ Qo ≤3E10 Compressor System He Gas Tanks 4.5 K Coldbox LHe Dewar LN 2 Dewar 2.0 K Coldbox U-TUBE JUMPER CONNECTIONS - IB IB Gas Header Interface Box 1 4 5 6 7 8 9 10 11 12 13 14 15 BC Upstream Distribution Box Downstream Distribution Box 2 3 Downstream Distribution Box LH FC Upstream String L Downstream String 1.3 GHzGHz Cryomodule End Cap/Feed Cap Cryogenic Bypass Cryogenic Transfer Line . 3.9 GHz Cryomodule Cryoplant IB Vacuum Barrier 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 17 18 16

2K Cold Box Location -Cryo-Module to CDS LINAC CRYOMODULES Up-stream LINAC 17 CM x 12 m ~200 m Down-Stream LINAC 20 CM x 12 ~ 240 m TUNNEL Transfer Lines LH BYPASS Length = 70 m; 90° ELBOWS = QTY : 4 BC1 BYPASS Length = 60 m; 90° ELBOWS = QTY : 4 VERTICAL TL LENGTH = 11 m ; 90° ELBOWS = QTY : 2 Distribution box 90° ELBOWS = QTY : 6

2K Cold Box Location-CDS to Interface Box Compressor Room 1 Compressor Room 2 Cold Box Room 2 CDS Transfer lines Multichannel Transfer Line from CDS to Interface Box Transfer line length in the Klystron gallery ~ 50 m Transfer line Length from Klystron gallery ~ 30 m No of Elbows = 2

2K Cold Box Location-Interface Box to 2K Cold Compressor 9 1/4” Bayonnet Connections for Line B Interface Box (U-Tube Connections) for connecting the LINAC strings to their respective cryoplants Pipe Length = 5 m 90° ELBOWS = QTY : 4 Transfer line from Interface Box/Cans to 2K Cold Compressor Pipe Length ~20 m

LCLS-II Cryomodule Heat Load at 2.0K REF: (1) SLAC LCLSII-4.5-EN-0179-R2, “Cryogenic Heat Load”. (2) Tom’s Excel Spread Sheet: “LCLScryoHeat-23Feb2016-FirstLight.xlsx” Tables show the “2.0 K Heat Load” (does not include the heat load on distribution system) A. First Light Configuration E = 14 MV/m, Qo = 2.7E10 E = 14 MV/m, Qo = 2.0E10 E = 14 MV/m, Qo = 3.0E10 Up-stream Down-Stream Total Static [kW] 0.158 0.186 0.344 Dynamic [kW] 1.100 1.200 2.300 1.462 1.608 3.070 0.968 1.083 2.051 Total [kW] 1.258 1.386 2.644 1.620 1.794 3.414 1.126 1.269 2.395 B. Normal Beam Operation E = 16 MV/m, Qo = 2.7E10 E = 16 MV/m, Qo = 2.0E10 E = 16 MV/m, Qo = 3.0E10 Up-stream Down-Stream Total Static [kW] 0.158 0.186 0.344 Dynamic [kW] 1.415 1.615 3.030 1.878 2.146 4.024 1.261 1.464 2.725 Total [kW] 1.573 1.801 3.374 2.036 2.332 4.368 1.419 1.650 3.069 E = 19 MV/m, Qo = 2.0E10 E = 19 MV/m, Qo = 3.0E10   2.569 2.987 5.556 1.717 2.024 3.741 2.727 3.173 5.900 1.875 2.210 4.085

LCLS-II Non-Cryomodule Heat Load at 2.0K UPSTREAM NO Description SUPPLY-LINE A RETURN-LINE B Temp [K] Q_Nom [W] Q_Max [W] 1 Surface TL- Cryoplant to CDS 4.5 6.30 8.19 3.5 45.00 58.50 2 Male and Female Bayonnets Between Cryoplant & CDS [QTY = 4] 4.00 5.20 50.00 65.00 3 CDS- Distribution Box   2.1 27.00 35.10 4 Tunnel TL- LH Bypass 2.5 4.80 6.24 17.26 22.44 5 Tunnel TL-BC1 Bypass 4.30 5.59 15.30 19.89 6 Tunnel TL-Vertical 2.20 2.86 9.32 12.12 7 Tunnel TL-Within Cryomod 3.15 4.10 8.50 11.05 8 Feed Caps 25.00 32.50 9 End Caps 5.00 6.50 TOTAL 71.18 224.09 DOWNSTREAM NO Description SUPPLY-LINE A RETURN-LINE B Temp [K] Q_Nom [W] Q_Max [W] 1 Surface TL- Cryoplant to CDS 4.5 6.30 8.19 3.5 45.00 58.50 2 Male and Female Bayonnets Between Cryoplant & CDS [QTY = 4] 4.00 5.20 50.00 65.00 3 CDS- Distribution Box   2.1 27.00 35.10 4 Tunnel TL-BC2 Bypass  2.5 2.22 2.89 9.32 12.12 5 Tunnel TL-Vertical 6 Tunnel TL-Within Cryomod 3.15 4.10 10.00 13.00 7 Feed Caps 5.00 6.50 8 End Caps TOTAL 36.26 195.83 Heat Load on the 2.0 K RETURN LINE-B only contributes to raising the inlet temperature cold compressor suction REF: (1) LCLS-II CDS HEAT LEAK ANALYSIS, LCLS-II-495-EN-0299 (2) Bayonnet Heat Load calculated by Shirley Yang, Email: 11/13/2015

LCLS-II Pressure Drop in LINE-B (Example for E=16 MV/m & Q = 2.7E10) Nominal Beam Operation E = 16 MV/m, Q = 2.7E10 LINAC SAT TEMP = 2 K Location Item QTY NPS PIPE ID Area Length Press_in Temp Flow ρ Velocity mu Rey No F K Roughness DP   in m^2 m Bar kg/s kg/m^3 m/s Pa-s bar mbar Cryomod to CDS Straight Pipe 1.00 10.00 10.48 0.06 350 0.0313 2.1 0.097 0.75 2.32 5.41E-07 8.58E+05 0.0145 4.60E-05 3.86E-04 0.386 90° Elbow 16.00 8.00 8.41 0.04 0.0309 0.74 3.66 1.07E+06 0.45 3.56E-04 0.356 Elevation 11 0.0306 0.73 2.38 7.90E-04 0.790 2-4K HEX 6.00E-04 0.600 CDS to IBOX 80 0.0292 3.5 0.093 0.41 4.12 8.93E-07 4.98E+05 0.0152 1.57E-04 0.157 2.00 0.0290 0.40 6.44 6.21E+05 7.52E-05 0.075 Bayonet 90° Elbow 4.00 8.36 0.0289 6.53 6.25E+05 1.54E-04 0.154 Bayonet pipe 5 0.0288 6.57 0.0153 3.11E-05 0.031 0.0287 0.18 12.72 1.21E+06 5.83E-04 0.583 0.0282 0.39 12.99 0.0147 1.15E-04 0.115 IBOX TO CC 20 0.0281 0.72 4.47 9.64E+05 0.0144 1.45E-04 0.145 SR 90° Elbow 7.00 0.0279 4.49 4.24E-04 0.424 3.6 0.0275 0.71 4.55 2.51E-04 0.251 TOTAL ΔP [bar] 4.07E-03 P@CC [bar] 2.72E-02 Inputs needed for pressure drop estimation: Pipe Lengths Elbows Pipe ID Upstream pressure Fluid temperature Pressure Drop from Linac to CDS = 2.13 mbar Pressure Drop from CDS to 2 K Cold Box = 1.94 mbar Total Pressure Drop = 4.07 mbar

2.0 K Process Model, E = 16 MV/m, Qo = 2.7E10 UPSTREAM LINAC Heat Input defined for LCLS-II (for various Qo & E) were used as input for the 2 K process model Cryomodule Heat Load E = 16 MV/m, Qo = 2.7E10 Up-stream Down-Stream Total Static 0.158 0.186 0.344 Dynamic 1.415 1.615 3.030 1.573 1.801 3.374 The process model establishes the process conditions at the suction of the 2.0 K Cold Compressor. Flow : 97 g/s CC suction Press. = 27 mbar CC suction Temp. = 3.6 K

Cold Compressor Requirements & Operating Modes Operating Modes Specified in “Technical Specification for 2K Cold Compressors for the LCLS-II at SLAC National Acclerator Laboratory”, Specification NO: 79222-S001, Rev B. Cases Mode Flow [g/s] Inlet Temp. [K] Inlet Press. [mbar] Outlet Temp. [K] Outlet Press. [bar] Baseline Max. 215 3.5 27 < 30 1.2 Nom. 157 3.6 Min. 150 28 Downgrade 135 120 100 “Baseline” configuration will have compressor stages CC0 through CC4 For the “Downgrade” configuration: CC0 will be bypassed by adding a pipe spool piece connecting to the suction of CC1 (CC1 now becomes the 1st Stage). New stage CC5 will be added as the last stage compressor and pipe spool piece will used for connecting CC4 to the suction of CC5

LCLS-II 2.0 K Heat Load Compressor Map for 1st Stage-Baseline Compressor Map for 1st Stage-Downgrade  Description First light Normal operation Gradient (MV/m) E = 14 MV/m E = 16 MV/m E = 19 Mv/m Quality Factor, Q0 2x1010 2.7x1010 3x1010 CM 2 K Heat load (kW) 3.419 2.644 2.395 4.369 3.374 3.069 5.899 4.085 Flow from a Linac Seg to CDS (g/s) 93 75 68 115 92.5 85 155 110 2.0 K flow in single 2K box (g/s) 186 150 136 185 170 CPs needed 1 2 CCs Baseline Downgrade Heater in CM OFF ON CC Suction pressure (mbar) 27.2 28.3 28.6 27.7 24.7 27.4 CC Suction temperature (K) 3.56 3.67 3.73 3.47 3.6 3.38 3.49 Non Dimensional Flow Rate, Qad 1.17 0.92 0.83 0.95 1.16 1.06 1.05 0.90

LCLS-II Base Line Design Pump Down Path LCLS-II Base Line Design LCLS-II Downgrade The process conditions at the suction of the 1stage compressor during pump-down have been provided to the vendor. The detailed pump-down path will be provided at the FDR for the cold compressors. 2K Cold Box Design Review 24 Aug 16

Design Status – Cold Compressors Specification Released Technical specification includes: Scope of work…hardware, reviews, schedule, utilities, engineering standards & Requirements for Operating Modes. Technical Data for compressors, motors, variable frequency drives, instrumentation. Repair & Maintenance Plan & Past performance history

2 K Cold Box Design Approach - General LCLSII requirements very similar to FRIB 2K cold box design that is underway at JLab Cold compressors procured to spec-“Technical Specification for 2K Cold Compressors for the LCLS-II at SLAC National Acclerator Laboratory”, Specification NO: 79222-S001, Rev B. Cold box fabrication procured by build to print

2 K Cold Box P&ID LHe Dewar Clean up return To 4.5K CBX Instrument Air Sub-atmospheric pressure He gas from cryomodules returns to the suction of CCs and is compressed from ~ 27 mbar to 1.2 bar in the 2 K coldbox. The compressed gas returns to 4.5K coldbox through an U-tube. For the test of 2 K CBX with LHe dewar, 4.5K cold vapor from LHe dewar is used to simulate the flow, with a 3 kW heater for controlling the helium temperature in the suction line. A bypass line for the overall CC train is included for 4.5K standby operation mode and pumping down. Safety valves are used for the protection of the 2 K coldbox, CC and process piping. Pressure and temperature measurement are installed at the suction of each CC and on the discharge pipe. A flow meter is installed in the discharge pipe of CCs for flow measurement and controlling of CC. The 2K coldbox provides vacuum insulation for the cryogenic part of CCs and the cryogenic process piping. Clean up and warm up piping are included. Utility piping (Instrument air, cooling water and guard vacuum) are included. Instrument Air Cooling water 3 atm He Guard Vac. From LINAC CM

Operating Temperature Interfaces No. Interface Connection Operating pressure Operating Temperature 1 30 K discharge to 4.5K CBX 5-3/16” bayonet ~ 1.2 bar 25-30 K 2 3.5K suction line 10” internal pipe weld connection ~ 27 mbar ~3.5 K 3 4.5K vapor from LHe dewar 3-1/8” bayonet ~ 4.5 K 4 Cleanup return 1/2“ internal pipe weld 300 K 5 RT He supply 1” pipe 4 barg 6 Guard vacuum Weld < 10 Torr 7 Instrument air 6 barg 8 Cooling water 2” pipe weld ~ 300K

Utilities 1. Electricity 480 VAC +/-24V 3 phase – 60Hz +/-1Hz 2. Cooling water (For CC and Diffusion Pump) Maximum inlet temperature : 38°C Maximum return temperature : 49°C Maximum flow rate per compressor : 0.75m3/h (3.3 gpm) Pressure drop: <1bar 3. Vacuum guard (For CC and bayonets) Vacuum will be used for the sealing intercept instead of helium 4. Instrument air For 5 pneumatic control valves Supply pressure of 6 barg

Engineering Standards SNO Topic CODES Edition 1 Pressure Vessels-Materials ASME Boiler & Pressure Vessel Code, Sec. II 2015 2 Pressure Vessels-NDE ASME Boiler & Pressure Vessel Code, Sec. V 3 Pressure Vessels-Welding & Brazing Qualifications ASME Boiler & Pressure Vessel Code, Sec. IX 4 Pressure Vessels ASME Boiler & Pressure Vessel Code, Sec. VIII-Div 1 & Div II 5 Relief Valves API 520-Part 1, Sizing , Selection , and Installation of Pressur e-Relieving Devices in Refineries, Part I – Sizing and Selection 2014 6 CGA S-1.3, “Pressure Relief Device Standards Part 3 – Stationary StorageTanks” 2008 Process Piping ASME B31.3 Process Piping 7 Seismic LCLSII-4.8-EN-0227, LCLS-II Engineering Note on Cryogenic Plant Seismic Design Criteria 8 Control Valves ISA-S75.01, Flow Equations for Sizing of Control Valves 2007 9 Flow-Meters ISO-5167-1, Measurement of fluid flow by means of pressure differential devices 2003

Summary Specifications & performance requirements for the cold compressors have been developed based on detailed process calculations and used in the Technical Specification for the Cold Compressor- “Specification Number: 79222- S001, Rev B” The cold compressor specification accommodates the anticipated variation in the heat load. The design & interface requirements for the 2.0 K Cold Box have been clearly identified in the P&ID. LCLS-II 2 K CBX PDR, Sept 27, 2016

Questions ? LCLS-II 2 K CBX PDR, Sept 27, 2016