0v1.

Slides:



Advertisements
Similar presentations
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
Advertisements

VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
B.P. BIS Commissioning in point 8: follow-up 1 of 16 BIS Commissioning in Point 8 on week#17 (21st-> 25th April 08) 2 Controllers for LHC-ring BIS: 26.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
controls Middleware – OVERVIEW & architecture 26th June 2013
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Pierre Charrue – BE/CO.  Preamble  The LHC Controls Infrastructure  External Dependencies  Redundancies  Control Room Power Loss  Conclusion 6 March.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
B. Todd et al. 25 th August 2009 Observations Since v1.
3.14 Work List IOC Core Channel Access. Changes to IOC Core Online add/delete of record instances Tool to support online add/delete OS independent layer.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Signal Integrity Electro-Magnetic Compatibility Dependability.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
IPOC Software for LBDS Data Acquisition & Analysis LBDS Technical Audit CERN - AB/BT/EC - N.Magnin.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
6 Copyright © 2006, Oracle. All rights reserved. Oracle Clusterware.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
RF acceleration and transverse damper systems
A monitoring system for the beam-based feedbacks in the LHC
Data providers Volume & Type of Analysis Kickers
Software Overview Sonja Vrcic
Beam Interlock System SPS CIBU Connection Review
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
Overview of the Beam Interlock System
Realising the SMP 1. Safe Machine Parameters Overview
CO HW Monitoring Architecture
Fault Screen (“FAULT”)
Overview of CERN BIS and Communication Hardware
Injectors BLM system: PS Ring installation at EYETS
LINAC4 50 MeV phase BIS STATUS
B.Todd, M. Zerlauth, I. Romera, A. Castaneda
Purpose of this presentation
Recent developments in the Vacuum Control Software
ICE Monitoring – status 10 February 2010
J. Uythoven for the MPE-MI & MS Teams
1v0.
Safe mode transmission
BE/ICS Monitoring Systems Survey Results
Commissioning and Testing the LHC Beam Interlock System
0v1.
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
by Prasad Mane (05IT6012) School of Information Technology
Monday 11/07: Recovery Plenty of accesses.
MPSC Procedures An update
RF Local Protection System
LHC BLM Software audit June 2008.
Operation of Target Safety System (TSS)
Configuration of BLETC Module System Parameters Validation
SPS Injection BIS - Draft requirements
Presentation transcript:

0v1

Introduction Pre-Operational Testing and DIAMON

Integrity Checks - Overview Set of tests to be done before operation Verify that no critical internal faults are present Hardware configuration (physical system vs configuration DB) Timing alignment (all timing receivers are working correctly) LHC Safe Beam Flags CIBU_ID configuration JUMPER configuration TEST MODE of CIBUs BEAM PERMIT INFO Java Application Pre-Operational Testing and DIAMON

Stand alone tests with User Sytems Verify the hardware links between User Systems and the BICs Check the redundancy of USER_PERMIT_A and USER_PERMIT_B FESA interface defined to request changing USER_PERMITs Results logged in Oracle Database (LSA DB) System layout Java Application Pre-Operational Testing and DIAMON

Stand alone tests with User Sytems Java Application Pre-Operational Testing and DIAMON

DIAMON – Overview DIAgnostic and MONitoring tool for Controls Infrastructure Allows monitoring of PLC, VME, PCs, Servers… Main goal is to provide information about problems and help to solve eventual issues Notifications every 30 seconds Pre-Operational Testing and DIAMON

DIAMON – Architecture Pre-Operational Testing and DIAMON

DIAMON - Diagnostics What to check? VME Crates: Power Supply voltages, Temperatures, Fan speeds, CPU processes BIS: Timing reception, Permit Loop frequency, Permit Loop glitches, Communication with User Systems, USER_PERMIT glitches, Power supplies status of the Users Pre-Operational Testing and DIAMON

DIAMON – BIS Agent Pre-Operational Testing and DIAMON

DIAMON – BIS Agent Pre-Operational Testing and DIAMON

DIAMON – BIS Agent Pre-Operational Testing and DIAMON

DIAMON – BIS Agent Pre-Operational Testing and DIAMON

DIAMON – VME agent Pre-Operational Testing and DIAMON

DIAMON – VME agent Pre-Operational Testing and DIAMON