Introduction Pre-Operational Testing and DIAMON
Integrity Checks - Overview Set of tests to be done before operation Verify that no critical internal faults are present Hardware configuration (physical system vs configuration DB) Timing alignment (all timing receivers are working correctly) LHC Safe Beam Flags CIBU_ID configuration JUMPER configuration TEST MODE of CIBUs BEAM PERMIT INFO Java Application Pre-Operational Testing and DIAMON
Stand alone tests with User Sytems Verify the hardware links between User Systems and the BICs Check the redundancy of USER_PERMIT_A and USER_PERMIT_B FESA interface defined to request changing USER_PERMITs Results logged in Oracle Database (LSA DB) System layout Java Application Pre-Operational Testing and DIAMON
Stand alone tests with User Sytems Java Application Pre-Operational Testing and DIAMON
DIAMON – Overview DIAgnostic and MONitoring tool for Controls Infrastructure Allows monitoring of PLC, VME, PCs, Servers… Main goal is to provide information about problems and help to solve eventual issues Notifications every 30 seconds Pre-Operational Testing and DIAMON
DIAMON – Architecture Pre-Operational Testing and DIAMON
DIAMON - Diagnostics What to check? VME Crates: Power Supply voltages, Temperatures, Fan speeds, CPU processes BIS: Timing reception, Permit Loop frequency, Permit Loop glitches, Communication with User Systems, USER_PERMIT glitches, Power supplies status of the Users Pre-Operational Testing and DIAMON
DIAMON – BIS Agent Pre-Operational Testing and DIAMON
DIAMON – BIS Agent Pre-Operational Testing and DIAMON
DIAMON – BIS Agent Pre-Operational Testing and DIAMON
DIAMON – BIS Agent Pre-Operational Testing and DIAMON
DIAMON – VME agent Pre-Operational Testing and DIAMON
DIAMON – VME agent Pre-Operational Testing and DIAMON