CCU Update integrated resource plan May 17, 2016

Slides:



Advertisements
Similar presentations
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Advertisements

Installing Generation - Behind the Meter Chris Rogers Sega, Inc. November 6, KMEA Annual Conference.
Guam Power Authority Presentation to the Pacific Power Association 14th Annual Conference & Trade Exhibition August 26, 2005 From Independent Power Producers.
GPA Renewable Energy Resource for Guam Power Authority
Presented by John M. Benavente, P.E. General Manager, Consolidated Utilities Services PRESENTATION TO GUAM CONTRACTOR’S ASSOCIATION Update On GPA & GWA.
SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Arizona Electric Power Cooperative, Inc.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Energy Planning and Recent Regulatory Developments Northwest Energy Systems Symposium (NWESS) University of Washington February 22, 2008 Nicolas Garcia.
Engineering Technology Division
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
“Specializing in Operational Excellence” Outsourcing Is it right for you? Texas Technology Showcase Houston, Texas March 18, 2003 Integrated Process Solutions.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Integrated Planning Model (IPM) What It Is, Who Uses It, How It Works, What It Can Show You Presentation for For the Clean Air Act Advisory Committee Permits/New.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
IPM Overview Elliot Lieberman U.S. Environmental Protection Agency Washington, D.C
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Wholesale Electricity Price Forecast Draft Current Trends Forecast Jeff King Conservation Resource Advisory Committee September 30, 2002.
Puerto Rico Electric Power
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe.
1 Water Department FY 2014 Sources and Uses FY 2014 Sources Retail Sales$54,788,834 Wholesale Sales646,250 Other Operating Revenues145,000 Non-Operating.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Customer Presentation June 22, 2010 Allen Leverett – Executive Vice President and Chief Financial Officer.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Aligning the Gas and Electric Markets: EDF Solutions
Overview Market Opportunities Market Challenges
Regulatory Roadmap: Power sector environmental rules
“Other” Cost Estimates
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Irvine Ranch Water District Distributed Energy Storage Case Study
Integrated Resource Plan 2016
DRAFT- April 3, 2001 Restructuring Proposal to Brazos Electric Power Cooperative, Inc. April 6, 2001 This Information is CONFIDENTIAL Per Section 5 of.
First in Service First in Value
Fund Accounting Overview
Integrated Resource Plan 1
Enron Corp. Board of Directors Presentation
RMR Update November 6, /05/2002.
Development of an Integrated Energy Market in Saudi Arabia
Affordable Energy Production from Renewable Fuel
An EPCM Approach Bringing Sustainable Energy to Alderney
Economic Operation of Power Systems
FY 2017 Recommended Capital Plan
Presentation to the Enron Corp. Finance Committee
Massachusetts Electric Restructuring Roundtable
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Fuel Diversity for Electric Power Generation in New England
Wind Industry Market and Policy Overview
Overview of Northwest Wind Integration Action Plan
Joshua Basin Water District Revised Rate Recommendations
Mid-Continent Area Power Pool
Presentation on Cogeneration and District Cooling Plant
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Plug & Play CHP? Is Your Pocket About to be Picked?
Puerto Rico Electric System Challenges Ahead
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
FUTURE OF POWER GENERATION IN GHANA At the 2019 GhIE Annual Conference
Presentation transcript:

CCU Update integrated resource plan May 17, 2016

Presentation Outline Overview GPA Integrated Resource Plan Key Assumptions Comparative Analysis of CC Units Rate Impact GPA Implementation Plan 2016 Integrated Resource Plan Procurement Strategy Financing Options EPA Compliance Plan

Overview Renewable Portfolio Standards Public Law 29-62 (2008) 5% by 2015; 10% by 2020; 15% by 2030; 25% by 2035 2008 IRP No additional capacity requirements US Clean Air Act & Clean Water Act (2010) Environmental Compliance for EGU MATS and RICE MACT 316B Restricts Sea Water Cooling for New Permitted Units FY 2013 IRP Issued FY 2014 IRP Update Procure 120MW (Retire Cab1&2); Option for Additional 60MW (Retire Cab3&4, if economical) Loss of Cabras 3&4 (August 2015 Property Loss) PUC Order – Docket 15-05

2016 Integrated Resource Plan Procure up to 180 MW combined cycle units Obtain Engineering, Procurement and Construction Management (EPCM) contract to assist with Procurement Development & act as Owner’s Engineer IPP Model with GPA Financing Retire Cabras 1,2,3,&4 Convert MEC 8&9 to ULSD under IPP recapitalization model

Key Assumptions Load Forecast - Recognizing the Impact from Net Metering & Demand Side Management (DSM), Base Case Fuel Forecast – Includes ULSD and natural gas Life Extension Capital Costs, Fuel Conversion and EGU MATS Compliance for Cabras 1&2 Fuel Conversion & Rice MACT compliance Costs for MEC 8&9 (Independently Determined by BWSC/TRC) EGU MATS / RICE MACT and National Ambient Air Quality Standards (NAAQS) Compliance Options (required) for all Baseload units (Evaluated by TRC) Assumptions for New & Existing Resources CIP & O&M Costs (Independently Determined by LEIDOS) Peak Demand of 270MW by 2025 Compliance with USEPA Regulations by December 2021

Resources Considered New Resources (Simple Cycle CT, Combined Cycle CT, Combined Cycle Medium Speed Diesel) Various Sized Options of New Resources Various Quantities of Options of New Resources Various Types (Simple Cycle CT, Combined Cycle CT, Combined Cycle Medium Speed Diesel) Existing Resources Retention of Cabras 1&2 Units Retention of MEC 8&9 Units

Comparative Analysis of CC Units

Rate Impact (High Capital Case)

Debt Service Coverage Ratio (High Capital Case)

GPA Implementation Plan 2016 Integrated Resource Plan Procurement Strategy Financing Options EPA Compliance Plan

2016 Integrated Resource Plan Procure up to 180 MW combined cycle units dual fired for ULSD & Natural Gas Obtain Engineering, Procurement and Construction Management (EPCM) contract to assist with Procurement Development & act as Owner’s Engineer Independent Power Producer (IPP) Model with GPA Financing Retire Cabras 1,2,3,&4 Convert MEC 8&9 to ULSD / Natural Gas under IPP recapitalization model

Procurement Strategy Contract EPCM as GPA Owner’s Engineer Develop Procurement Documents for IPP Bid and Contract that will Optimize GPA’s total system costs Considers the following but not limited to: Various Capacities and Technologies New Generation and Supporting Infrastructure Capital Costs New Generation Variable and Fixed Operating & Maintenance Costs Heat Rate System Dynamic Response Capabilities Peak Load Carrying Capacity (PLCC) Reserve Margin

Procurement Strategy (continued) Reliability / Loss of Load Expectation (LOLE) GPA Finance and Lease Equipment to IPP Performance Based Contract with Penalties and Bonuses 30 Year Term Responsible for Labor, O&M, CIP, Insurance, Regulatory Compliance (Excludes Fuel Supply) Issue New Bonds 30 Years Take Advantage of Current Low Interest Rate Restructure Prior Debt for Levelized Annual Debt Service Refund Prior Bond Minimize Rate Impact (after 2026) Assist in IPP Bid Evaluation and Contracting Oversee Design and Construction

USEPA Compliance Schedule