LIU Wire Scanner Project

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Beam Secondary Shower Acquisition System: ICECAL_V3 Board and QIE10 Mezzanine Test preparations BE-BI-BL Jose Luis Sirvent Blasco 2.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Calibration Bench for Fast Wire Scanners: Optical Design and Issues Student Meeting Jose Luis Sirvent.
SPS New Wire Scanner Mechanics Review
Status of SPS Ionization Profile Monitor Mariusz Sapinski, CERN BE/BI MSWG
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
The Stripping Foil Test Stand in the Linac4 Transfer Line
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
RICH Simulation in LHCb LHC Detector Simulation Workshop S.Easo, RAL, On behalf of LHCb–RICH group.
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
TORCH IOP meeting Manchester March 31, 2015 TORCH Maarten van Dijk On behalf of the TORCH collaboration (CERN, University of Oxford,
Optical position sensor for the BWS Upgrade: Disk Samples measurements at different roughness (Stainless Steel and Aluminium) BE-BI-BL Jose Luis Sirvent.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
AB/BI J. Koopman New WS design - Brain storm session 18/06/2007 1/16 New WS design - Brain storm session.
ESS wire scanner Benjamin Cheymol
THE NEW FAST WIRE SCANNER DESIGN FOR THE PSB
Beam Wire Scanner for PS/SPS/PSB Motor Selection Dmitry Gudkov BE-BI-ML.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
News and Introduction from CERN June 15th, 2005
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
Power and control electronics for the new fast wire scanners
Brief Status SPS Prototype PSB Prototype Installed in LS1
Wire Scanner / A.Demougeot
LIU Wire Scanner Milestones June 2017
Installation of an Instrument on a CERN machine
Review on collimator movement with stepping motors
Injectors BLM system: PS Ring installation at EYETS
BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Working plan for 2017 Acquisition and Control Electronics
Fast Wire Scanner Prototype Mechanical Design
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
EC Activities Status for the LIU
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
LHC wire scanners status
Beam Wire Scanner for PSB
MD Studies for LIU PS Injection
Jose Luis Sirvent Blasco BE-BI-BL
LIU Wire Scanner Series Costs
Beam Wire Scanners (PS prototype and LIU series)
Beam Gas Ionization Monitor (BGI)
Review on collimator movement with stepping motors
High resolution profile measurements
Present and Future test facilities for High-intensity Targetry CERN
LARP Phase II Secondary Collimator RC-1
Status of CMS-PPS timing detectors
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LIU BWS Firmware status
East Hall under construction
Measurement of the beam (transverse) emittances
Presentation transcript:

LIU Wire Scanner Project Ray Veness, for the LIU WS Team Slides from JL Sirvent, D.Gudkov,

Status of PSB prototype Installed in EYETS 16-17 ‘Final’ mechanics, development control system, development acquisition systems Tests with beam, more than 900 scans recorded in June 2017 Benchmarking with the operational scanner Validated mechanical design (with exception - see next slide) Testing of prototype acquisition systems Intervention in TS3 to swap the instrument with the spare Instrument assembled and tested by VSC (awaiting final OK to install) Now on the test bench for calibration and burn-in tests

New fast wire scanner prototype in PS Booster (4L1) Prototype installed in PS Booster on 15.03.2017 Ready for operation

New fast wire scanner. Kinematic Unit Interchangeability One design of kinematic unit for all machines Interchangeability of components Design and Production Features Both shaft supports located in the stepped chamber No drum Direct drive Cantilevered shaft Magnetic auto-return device (magnetic brake) Standard CF flange DN273 Optimised design of forks (reduced deformation) Optimized design of optical encoder disc Vacuum Optical encoder focusers are outside vacuum Hybrid bearings (SS races, ceramic balls) Vacuum compatible motor supplied directly from subcontractor (CERN qualified) Increased stepped chamber wall thickness (0.4 mm vs. 0.3 mm) Designed in collaboration with EN-MME (N. Chritin, A. Demougeot) BI Day 10 March 2016

Shaft Angular Position Measurements. Optical Position Sensor Optical encoder disk located inside vacuum Follows the shaft movement Lens system and optical fiber are located outside the vacuum volume Trapped volumes avoided Reduced outgassing load Focal distance adjustment possibility by means of fine pitch thread Access from outside without venting Glass disk with chrome encoder pattern deposition (baseline) So far better optical properties Disk holder required (2 additional parts) Higher inertia Metal disk with laser engraved encoder pattern (preferred upgrade) Optical properties are comparable with glass disk (by recent tests) Laser engraving in collaboration with Dundee University Lower inertia due to optimised design Installation directly on the shaft Bakable up to 200 ⁰C (metal disk) roughness of optical track: Rt0.04 Optical slits pitch 0.02 mm. Al microstructure RSP6061 6062 …Acquisition will be discussed by Federico… BI Day 10 March 2016

PS Prototype On-schedule for installation in YETS 17-18 Mechanics arriving ECR approved by IEFC Control and acquisition will be available – deciding what to use Instruments and tanks will be used as spares for series No significant changes to designs.

PS Prototype Assembly and installation planning

LIU Series production Control system Mechanics Acquisition system Prototype under production for installation in the PS Series will be launched first Semester 2018, based on PS experience Mechanics Specification committee for vacuum tanks passed on 17/8/17 Production of all components now in progress Expect to be able to start assembly first quarter 2018 Still on schedule to be ready for early LS2 Acquisition system Final review to decide on baseline will be held xxx

LIU Series: Installation planning

Recent results from PSB prototype testing

3. PSB Prototype Beam Tests: 3.1 Precision on beam width determination Detectors detail ICECAL_V3 FE detail Beam Sigma spread comparison for prototype and operational (Ring 3 Horizontal) LHC25 and ISOLDE beams at different energies. Many points per sigma in both scanners : 200 – 500 Successful Prototype operation: Similar performance for LHC25ns (Dominated by amplitude statistics in both BWS?) Beam sigma errors Prototype ± 0,7% , Operational ±1,3% (ISOLDE). Prototype Operational Beam Type Operational Prototype LHC25 1.4GeV 2559 ± 31, 1.2% 2569 ± 37, 1.4% ISO 588 MeV/c 8021 ± 125, 1.6% 8245 ± 52, 0.6% ISO 886 MeV/c 6354 ± 88, 1.4% 6571 ± 46, 0.7% ISO 1.39 GeV/c 5302 ± 44, 0.8% 5538 ± 38, 0.7% ISO 1.92 GeV/c 4880 ± 53, 1.1% 5025 ± 34, 0.7% Beam sigma measurement (um) and spread during MD in um and %. BE-BI-PM Jose Luis Sirvent Blasco (jsirvent@cern.ch)

3. PSB Prototype Beam Tests: 3.1 HDR acquisition system evaluation Detectors detail ICECAL_V3 FE detail Aim: Ease BWS operation and avoid tuneable parameters (HV+Filter selection). Prototype equipped with two secondary acquisition systems: A) Standard: Single channel acquired on surface. B) HDR Based on Q-PMT detector: 4 channels acquired on tunnel with ICECAL FE. Scint. photon yield varied by 1e3: STD  Required filter changes HDR  Static configuration  PMT Saturation free BE-BI-PM Jose Luis Sirvent Blasco (jsirvent@cern.ch)

3. PSB Prototype Beam Tests: 3.1 Identified issues and actions Detectors detail ICECAL_V3 FE detail Issue: Not operated since then  Glass Disk was slipping into the BWS holder. Initial calibration table not valid anymore. Incorrect beam projections. Data shown was corrected by software (but potentially biased by this effect) Actions: New BWS with improved disk holder is prepared to be installed on next TS (19/09/2017) Scanner is under testing prior to installation  Calibration and performance assessment on optical bench. Small Scintillators to be substituted by bigger ones  Expected Improved amplitude statistics. BE-BI-PM Jose Luis Sirvent Blasco (jsirvent@cern.ch)

end