N_TOF CERN Enrico Chiaveri Spokesperson of n_TOF Collaboration

Slides:



Advertisements
Similar presentations
Peter Kodyš, March 21, 2006, DEPFET workshop, Prague, Status in Prague1 Charles University Prague Pavel Bažant, Zdeňka Broklová, Jan Brož, Zdeněk Doležal,
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Possibilities for further intensification of the JINR Educational Programme S.Pakuliak 110 th session of JINR Scientific Council September 15-16, 2011.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Potential Portuguese Contributions to the ESS Project Areas and topics of interest for the ITN Pedro Vaz (ITN) Workshop “Towards a Portuguese Participation.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Technical Support Activities in PH-ADO-PO
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Progress report Collaboration meeting 23-SEP-2009
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Dow Jones U.S. Style Indexes Returns Recalculation August 31, 2001.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
N_TOF commissioning INTC-P-249 Spokespersons: J.L.Tain, V.Vlachoudis Contactperson: V.Vlachoudis th Nov 2009 for the n_TOF collaboration.
PHENIX Timetable FY 2002 FY 2003 Prepare S  S  with Au-Au beams May 2001 March 2002 Jan 2001 June 2002 Sept st  physics (J/  suppression &
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Alignment for 2010 run and n_TOF 2009 beam profile M. Calviani (CERN), S. Andriamonje (CERN), E. Berthoumieux (CEA), C. Guerrero (CIEMAT),
Status of n_TOF Facility
Status and Perspectives on the “raw2dst2root” processing C. Guerrero, A. Hernandez, C. Weiss and F. Gunsing 2013 n_TOF Annual Collaboration Meeting Bologna,
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
Status of the n-TOF experiment E.Chiaveri ( EN-STI-EET ) On behalf of n_TOF collaboration 14/5 November 2010INTC Meeting.
Measurement of the 240 Pu(n,f) reaction cross-section at the CERN n_TOF facility EAR-2 47 th Meeting of the INTC CERN, June 25, 2014 A. Tsinganis 1, N.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
P. Paolucci G. Pugliese M.Tytgat
WLCG Tier-2 Asia Workshop TIFR, Mumbai 1-3 December 2006
TDAQ Phase-II kick-off CERN background information
PANDA Muon Group Meeting, Protvino 7 June 2011 G
HCAL M&O-B Budget CMS Finance Board
LHCC referees’ questions, comments, requests
4th FRC meeting, Antti Onnela, CERN-PH-DT
n_TOF “Draft” plans for YETS and LS2
Japan Participation in Phase-II TDAQ Upgrade
NA61 news and plans News from other labs/experiments
10/month is the present production rate 2 FTE + sporadic contributions
EU Institution Board 1 representative of each participating institute
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Preparation of the CLAS12 First Experiment Status and Time-Line
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
HL-LHC upgrade at IPHC news
Operations/Control room organization during commissioning
McDonald’s calendar 2007.
for the Revision of the Constitutions
Plans for the 2004 CSC Beam Test
2015 January February March April May June July August September
PSB Digitization Pilot Project
Presentation transcript:

N_TOF TEAM @ CERN Enrico Chiaveri Spokesperson of n_TOF Collaboration  The n_TOF Collaboration, http://www.cern.ch/nTOF N_TOF TEAM @ CERN Enrico Chiaveri Spokesperson of n_TOF Collaboration E.Chiaveri n_TOF Collaboration/Collaboration Board University of Bologna November 2013 E.Chiaveri

List of Persons Role FTE E. Chiaveri 1 O. Aberle 0.4 S. Montesano 0.5 Spokespersons Project Leader of EAR2 1 O. Aberle Technical Coordinator Responsible of beam line EAR1/EAR2 With Simone Montesano Coordination of EAR2 installation 0.4 S. Montesano GLIMOS Support Engineer for experiments preparation EAR1/EAR2. Responsible of keeping detectors operational. Coordination with O.Aberle of EAR2 Installation. Taking care with Christina with the ancillary installations („Old“ Control room, „grillage“, Electronic Lab.) 0.5 E.Chiaveri n_TOF Collaboration/Collaboration Board University of Bologna November 2013

List of Persons Role FTE M.Calviani Responsible of n_TOF Target F.Gunsing Physics and Commissioning EAR1/EAR2 coordinator In collaboration with N.Colonna chairmanship of Analysis Group. DST Creation with Christina Scientific Associate Full Time from 1 July 2014 V.Vlachoudis Coordinator of neutron beam lines simulation C.Weiss DST Creation/Raw data analysis routine with Frank Run Coordinator Beam line 2 simulation and integration Commissioning EAR2 with the physics coordinator. Taking care with Simone with the ancillary installations („Old“ Control room, „grillage“, Electronic Lab.) Fellow since 1 September 2013 E.Chiaveri n_TOF Collaboration/Collaboration Board University of Bologna November 2013 E.Chiaveri

List of Persons Role FTE 0.5 Until end 2014 Until August 2014 C.Guerrero Physicist support on preparation of EAR1/EAR2 commissioning and experiments 0.5 Until end 2014 A.Masi and his Team DAQ & electronics support responsible leader of the section Equipment Controls & Electronics will ensure the: Electronics & IT support on the construction of the EAR2 Upgrade of the DAQ software and experiment management software architecture General electronics support Maintenance and support during the operation (i.e.piquet service) A.Hernandez Work on DAQ refurbishing Software/hardware and DAQ commissioning Until August 2014 E.Chiaveri n_TOF Collaboration/Collaboration Board University of Bologna November 2013

List of Persons Role FTE M.Sabate Commissioning analysis (2014) Medical Experiment EAR2(2015/2016) PhD since Feb. 2014 S.Barros Simulation work on EAR2 Until March 2014 A.Tsinganis PhD Until end 2013 E.Chiaveri n_TOF Collaboration/Collaboration Board University of Bologna November 2013

Summary of n_TOF Team@CERN Physics Facility Design Facility Support F. Gunsing E. Chiaveri O. Aberle C. Guerrero ( until end 2014) V. Vlachoudis S. Montesano C. Weiss M. Calviani Tsinganis (until end 2013) S. Barros (until March 2014) Masi + Team M. Abate (from Feb.2014) A. Hernandez-Prieto (until August 2014) A. Ferrari Other members of the Collaboration for period at CERN R.Losito E. Chiaveri: EAR2 Project Leader F. Gunsing & N. Colonna: Chairmen of n_TOF analysis group from January 2014 E.Chiaveri n_TOF Collaboration/Collaboration Board University of Bologna November 2013 E.Chiaveri