Presented by Cory Foreman

Slides:



Advertisements
Similar presentations
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
Advertisements

1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Introduction to Compliance Assistance Documents Part I.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Water Management Options for Surface Drainage RED RIVER BASIN TECHNICAL AND SCIENTIFIC ADVISORY COMMITTEE (BTSAC) BRIEFING PAPER #3 September, 2014 BTSAC.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Anne Arundel County Department of Public Works. OBJECTIVE MINIMIZE OR ELIMIINATE FLOODING FROM FREQUENT SMALL STORMS Storms of 1- to 2-year frequency.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
CHARACTERISTICS OF RUNOFF
Using Rainwater to Grow Livable Communities Sustainable Stormwater Best Management Practices (BMPs)
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
Fact : Storm water is an important natural resource that should be used to replenish our Groundwater.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Background and Overview Stormwater NPDES Compliance For New Developments.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Integrated Regional Watershed Management Plan Presentation – November 21, 2013 HLVRCD.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Western Washington Hydrology Model 2005 AWRA Annual Conference Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Town of Brighton, Department of Public Works
Jefferson County SA Red Rocks Site Approval
Scoping Meeting April 20th 6:00 pm
SPU Modeling & Monitoring
DES 606 : Watershed Modeling with HEC-HMS
STORMWATER MANAGEMENT
The Drainage Basin System
City Council Meeting December 20, 2016
Highway Drainage-Hydrology
Babcock Basin-Design Phase
Sacramento County Stormwater Quality Program
Hydrologic River Routing
SEQRA as a Tool to Review Energy Projects
EPA Public Meeting Dallas, Texas May 10, 2005
Hydrology CIVL341.
MS4 OVERVIEW 2015.
Hydrology CIVL341 Introduction
Reducing Stormwater with Trees and Native Plants
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Sacramento County Stormwater Quality Program
Presentation transcript:

Presented by Cory Foreman To change background picture, right click on the picture and select “change picture” HLC FEASIBILITY STUDY Stormwater Treatment and Runoff Reduction PROJECT MEETING March 6, 2014 Presented by Cory Foreman Innovation • Collaboration • Inspiration October 05, 2011 Thinking Together to Inspire

Outline of Project Scope and Schedule Project Coordination (continuing) Solicit Stormwater Quality Needs Obtain Development and Stormwater Improvement Plans Obtain Information on Stormwater Problems at HLC Avoid Duplication of Effort Solicit Input on Others to Participate Two Formal Presentations Study Mapping (done) Use Previously Prepared Mapping Identify Headgates/Users, Stormwater Inflow and Outflow Locations, Existing and Future Stormwater Crossings Water Quality Hydrology (done) Peak Flow Rates and Annual Volumes per Segment (of runoff water needing treatment) Evaluate Impacts of Upstream Detention (w or w/o WQ)

Outline of Project Scope and Schedule Canal Water Quality Hydraulic Characteristics (in process) Estimate Annual Volume of Water Lost to Evapotranspiration, Evaporation, and Seepage Estimate Volume of Storage Available for Stormwater Use Conceptual Plan Development (in process) Plan for Integration into the HLC Type and configuration of Bioretention WQ Facilities Strategies to Address Aesthetic and Water Rights Issues Plan for Stormwater WQ Diversion Into and Out of the HLC Estimates of Improvement, Operation/Maintenance Costs Conceptual Plan Evaluation Quantify Benefits Identify Constraints and Solutions for Implementation Evaluate Economic Feasibility

Outline of Project Scope and Schedule Pilot Project Preliminary Design Downstream of Fairmont Cemetery Project Schedule 300 days (10 months) Month 1 - Study Mapping Months 2, 3, and 4 – Water Quality Hydrology and Canal Water Quality Hydraulic Characteristics Months 5, 6, and 7 – Conceptual Plan Development Months 8, 9, and 10 – Conceptual Plan Evaluation and Pilot Project Preliminary Design Deliverables Written Report Feasibility Drawings Compatible with ArcView Technical Appendix

Design Reach Comments Douglas County Reach 2 – Little Willow Creek enters directly into the canal at the upstream end of the reach

Design Reach Comments Douglas County Stormwater discharges to Mclellen Reservoir – Discouraged in the past Owned/operated by City of Englewood

Design Reach Comments City of Littleton Stream stabilization project on Jackass Gulch (2014) Reach 16 - Discharge to roadside ditch, extend to existing storm sewer?

Design Reach Comments City of Littleton Discharge to Horseshoe Park, adjacent neighborhood has a strong interest in this natural open space. Public outreach is strongly encouraged during the design process.

Design Reach Comments SEMSWA Discharge point at Orchard Road, storm sewer shown does not exist. (SEMSWA GIS data shows a 24” RCP) Orchard Road gutter flow could be diverted into canal

Design Reach Comments SEMSWA Reach 18 – 60” RCP inflow location

Design Reach Comments SEMSWA/UDFCD Add an inflow location at Iliff Ave. Iliff Ave Corridor Study, canal could provide WQCV for tributary areas east of canal

Design Reach Comments Greenwood Village Reach 23 exists in a “horseshoe”, naturally drains to canal Reach discharges to a CDOT system (University Blvd) Ridge down the center of the basin, flows north and south

Design Reach Comments Greenwood Village Reach 25 – Inflow/discharge locations at existing EDBs Reach 26 - Greenwood Gulch flows into the canal and discharges further downstream

Pilot Reach Selection Pilot Reach Selection Selection Criteria Downstream of current canal users (Fairmount Cemetery?) Reach that spans multiple jurisdictions Detailed mapping already available 1-ft contour mapping preferable Storm sewer survey or as-built drawings available for entire reach at the inflow / outflow locations Locations available for new forebays with maintenance accessibility Minimal existing water quality facilities in the tributary watershed Diversions into and out of canal hydraulically feasible without large extensions of storm sewers

Pilot Reach Selection Pilot Reach Selection Pilot reach would include Denver and Aurora

Water Rights / Water Quality Excerpts from Sate Engineer’s “Policy” as of May 21, 2011 Administrative Approach for Storm Water Management The detention areas must release all of the water detained from the site within 72 hours of the end of a precipitation event. Such detention should be designed to release the water from the site as quickly as downstream conditions allow and should minimize consumption from vegetation. An infiltration area must be designed to infiltrate the water as quickly as possible and shall not result in an exposed water surface beyond 72 hours after the end of a precipitation event. An infiltration area must be designed to minimize consumption from vegetation. Focus is on whether there is a significant identifiable increase in evapotranspiration from vegetation over the current conditions due to the construction of the water quality facilities Coordinating with Denver Water on this evaluation Adjusting design reaches to observe natural watershed boundaries

Water Rights / Water Quality Using WQ-COSM to determine historical number, frequency, and size of storm events Use storm event data to compute estimated percent removal of storm water pollutants based upon the volume stored and released over 72 hours. Use historic data on infiltration to estimate approximate amount of additional pollutant removal in portion of runoff estimated to infiltrate. Prepare a summary of the expected performance of the individual canal reaches and a cumulative summary of the potential pollutant removal from the entire High Line Canal system.

Benefits / Costs Analysis Construction costs In-canal facilities (structures / construction and maintenance access) Diversion and return facilities (structures, pipes, and energy dissipation) Forebay or equivalent sediment removal facilities / structures Upstream storm sewer extensions for hydraulic feasibility Return flow pipelines to appropriate return flow locations Easements / right-of-way and permitting Operation and maintenance costs Facilities upkeep / repair / replacement Debris and sediment removal and disposal

Benefits / Costs Analysis Quantified monetary benefits Tree watering costs provided in the HLC Preservation and Enhancement Planning Study (HLC Working Group). Estimate the extent that these costs may be reduced by the proposed improvements Reduced need and costs for construction of local water quality facilities as may be needed to meet stormwater permit requirements Qualified monetary benefits Estimated removal percentages and amounts of various pollutants Estimated value of retained recreational use and retained trees Other benefits?

Coming Up… Water Rights / Water Quality Cost Estimates of Facilities Water rights review Quantification of water quality benefits Cost Estimates of Facilities Discussion of Conceptual Design Issues Draft Report