EHN1 Cryogenics Integration

Slides:



Advertisements
Similar presentations
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Advertisements

NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Proposal of RP Control Area adapted to the evacuation campaign of radioactive waste from CERN radioactive storage Yann PIRA, Chris THEIS, Kurt WEISS 19/05/15,
CRYOGENICS AND POWERING
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
ICARUS Collaboration Meeting Dec A. Scaramelli.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
The Next Generation of a Gamma Irradiation Facility GIF++
Update on the PSB Cooling and Ventilation Systems
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Installation of the T600 at Fermilab
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Magnet cryogenic system update.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Proximity Cryogenics P&IDs Meeting
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Experimental hall design in Japanese site
Proximity Cryogenics P&IDs meeting
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Budget specification EHN1 Extension: Infrastructure (WG2)
SBN Far Detector integration model overview
CE Status: Activities executed until 03/08 and ongoing
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
FRESNO COUNTY WEST ANNEX JAIL
CRYOGENICS OPERATIONS 2008 Organized by CERN
COOLING & VENTILATION INFRASTRUCTURE
Cryogenic cavern in Asian site
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Presentation transcript:

EHN1 Cryogenics Integration 14/04/2016 J.Creus Prats - CERN

Content Layout Overview NP-02 Proximity Cryogenics External Cryogenics Industrial Utilities Crane Clearance Conclusions 14/04/2016 J.Creus Prats - CERN

CERN Site Prevessin ( FRANCE) Layout Overview External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN

NP-02 Proximity Cryogenics External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN

NP-02 Proximity Cryogenics NP-02-60-NP NP-02-40-F1 NP-02-40-CA NP-02-40-AP NP-02-70-F3 NP-02-40-PM NP-02-40-CP NP-02-40-F2 NP-02-30-A15 14/04/2016 J.Creus Prats - CERN

NP-02 Proximity Cryogenics NP-02-30-A1 NP-02-10-N1 NP-02-10-N4 NP-02-10-N2 NP-02-30-A12 NP-02-30-A3 NP-02-30-A0 NP-02-30-A16 NP-02-30-A8 NP-02-30-A10 NP-02-30-A6 NP-02-30-A9 NP-02-30-A7 NP-02-30-A2 NP-02-30-A4 NP-02-30-A5 NP-02-30-A13 supply supply 14/04/2016 J.Creus Prats - CERN

NP-02 Proximity Cryogenics CRYOSTAT WALKWAY LAr LOW DISCHARGE GAr HIGH RETURN LN2 HIGH COOLING NO WALK 14/04/2016 J.Creus Prats - CERN

NP-02 Proximity Cryogenics FILTER EXTRACTION ZONE PLATFORM AREA WA105- B182 Prior Art 1.8 m concrete boards 3.2 m BEAM BEAM BEAM BEAM 14/04/2016 J.Creus Prats - CERN

NP-02 Proximity Cryogenics Integration Report Interactions EHN1 Extension External Cryogenics Internal Cryogenics Experiment Beam Experiment Assembly Radiation Protection Resolved Issues 1 Filter Removal: extraction of concrete boards and integration of platform to support the chemical filters Modifications in utilities routing to allow safe handling of filters in the beam floor Crane cabin exclusion zone required 2 Best effort to adapt supply lines to the external cryogenics layout 3 Adaptation of supply lines to allow access platform to the cryostat top Definition of no pass zone after cryogenic liquid discharge pipes 4 Proximity cryogenics allows the removal of all close beam magnets 5 Proximity cryogenics does not interfere with the experiment assembly 6 Extraction of concrete blocks near beam reported to RP 14/04/2016 J.Creus Prats - CERN

NP-04 Proximity Cryogenics External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN

NP-04 Proximity Cryogenics NP-04-60-NP NP-04-40-F2 NP-04-40-CA NP-04-40-AP NP-04-70-F3 NP-04-40-PM NP-04-40-CP NP-04-40-F1 NP-04-40-CU 14/04/2016 J.Creus Prats - CERN

NP-04 Proximity Cryogenics NP-04-30-A8 NP-04-30-A6 NP-04-30-A9 NP-04-30-A10 NP-04-10-N2 NP-04-30-A5 NP-04-30-A4 NP-04-30-A1 NP-04-30-A7 NP-04-30-A2 NP-04-30-A13 NP-04-30-A12 NP-04-10-N1 NP-04-30-A16 NP-04-30-A3 NP-04-30-A14 supply supply 14/04/2016 J.Creus Prats - CERN

NP-04 Proximity Cryogenics CRYOSTAT WALKWAY LAr LOW DISCHARGE GAr HIGH RETURN NO PASS 14/04/2016 J.Creus Prats - CERN

NP-04 Proximity Cryogenics Integration Report Interactions EHN1 Extension External Cryogenics Internal Cryogenics Experiment Beam Experiment Assembly Radiation Protection Resolved Issues 1 Filter Removal: integration of dedicated platform for filter removal Best effort to route supply lines through EHN1 extension Crane cabin exclusion zone required 2 Best effort to adapt supply lines to the external cryogenics layout 3 Definition of no virtual pass zone after cryogenic liquid discharge pipes ( to date, pass zones in the cryostat are not defined ) 4 Proximity cryogenics have no interaction with beam magnets 5 Proximity cryogenics does not interfere with the experiment assembly 6 No relevant RP interaction reported 14/04/2016 J.Creus Prats - CERN

CERN Site Prevessin ( FRANCE) External Cryogenics External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN

External Cryogenics 10 m 20 m 10 m CENDUNCG0003 CENF-ARC1-0887-0404_G 14/04/2016 J.Creus Prats - CERN

External Cryogenics WALK AREA NP-02-00-VA NP-02-70-RB NP-02-20-AT NP-02-10-N1 NP-02-30-A1 NP-02-20-AT NP-02-20-NT NP-02-40-FL NP-02-70-RB NP-04-30-A1 NP-04-10-N1 NP-02-00-VA TO FILTERS TO PURIF. 14/04/2016 J.Creus Prats - CERN

External Cryogenics Integration Report Interactions Resolved Issues EHN1 Extension Proximity Cryogenics Industrial Utilities Resolved Issues 1 Passage of access and emergency doors guaranteed Integration of cryogenic piping in two opening on the EHN1 extension wall 2 Centralized filtering of LAr cryogenic supply Large area allocated for the storage of GAr+H2 mixture bottles in external area as well as GAr+H2 mixing and handling station Centralized LAr vaporizer to supply both experiments with gaseous argon. 3 Request to move electrical container far from cryo area to facilitate cryogenic supply truck access 14/04/2016 J.Creus Prats - CERN

Industrial Utilities Compressed Air Electrical Power Cooling Water Flow 20 m3/h Pressure 9 bar Electrical Power Voltage 3ph - Δ220/Y380 V Frequency 50 Hz Power TBD kW UPS 20 kW/h Cooling Water Not required 14/04/2016 J.Creus Prats - CERN

CRANE CABIN EXCLUSION ZONE REQUIRED FOR NP-02 AND NP-04 Crane Clearance SOUTH-WEST VIEW NORTH-EAST VIEW NP-02 NP-04 1.8 m 1.6 m CRANE CABIN EXCLUSION ZONE REQUIRED FOR NP-02 AND NP-04 14/04/2016 J.Creus Prats - CERN

14/04/2016 J.Creus Prats - CERN