EHN1 Cryogenics Integration 14/04/2016 J.Creus Prats - CERN
Content Layout Overview NP-02 Proximity Cryogenics External Cryogenics Industrial Utilities Crane Clearance Conclusions 14/04/2016 J.Creus Prats - CERN
CERN Site Prevessin ( FRANCE) Layout Overview External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN
NP-02 Proximity Cryogenics External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN
NP-02 Proximity Cryogenics NP-02-60-NP NP-02-40-F1 NP-02-40-CA NP-02-40-AP NP-02-70-F3 NP-02-40-PM NP-02-40-CP NP-02-40-F2 NP-02-30-A15 14/04/2016 J.Creus Prats - CERN
NP-02 Proximity Cryogenics NP-02-30-A1 NP-02-10-N1 NP-02-10-N4 NP-02-10-N2 NP-02-30-A12 NP-02-30-A3 NP-02-30-A0 NP-02-30-A16 NP-02-30-A8 NP-02-30-A10 NP-02-30-A6 NP-02-30-A9 NP-02-30-A7 NP-02-30-A2 NP-02-30-A4 NP-02-30-A5 NP-02-30-A13 supply supply 14/04/2016 J.Creus Prats - CERN
NP-02 Proximity Cryogenics CRYOSTAT WALKWAY LAr LOW DISCHARGE GAr HIGH RETURN LN2 HIGH COOLING NO WALK 14/04/2016 J.Creus Prats - CERN
NP-02 Proximity Cryogenics FILTER EXTRACTION ZONE PLATFORM AREA WA105- B182 Prior Art 1.8 m concrete boards 3.2 m BEAM BEAM BEAM BEAM 14/04/2016 J.Creus Prats - CERN
NP-02 Proximity Cryogenics Integration Report Interactions EHN1 Extension External Cryogenics Internal Cryogenics Experiment Beam Experiment Assembly Radiation Protection Resolved Issues 1 Filter Removal: extraction of concrete boards and integration of platform to support the chemical filters Modifications in utilities routing to allow safe handling of filters in the beam floor Crane cabin exclusion zone required 2 Best effort to adapt supply lines to the external cryogenics layout 3 Adaptation of supply lines to allow access platform to the cryostat top Definition of no pass zone after cryogenic liquid discharge pipes 4 Proximity cryogenics allows the removal of all close beam magnets 5 Proximity cryogenics does not interfere with the experiment assembly 6 Extraction of concrete blocks near beam reported to RP 14/04/2016 J.Creus Prats - CERN
NP-04 Proximity Cryogenics External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN
NP-04 Proximity Cryogenics NP-04-60-NP NP-04-40-F2 NP-04-40-CA NP-04-40-AP NP-04-70-F3 NP-04-40-PM NP-04-40-CP NP-04-40-F1 NP-04-40-CU 14/04/2016 J.Creus Prats - CERN
NP-04 Proximity Cryogenics NP-04-30-A8 NP-04-30-A6 NP-04-30-A9 NP-04-30-A10 NP-04-10-N2 NP-04-30-A5 NP-04-30-A4 NP-04-30-A1 NP-04-30-A7 NP-04-30-A2 NP-04-30-A13 NP-04-30-A12 NP-04-10-N1 NP-04-30-A16 NP-04-30-A3 NP-04-30-A14 supply supply 14/04/2016 J.Creus Prats - CERN
NP-04 Proximity Cryogenics CRYOSTAT WALKWAY LAr LOW DISCHARGE GAr HIGH RETURN NO PASS 14/04/2016 J.Creus Prats - CERN
NP-04 Proximity Cryogenics Integration Report Interactions EHN1 Extension External Cryogenics Internal Cryogenics Experiment Beam Experiment Assembly Radiation Protection Resolved Issues 1 Filter Removal: integration of dedicated platform for filter removal Best effort to route supply lines through EHN1 extension Crane cabin exclusion zone required 2 Best effort to adapt supply lines to the external cryogenics layout 3 Definition of no virtual pass zone after cryogenic liquid discharge pipes ( to date, pass zones in the cryostat are not defined ) 4 Proximity cryogenics have no interaction with beam magnets 5 Proximity cryogenics does not interfere with the experiment assembly 6 No relevant RP interaction reported 14/04/2016 J.Creus Prats - CERN
CERN Site Prevessin ( FRANCE) External Cryogenics External Cryogenics NP-04 EHN1(887) CERN Site Prevessin ( FRANCE) NP-02 14/04/2016 J.Creus Prats - CERN
External Cryogenics 10 m 20 m 10 m CENDUNCG0003 CENF-ARC1-0887-0404_G 14/04/2016 J.Creus Prats - CERN
External Cryogenics WALK AREA NP-02-00-VA NP-02-70-RB NP-02-20-AT NP-02-10-N1 NP-02-30-A1 NP-02-20-AT NP-02-20-NT NP-02-40-FL NP-02-70-RB NP-04-30-A1 NP-04-10-N1 NP-02-00-VA TO FILTERS TO PURIF. 14/04/2016 J.Creus Prats - CERN
External Cryogenics Integration Report Interactions Resolved Issues EHN1 Extension Proximity Cryogenics Industrial Utilities Resolved Issues 1 Passage of access and emergency doors guaranteed Integration of cryogenic piping in two opening on the EHN1 extension wall 2 Centralized filtering of LAr cryogenic supply Large area allocated for the storage of GAr+H2 mixture bottles in external area as well as GAr+H2 mixing and handling station Centralized LAr vaporizer to supply both experiments with gaseous argon. 3 Request to move electrical container far from cryo area to facilitate cryogenic supply truck access 14/04/2016 J.Creus Prats - CERN
Industrial Utilities Compressed Air Electrical Power Cooling Water Flow 20 m3/h Pressure 9 bar Electrical Power Voltage 3ph - Δ220/Y380 V Frequency 50 Hz Power TBD kW UPS 20 kW/h Cooling Water Not required 14/04/2016 J.Creus Prats - CERN
CRANE CABIN EXCLUSION ZONE REQUIRED FOR NP-02 AND NP-04 Crane Clearance SOUTH-WEST VIEW NORTH-EAST VIEW NP-02 NP-04 1.8 m 1.6 m CRANE CABIN EXCLUSION ZONE REQUIRED FOR NP-02 AND NP-04 14/04/2016 J.Creus Prats - CERN
14/04/2016 J.Creus Prats - CERN