SAE International Standards- G24 Pb-free Risk Mitigation for ADHP

Slides:



Advertisements
Similar presentations
1 Project A6A AS Aerospace - Flight Control Systems, Design, Installation, and Test Of Piloted Military Aircraft, General Specification For.
Advertisements

1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Joint Working Group for DoD Systems Engineering Standardization
FACE Consortium Organization Structure & Group Charters
A Review ISO 9001:2015 Draft What’s Important to Know Now
© Copyright BAE Systems and Celestica 2015 PERM Tin whiskers users group: 8-81H Risk modeling Stephan Meschter BAE Systems PERM 23 AVSI Texas A&M Feb 4,
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
Mission Success Starts With Safety 07/19/2001 (1) NASA EEE Parts Assurance Group (NEPAG) Quality Leadership Forum July 19, 2001 Michael J. Sampson NEPAG.
International Aerospace Quality Group (IAQG) Informational Overview 28th June 2001 Gary Baker ~ Americas Sector Leader ~
TC Chair Training Cynthia Gage TAC Training Coordinator June 2014.
Pb-Free Electronics Risk Management (PERM). What PERM is: A Consortium sponsored by the Aerospace Industries Association (AIA) Includes industry and government.
1 Criteria for a Successful FMEA Design & Process.
1 EU Directives and Their Impact on the Aerospace Industry DSPO Conference March 5, 2008 Rusty Rentsch, Aerospace Industries Association Director, Life.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
1 Overview of SAE’s AS6500 “Manufacturing Management Program” David Karr Technical Advisor for Mfg/QA AFLCMC/EZSM
MLR Associates 9/22/ Park Center Drive, #A1612, Alexandria, VA 22302, Voice: ; (Cell) Fax:
Update on Pb-free Electronics in Military Systems David Locker.
Rockwell Collins, Cedar Rapids, IA
Pb-free Electronics Risk Management (PERM) Council
Pb-free Electronics Risk Management (PERM) Council
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
VHT SG Report to EC Date: Authors: November 2008 April 2007
Pb-free Electronics Risk Management (PERM) Council
Pb-free Electronics Risk Management (PERM) Council
PERM Tin whiskers users group: 8-81H Risk modeling
IFSP Aligned with the Early Intervention Data System
Safeguards- Feedback on Safeguards ED-2 and Task Force Proposals
Reliability Assessment Committee Proposal TSS Meeting
ASHRAE Handbook Training
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Guide Strawman Approach 27 April 2017
Updates from SC18 Summer Meeting
Enterprise information & data management (EIdm) committee
Overview of SAE’s AS6500 “Manufacturing Management Program”
AAQG Registrar Management Committee (RMC) SAE AS9104/AIR5359 OVERSIGHT RMC Procedure 102 REV 5 Changes 15-Sep-18.
G-19 Counterfeit Electronic Components Committee Standards Development Progress March 2008 Phil Zulueta CQSDI - March 3 & 4, 2008 NASA QLF - March.
International Aerospace Quality Group (IAQG)
Statistical Product Acceptance
Pb-Free Design/Implementation Guide - Overview
Americas Aerospace Quality Group AAQG Project Management
Multi-Sectoral Nutrition Action Planning Training Module
Structure–Feedback on Structure ED-2 and Task Force Proposals
AM Business Model Wargame Working Team Documentation
API 14H Task Group Status Proper Classification of Document
Specification on float equipment
AM Business Model Wargame Working Team Documentation
First 8 slides are what was presented in San Fransisco…
APF Study Group Agenda September 13, 2004 September 2004
IEC Maintenance Committee Report
Pb-Free Design/Implementation Guide Team Update for PERM 33
Accredited Standards Committee C63® - EMC
Project Management Process Groups
Reliability Standards Development Plan
Recommended Draft Policy ARIN : Eliminate HD-Ratio from NRPM
API 14H Task Group Status Proper Classification of Document
Team T3 (#3) Tom Lastoskie Lead.
Counterfeit Parts Committee
Working Group Meeting Report
Proposed Modifications to VHT60 PAR
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group.
Proposed Modifications to VHT60 PAR
Global Aerospace Industry; One Common Approach
Proposed Modifications to VHT60 PAR
Impact of the Öko-Institut Recommendations on an Avionics OEM :
July 19 doc.: IEEE /424r1 March 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4a Closing.
IEEE RS Standards Status and Descriptions
Presentation transcript:

SAE International Standards- G24 Pb-free Risk Mitigation for ADHP July 2017 Anduin E. Touw Chair, G24

G24 Scope Pb-free Risk Management for ADHP Committee develops standards and specifications for Pb-free electronics risk management for the aerospace, defense and high performance electronics industries. The committee also provides input to government and other industry standards related to Pb-free electronics risk management. It does not develop or revise workmanship and manufacturing standards. Objectives Develop and maintain standards, handbooks, and guidance documents for managing risk associated with Pb-free electronics; Provide recommendations to government and other industry activities regarding standards that include Pb-free risk management clauses; Coordinate activities with the IPC PERM Council, other SAE committees (including SSTC APMC, SSTC G-12, and SSTC G-11), and International Electrotechnical Commission (IEC) Technical Committee 107. G24 Pb-free Risk Management for ADHP

Current G24 Voting Members Jay Brusse (NASA) David Burdick (Boeing) Minerva Cruz (Six Sigma) Steven Davidson (Northrop Grumman) Dennis Fritz (SAIC) Ben Gumpert (Lockheed Martin) Joel Heebink (Honeywell) David Hillman (Rockwell Collins) Joseph Juarez (Honeywell) Milea Kammer (Honeywell Jeff Kennedy (Celestica) Andrew Kostic (Aerospace Corp) Jayanth Kygonhali (BGA Test & Technology) David Locker (US Army) Stephan Meschter (BAE) Mick Miller (US Navy) Catherine Munier (Airbus) David Pinsky (Raytheon) Anthony Rafanelli (Raytheon) David Redman (AVSI) Robert Ricco (Northrop Grumman) Stephen Ring (Forsite) Alexandre Santos (Embraer) William Scofield (Boeing) Robert Tipton (Wyle) Anduin Touw (Boeing) Don Tyler (Corfin) Linda Woody (Consultant) Joe Zaccari (Zaccordix) 29 voting members. >=15 participating for quorum. G24 Pb-free Risk Management for ADHP

Current WIP Status GEIAHB0005_1A Program Management/Systems Engineering Guidelines for Managing the Transition to Lead-Free Electronics Feb 24, 2016 Revised GEIAHB0005_2 Technical Guidelines for Aerospace and High Performance Electronic Systems Containing Lead-free Solder and Finishes Jun 17, 2016 Reaffirmed GEIAHB0005_3 Rework/Repair Handbook to Address the Implications of Lead-Free Electronics and Mixed Assemblies in Aerospace and High Performance Electronic Systems Sep 17, 2015 GEIASTD0005_1A Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-free Solder Mar 01, 2012 GEIASTD0005_2A Standard for Mitigating the Effects of Tin Whishers in Aerospace and High Performance Electronic Systems May 01, 2012 GEIASTD0005_3A Performance Testing for Aerospace and High Performance Electronic Interconnects Containing Pb-free Solder and Finishes Dec 01, 2012 GEIASTD0006A Requirements for Using Robotic Hot Solder Dip to Replace the Finish on Electronic Piece Parts G24 Pb-free Risk Management for ADHP

GEIA-STD-0005-1: Revision Team Leads: Joe Zaccari, Milea Kammer, Gary Latta (roles TBD) Intent of Revision Restructure/Clarify Allow users to tailor Define 3 unique sections Tin Whiskers Pb-free Solder Alloys Commercial Off the Shelf (COTS) Assemblies Stream line What (Standard) vs. How (Handbook) Review Shall Statements Intent? Actionable? Auditable? NOTE: It should be the goal of the team to align the content of the -1 standard with that of the -1 handbook (May want to consider simultaneous or back-to-back revisions) G24 Pb-free Risk Management for ADHP

GEIA-STD-0005-1: Suggestions from PERM 31 Change title to: Standard for Managing the Risks of Solders and Finishes in ADHP Electronic Systems Use LFRMP (Lead Free Risk Management Plan) instead of LFCP (Leaf Free Control Plan) Eliminate “Shalls” in scope Create an applicability matrix for: Tin Lead Lead Free Mixed alloys Other planned actions Revise Scope Review verification matrix G24 Pb-free Risk Management for ADHP

GEIA-STD-0005-1: Technical Items Not Address in REV A Qualification by similarity What are the criteria for similarity? How to do LFCP if Pb-free is restricted or prohibited? Beef-up COTS section G24 Pb-free Risk Management for ADHP

GEIA-STD-0005-2: Revision Team Lead: Anduin Touw Intent of Revision Address Technical Gaps / New Information Conformal Coat studies Potting and encapsulation “Self Mitigation” / Pb poisoning Beef up COTS section Streamline / Readability Plan on having Thursday meeting starting in Sept, once or twice a month Please contact Anduin if interested in participating G24 Pb-free Risk Management for ADHP

ARP6415: Reballing vs. Mixed Alloy Team Lead: Ben Gumpert Intent: Overall approach for use of Pb-free BGAs Guidance document Awareness for general processes and risks Guidance steps to evaluate approach Status Completed detailed outline Defined intent and flow of document Current Activity Working on rough draft text G24 Pb-free Risk Management for ADHP

ARP6537: Pb-free Solder Bumps & Other Part Level Pb-free Uses Team Lead: Anduin Touw & Paul Nixon Intent: Beginning with use of Pb-free solder bumps, develop appropriate mitigations, tests, and screens to determine if specific uses of Pb-free solders within piece parts pose a risk to mil-aero applications Create criteria for accepting Pb-free solders inside piece parts Provide guidance to DLA on modifications to requirements in MIL-PRF-38535 and other part level mil specs with regards to use of Pb-free solder Status Have held 3 telecons Current Activity Gathering data on technical issues Meeting monthly on Thursday near end of month (looks like we are setting on 10am pacific, 1pm eastern) G24 Pb-free Risk Management for ADHP

ARP6537: Specific Technical Concerns 2 Areas of Concern for Pb-free Solders Risk of tin whiskers Durability of the solder in applications Each of these areas need to be addressed in any criteria for use of Pb-free solders in piece parts Plan on using Pb-free solder bumps as the initial case study but may have implications for other uses of Pb- free solders G24 Pb-free Risk Management for ADHP

ARP6537: Tin Whiskers & Underfill Concerns for underfill How do we determine if underfill material is hard enough to encapsulate whiskers? How do we determine if underfill material will maintain this property over aging? How do we evaluate the underfill process / outcome to make sure there are not significant voids that would allow whiskers to grow between bumps? How do we make sure the underfill “does no harm”? G24 Pb-free Risk Management for ADHP

ARP6537: Durability There have been issues with BGA balls and other solder joints cracking or showing early wear-out in TC or vibe The concern is that solder bumps may show the same behavior Should be lower risk due to smaller masses but still needs to be investigated Approach may be to determine appropriate qual test to evaluate design and process What tests would be appropriate? How would normal part level test qualifications (like test methods in 883) need to be adjusted for Pb-free solder? G24 Pb-free Risk Management for ADHP

Other Document Status GEIA-STD-0005-3 (Test Doc) hits its 5-year review at the end of this year Will we have bandwidth to work on that document once the IPC Design Guide is balloted? Should GEIA-HB-0005-1 (Program Manager’s Guide) be reviewed in parallel to GEIA-STD-0005-1? GEIA-HB-0005-2 (Technical Guide) is very out of date. We reaffirmed it last year to “put on hold” but we need to revisit it Need lead with bandwidth to start looking at this, preferably before end of 2017 or early 2018 G24 Pb-free Risk Management for ADHP

New Business / Future Work Ideas Manager friendly document on advantages and disadvantages of tin mitigations Position on when to do life testing on GEIA-STD-0006 Pb-free assembly risk decision matrix (Steph) Design guide? Program Manager’s guide? New document? Training needs – work as we revise documents?

Questions? Anduin E. Touw Chair, G24 anduin.e.touw@boeing.com 703-455-6865 / 310-503-7827