EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION

Slides:



Advertisements
Similar presentations
Effective Contract Management Planning
Advertisements

Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Project Management Course outline neil.minkley.fr/epita anglais-pratique.fr
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
10 CFR 851 Worker Safety and Health Program Overview.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
QA Requirements for DOE Accelerator Safety System Software K. Mahoney Group Leader, Safety Systems TJNAF Presented at the 2008 DOE Accelerator Safety Workshop.
Carol L. Sohn Senior Nuclear Safety Advisor, Office of Science, SC-33 1 May 5, 2011 Review of Science Sites Hazard Categorization.
Tank Operations Contract 1 Presenters: Fred Beranek Everett Gray Results of EFCOG/DOE Safety Culture Pilot Focus Group Assessment DOE ISMS Conference August.
QUALITY ASSURANCE TRAINING DOE O 414.1C AND 10 CFR 830, SUBPART A
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Michael deLamare Requirements Management Program Functions R-9.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
Berkeley Lab Exposure Assessment: thoughts after an ISM Audit Tim Roberts, Industrial Hygiene Jim Floyd, ALS LBNL.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
APPROACH TO A FULLY INTEGRATED PERFORMANCE ASSURANCE SYSTEM Integrated Safety Management Summit Knoxville, TN August 24-27, 2009 Presented by: Gary Grant.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
EMS and Mortars: Environmental Management at the Army’s Chemical Weapons Destruction Facilities June 5, 2007.
Safety Configuration Management Process at JLab
Commissioning & Startup
NNSA Project Reviews NNSA Office of Project Analysis, Oversight, and Review (NA-APM-1.1) June 7, 2017 Dwight Henderson, Director
The Readiness Review Process – Mod 2
EFCOG Startup and Commissioning Task Team Introduction
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
The ORR/RA and the Authorization Basis May 2005 Revision
Bradley Smith February 28, 2017
Readiness Review Course
EFCOG Startup and Commissioning Task Team Introduction
NRC Update of Low Level Waste Emerging Issues
Project Management Processes
Readiness Review Course
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Food Production Systems
HSE Case: Risk Based Approach.
OHS Staff Introduction Training
EFCOG Startup and commissioning task team introduction
Adding Nuclear Power to the Grid
SNC/SCANA – New Build Configuration Management
Project Management Processes
Successfully Integrating NEPA and Environmental Permitting into a DoD Hazardous Waste Treatment Facility Construction Project to Meet Budget and Schedule.
TRTR Briefing September 2013
PSS verification and validation
Presentation transcript:

EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION Ross Hamlett February 28, 2017

EDUCATION AND EXPERIENCE BS Industrial Technology - Southern Illinois University at Carbondale US Navy Nuclear Propulsion Program – 7 years Trainee, Staff Instructor, Submarine Reactor Operator Supervisor Refueling overhaul 637 Class nuclear submarine including system acceptance, operational reactor safeguards exam (ORSE), initial criticality, sea trials, and first deployment. US Army Chemical Demilitarization – 9 years Tooele CDF – Startup Technician, Control Room Supervisor, Shift Plant Manager Supported or led various stages of facility startup and systemization (commissioning) Initial testing and tuning of 3 major furnace systems (liquid incineration and deactivation) Integrated operation and Permit testing (trial burns) for 4 major furnace systems Initial and production operation for weapons destruction Developed and implemented programs for limiting conditions for operations (LCOs), chemical material accountability, and waste tracking within exclusion areas. Pine Bluff CDF – Startup Engineering Supervisor Established Pre-Commissioning test program and implementing procedures. Commissioned analytical laboratory facility systems

EDUCATION AND EXPERIENCE (continued) Waste Treatment Plant Project – 15 years Operations Facility Lead Represented the facility operations organization for design input and issue resolution supporting High Level Waste and Low Activity Waste facilities. Process Controls Integration Manager, DCS Startup lead Established automation criteria, HMI standards, operator span of control, and test oversight process for control system software development. Led/managed software design review activities for the facility operations acceptance of software Led development of software quality graded approach strategies for plant software Commissioning Manager Established commissioning approach and sequence for the Direct Feed to LAW (DFLAW) systems Led proposal for AECOM commissioning scope, budget, and schedule for WTP DFLAW contract modification Requirements Area Manager for commissioning test program development Requirements Area Manager for turnover/transition program development

POTENTIAL GAPS, NEEDS, CONCERNS Clarify DOE O 413.3B requirements for startup of less than Hazard Category 3 facilities CRADs for assessment of “Readiness to Operate” for CD-4 Criteria for Hazard Analysis Report required for CD-4 Startup authorization authority and process Clarify expectations Contractor for test programs in DOE nuclear facilities. Requirements development and traceability (DOE O 414.1D) Graded approach to extent of testing and rigor (DOE G 413.3-4) Conduct of Testing program expectations (ASME NQA-1) Application of DOE standards vs. other consensus standards (e.g. DOE STD 1073) Other issues Clarification of DOE G 414.1-4 safety software vs. DOE STD 3009 safety SSCs Clarification of DOE O 413.3B process for phased project completion Clarification of functional and performance verification in relation to facility readiness (DOE O 425.1D) Clarification of hazard control requirements for startup (DOE STD 3009 vs 10 CFR 851)