Update on NPRR615 PVGR Forecasting

Slides:



Advertisements
Similar presentations
Page 1 ERCOT Project Status 1 ERCOT Dynamic Ratings METF March 29, 2012.
Advertisements

ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Bill Blevins Sep. 24, 2014 PV Forecasting RFP. 2 Projected Installed Capacity of PV in ERCOT.
NERC LTRA Update / CDR Capacity Counting Issues
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
RTWG Report to TAC August 5, 2010 Howard Daniels.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Emerging Technologies Working Group Update to WMS March 05, Contents I.Update on NPRR 588 II.Solar Forecasting: Protocol Revisions Needed III.Solar.
1 Periodic Revision Request Implementation Review – Q January 17, 2013.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRRs NPRR 681 Clarifications to Dynamic Ratings. This Nodal Protocol Revision Request (NPRR) adds clarification for Dynamic Ratings provided via ICCP.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Business Integration Update to PRS January 19, 2012.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
ERCOT Wind Forecast and Impact of Cold Weather Events Sandip Sharma ERCOT Operations.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Wind Power Forecasting CSD Bill Blevins.
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
Review of Integration of the Requirements of MOD Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation.
ERCOT Service Availability Metrics and Retail Systems Update April 2007.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
1 ORDC Curve Discussion ERCOT QSE Managers Working Group 9/4/2015.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity February 11, 2016 ERCOT Public.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
QSE Managers Working Group Meeting Notes 9 October, 2008 Report to WMS 22 October, 2008 David Detelich - Chairperson.
01/21/2009 Telemetry Process & Progress ERCOT State Estimator & LFC Team Operations Advanced Network Applications Support.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
IMM alternate framework for Look-Ahead SCED November 21, 2011.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
WMS UPDATE CMWG n CMWG has completed their data collection and evaluation of congestion n Based on this evaluation WMS recommends that the same CSCs with.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
1 TX SET Update to RMS March 14, Drop to AREP Changes PUCT Project oOne of TX SET 2007 goal is to evaluate approved Rulemakings and determine.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Settlement Update Austin Rosel ERCOT February 27, 2017.
Commercial Operations Subcommittee (COPS) Update to RMS 11/1/2016
Protocol Revision Subcommittee
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Wind Generation Operations
ERCOT Market Design & Operations
Verifiable Cost Working Group (VCWG) Update
August 25, 2016 TAC Update to COPS
Congestion Management and Ramp Rate for Delivering Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
NPRR 785 Q&A Operations Analysis 3/1/17.
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
ERCOT Holiday Interim Solution
Overview of New Control Room Desk
Project Update and Summary of Project Priority List (PPL) Activity
COPS Communication Conference Call
Generation Adequacy Task Force Update to WMS
Missed Postings July 2016 through August 22, 2016: Summary
The Problem: Our Solutions:
WIND TURBINE GENERATORS.
Smart Water Fund Products
by quantile regression
Presentation transcript:

Update on NPRR615 PVGR Forecasting ERCOT Staff March 1, 2016

ERCOT Solar Installations by Year

Solar Forecast Implementation Conducted RFP selecting MDA as our Solar Forecast vendor Pass solar observation data to MDA every 5 minutes Receive solar forecast from MDA hourly for the next 168-hour and distribute that to the Solar QSEs The Solar QSEs use that forecast to update their COP

Current Operating Plan (COP) Submission 3.9.1 Current Operating Plan (COP) Criteria (8) For the first 168 hours of the COP, a QSE representing a Wind-powered Generation Resource (WGR) must enter an HSL value that is less than or equal to the amount for that Resource from the most recent Short-Term Wind Power Forecast (STWPF) provided by ERCOT, and a QSE representing a PhotoVoltaic Generation Resource (PVGR) must enter an HSL value that is less than or equal to the amount for that Resource from the most recent Short-Term PhotoVoltaic Power Forecast (STPPF) provided by ERCOT.

COP Submission All photovoltaic solar units are updating their COP on an hourly basis.