Insulation vacuum seals M-ECCTD STATUS

Slides:



Advertisements
Similar presentations
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Advertisements

1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
ESS cavities interfaces
V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Signal port flange and beam pipe Norihito Ohuchi 2009/10/27122nd S1-G Webex meeting.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
ESS-Bilbao: MEBT vacuum standarization
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
1 LUND March 16 th, 2016 ESS ELLIPTICAL CRYOMODULE Vacuum vessel: Ports and sealing, Manufacturing feedback LUND, March 16th, 2016 Unité mixte de recherche.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Assembly of the doorknob
SPL RF coupler: integration aspects
TDR guideline discussion on Cavity Integration
CERN – Zanon discussions
Cryomodule test stand at ESS site
T5.2: Harmonization - Material and Component Reference
MICE Meeting at RAL, Oct-23, 2005
HFM Test Station Main Cryostat
Sensors in the S1-G Cryomodules (Updated )
Mathieu, Gabriel, Max, Spyros, Guillaume
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Cryostat design Mechanical design: Thermal screens: Specifications:
Floating Head Heat Exchanger
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
ESS elliptical cryomodule
SNS PPU Cryomodule Instrumentation
CEPC-650MHz Cavity Cryomodule
Prototype cryomodule development
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
CRYOMODULE FINAL ASSEMBLY
APTM and GRID interface requirement PBIP and PBW
BGC Collaboration Meeting –
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
(vertical cryostat, Gersemi)
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Insulation vacuum seals M-ECCTD STATUS Elastomeric O Ring everywhere, except: Windows (x4), CF63 copper Extremity central flat cover (x2), Metallic Helicoflex Coupler flange (x4), Metallic Helicoflex Rupture disk pipe (x2) Elastomer He valve (x2) Elastomer Feedthrough ports (x6) & connectors (x12) Elastomer Safety valve Elastomer Jumper connection Elastomer Jumper Elastomer instrumentation(x2) Elastomer Central flat cover (x2) Helicoflex Windows (x4) CF63 Copper Pumping port (x2?) Elastomer Trap doors (x8) Elastomer Jacks(x12) Elastomer Bell flange Elastomer Coupler He outlet (x4) Elastomer Tip flat cover (x2) Elastomer Coupler flange Helicoflex

M-ECCTD VANNES Tube enceinte D108,2x114,3 (Ep. 3,05) Bride enceinte D108,2x165 Ep. 12 Bride vanne Dext165, Ep. 12 8 vis CHc M8x40 sur D145 Joint élastomère D117x124x3,5 Gorge D117x125,5,5x2,6 M-ECCTD LIAISON MANCHETTE/COUDE JUMPER Tube coude D349,6x355,6 (Ep. 3) Bride coude D349,6x425, Ep. 18 Tube manchette D349,6x355,6 (Ep. 3) Bride manchette D349,6x425, Ep. 18 12 vis HM12x55 sur D395 Joint élastomère D359,3x370,7x5,7 Gorge D360x373,5x4,2 INTERFACE JUMPER Tube coude D349,6x355,6 (Ep. 3) Bride coude Dext451, Ep. 18 16 vis HM12x35 sur D410 Joint élastomère côté BAV SOUPAPE ENCEINTE Design idem spokes Joint élastomère D202,57x213,23x5,33 LIAISON ENCEINTE/JUMPER Tube enceinte D343,6x355,6 (Ep. 6) Bride enceinte D343,6x425, Ep. 20 Tube manchette D349,6x355,6 (Ep. 3) Bride manchette D349,6x425, Ep. 18 12 vis HM12x55 sur D395 Joint élastomère D359,3x370,7x5,7 Gorge D360x373,5x4,2 INSTRUMENTATION DN100 & POMPAGE VIDE Tube enceinte D108,2x114,3 (Ep. 3,05) Bride enceinte D108,2x165 Ep. 12 Bride couvercle Dext165, Ep. 12 8 vis CHc M8x40 sur D145 Joint élastomère D117x124x3,5 Gorge D117x125,5,5x2,6 INSTRUMENTATION DN160 Tube enceinte D150x159 (Ep. 4,5) Bride enceinte D150x225 Ep. 16 Bride couvercle Dext225, Ep. 16 8 vis HM10x50 sur D200 Joint élastomère D170,8x181,4x5,3 Gorge D171x183,5,5x3,9 LIAISON ENCEINTE/CLOCHE DISQUE RUPT. Tube enceinte D267x273,6 (Ep. 3) Bride enceinte D264x335, Ep. 16 Tube cloche D267x273 (Ep. 3) Bride cloche D264x335, Ep. 16 12 vis HM10x50 sur D310 Joint élastomère D279x286x3,53 Gorge D280x289x2,6 TRAPPES (A valider) Tube enceinte D349,6x355,6 (Ep. 3 à 6) Bride enceinte D425 Ep. 20 Couvercle D425, Ep. 20 (alu) 12 vis HM12x55 sur D395 Joint élastomère D359,3x370,7x5,7 Gorge D360x373,5x3,9 BRIDE COUPLEUR Bride coupleur D352 Ep. 25 Bride cloche D275x360 Ep. 20 18 vis HM10x35 sur D295 (Joint élasto. D320x330x5) Joint Helicoflex D324x334x5 Gorge D321,7x334,5x4,1 VERINS Tube enceinte D108,2x114,3 (Ep. 3,05) Bride enceinte D76x165 Ep. 12 (16) Bride couvercle D165, Ep. 12 8 vis CHc M8x40 sur D145 Joint élastomère D117,07x124,13x3,53 Gorge D117x125,5x2,6 SORTIE HELIUM COUPLEURS Tube enceinte D62,7x73,02 (Ep. 5,16) Bride enceinte D130 Ep. 12 Bride réchauffeur D130 Ep. 12 6 vis CHc M8x40 sur D110 Joint élastomère D85,3x92,3x3,53 Gorge D85x93,5x2,6 CLOCHE COUPLEUR Tube enceinte D445,2x457,2 (Ep. 6) Bride enceinte D435x540 Ep. 20 Tube cloche D400,4x406,4 (Ep. 3) Bride cloche D400,4x540 Ep. 20 16 vis HM12x55 sur D495 Joint élastomère D459,3x470,7x5,7 Gorge D460x473,5x4,2 FOND PLAT ENCEINTE Tube enceinte D1200x1220 Bride D1200x1344 Ep. 22mm (fond), 35mm (enceinte) 40 vis HM12x75 sur D1310 Joint élastomère D1243x1258x7,5 Gorge D1245x1263x5,2 FOND PLAT TRANSITION Bride 420x481 Ep. 12mm (fond), 24mm (transition) 40 vis CHc M8x25 sur D444 (Joint élasto. D459,3x470,7x5,7) Joint Helicoflex D460x470x5 Gorge D457,7x470,5x4,1

Vacuum vessel update for H-ECCTD & SERIEs Pipes for rupture disks (x2) Turned to aluminium gasket Helium valve(x2) Turned to alu. gasket Flange for rupture disk (x2) to rework by final machining 1 DN160 nozzle kept for contingency DN100 pumping port replaced by DN160 on the top of the vacuum vessel DN100 pumping removed for H-ECCTD and series Supports drilling to finalize

Insulation vacuum seals proposals for h-ecctd & series Elastomer: seals can be changed easily without removing the cryomodule from the beam line (maintenance operation) Aluminium: standard diameter Helicoflex: non standard or too big diameter Rupture disk pipe (x2) Aluminium DN250 He valve (x2) Aluminium DN100 Feedthrough ports DN160 (x4) & DN100 (x2) Elastomer or aluminium (elastomer for connectors) Safety valve Elastomer Jumper connection Elastomer Jumper Elastomer (x2) instrumentation(x2) Elastomer or aluminium Central flat cover (x2) Helicoflex Windows (x4) CF63 Copper Pumping port Aluminium DN160 Trap doors (x8) Elastomer Jacks(x12) Elastomer Coupler He outlet (x4) Aluminium DN63 Tip flat cover (x2) Elastomer Bell flange Elastomer Coupler flange Helicoflex

Insulation vacuum seals proposals for h-ecctd & series PRINCIPLES No permanent elastomeric seal due to radiations rate and normal ageing Elastomeric O Ring seals for gaskets that can be replaced easily during maintenance operations (no opening of extremity covers, therefore removing of the cryomodule) Aluminium for other gaskets with standard dimensions Special metallic references (Helicoflex or similar) for non standard dimensions Aluminium gaskets

Insulation vacuum seals proposals for h-ecctd & series

Pumping & connecting ports (H-ECCTD / series) ISO-F DN160 – 3 connectors - Heaters - CTS Motorization - CTS Piezo system ISO-F DN160 – 3 connectors - Level gauges - Cernox extremity & cavities 1/2/3 - Pt100-50K extremity & cavities 1/2 - Pt100-300K extremity & cavities 1/2 ISO-F DN160 – 3 connectors - Cernox extremity & cavity 4 - Pt100-50K extremity & cavity 4 - Pt100-300K extremity & cavities 3/4 ISO-F DN160 * Connecting port (H-ECCTD) (removed Instrumentation) * Contingency port (Series) - Cernox all cavities - Pt100 all cavities 1830 ISO-F DN160 pumping port 670 ISO-F DN100 – 2 N plugs - RF pick-up cavity 3 - RF pick-up cavity 4 ISO-F DN100 – 2 N plugs - RF pick-up cavity 1 - RF pick-up cavity 2 400