Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Advertisements

Environmental Project Commitments The Alberta Experience
One the things we found most troubling about the City’s Draft Environmental Impact Report (DEIR) was that there was no information included about your.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Baker Lake Community Information Session Public Hearing Decision September 1, 2009.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Hamlet of Rankin Inlet Type A Water Licence Application Role of Fish Habitat Management Fisheries and Oceans Canada Eastern Arctic Region Rankin Inlet.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Kiggavik Project Final Hearing Presentation
LOW-FLOW MONITORING IN SONOMA CREEK AND TRIBUTARIES In June 2000, Sonoma Ecology Center staff initiated a low-flow monitoring program in Sonoma Valley.
Morphum Environmental Ltd Environmental Engineers and Consultants
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Chapter 21: How We Obtain and Use Water. Water To understand water, we must understand its characteristics, and roles: –Water has a high capacity to absorb.
WATER, WATER EVERYWHERE? The Water Resources Management Committee of the American Public Works Association.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
HEA 1738 IC as amended Water Resource Allocation and Distribution in Indiana IDNR Division of Water.
Community Presentation Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut, Community and Government.
Sediment & Nutrient Management in the L’Anguille River Watershed St. Francis County Cost Share Project Patricia Perry St. Francis County Conservation.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Preparing For Drought Alexander Hinz Daniel Rice Dorothy Young ________________ Water Supply Division Texas Commission on Environmental Quality 2015 TCEQ.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
September 25, Who is Brushy Creek Regional Utility Authority? Local government corporation formed by Cedar Park, Leander and Round Rock to access,
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
1 Update to Dehcho Land Use Planning Forum on Draft Changes to Interim Dehcho Land Use Plan Update to Dehcho Land Use Planning Forum on Draft Changes to.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Ontario’s Drainage Legislation
Phase 2 Hope Bay Belt Project
Continuing Authorities Program
Erosion Hazard Near Sensitive Waterbodies
Winter application worksheet
Phase 2 Hope Bay Belt Project
The Woodlands - a Totally Planned Community
Meadowbank Water License Renewal
NORTH TRUNK SEWER REPLACEMENT PROJECT
Drought in Texas Texas Division of Emergency Management
Water, water everywhere
MPO School Transportation Working Group
The Woodlands - a Totally Planned Community
Watershed Management Plan Citizens Advisory Committee April 18, 2011
North Carolina Division of Water Resources
Pipeline Planning and Construction: Environmental Considerations
Delta Water Supply Project
MS4 OVERVIEW 2015.
Mary River Project Phase 2 Proposal Freshwater Environment
WATER, WATER EVERYWHERE?
City of Sunrise Wastewater Reuse Program
Update to Loxahatchee River Coordinating Council
Chapter Four RUNOFF When a storm occurs, a portion of rainfall infiltrates into the ground and some portion may evaporate. The rest flows as a thin sheet.
WHALE TAIL PIT Expansion Project
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Nunavut Water Board Public Hearing Rankin Inlet Type “A” Water Licence Amendment NWB Licence No. 3AM-GRA1015 September 25, 2014

Background Type “A” Water Licence No. 3AM-GRA1015 is held by the Department of Community and Government of Services, Government of Nunavut (GN-CGS): Authorizes water use from Nipissar Lake to supply the Rankin Inlet Utilidor and operation of the Sewage Treatment Facility Date of Licence Issuance: June 9, 2010 Expiry of Licence: May 31, 2015 Quantity of water use not to exceed 850,000 m3

Background In 2009, Elders and community members expressed concern to the Hamlet and GN-CGS that the water levels in Nipissar Lake were decreasing. GN-CGS engaged FSC (Stantec) and RMSi to complete the Water Supply Capacity, Consumption and Conservation Study to evaluate causes for decrease in water level. This study indicated that water usage in Rankin Inlet was higher than expected, due to leaks in the water distribution system and additional infrastructure development over the last 10 years. Pumphouse Historical Lake Outline 2009 Lake Outline

Background In 2010, GN-CGS contracted FSC (Stantec) to complete the design of a water resupply pipeline to replenish Nipissar Lake. In 2012, GN-CGS constructed the 4.05 km pipeline to pump water from Char River to Nipissar Lake. Construction began after freeze-up to minimize damage to the tundra. In 2014, GN-CGS, with the assistance of Stantec, submitted regulatory applications to NWB, NPC and NIRB to obtain approval to pump water from the Char River.

Planning Prior to completing detailed ground surveys, aerial photographs and digital mapping was reviewed for possible routing options. The typical pumping season would extend over a maximum of 3 months each year, from Mid-June to Mid-September. Two design options were considered: Option 1 followed the roadway between Nipissar Lake and Char River. This option had the disadvantage of going over a high point of land, and requiring stronger pumps and higher fuel consumption. Option 2 went overland from Char River to Nipissar Lake, with the routing selected to minimize elevation changes. Option 2 was ‘graded’ so that there is only one low point and only two high points along the pipeline, simplifying operation of the line.

Planning On September 29, 2010 FSC (Stantec) carried out a site meeting with representatives of the Community of Rankin Inlet and GN-CGS. The only concern mentioned, which applied to either Option, was that there was a portion of both routes that crossed a primary snowmobile route near Lower Landing Lake. It was agreed that a portion of the route (centered on where the pipeline crossed the road to the river) should be buried to prevent interference by the pipe to snowmobiles. It was agreed that Option 2 was the preferred solution for the overland pipeline resupply.

Pipeline Design Pipeline design features include: Screened water intake pipeline located in the Char River extending from the intake location to the pump 75 horsepower intake pump 4.05 km of HDPE pipeline Two high point releases and one low point drain One seacan to house intake pipe and pump during the winter

Pipeline Design The screened intake is connected to a seasonal flexible intake line. This flexible intake line will be installed at the beginning of the spring pumping season and removed at the end of the pumping session. The line is connected to trailer mounted, self-contained diesel powered pump with spill protection. The pump is capable of supplying 0.04 m3/s. The pipeline terminates at near the shore of Nipissar Lake.

Operation Regular monitoring of the flow rate of the Char River will take place during operation. Adhere to a maximum withdrawal rate of 10 % of the flow rate and in-stream minimum depth of 0.5 m. Pumping will cease if this minimum cannot be maintained. Complete annual monitoring to ensure natural drainage is not obstructed. Implement sediment and erosion prevention and control measures Implement spill prevention and response protocols.

Commitments Completion of a hydrological study to calculate the instantaneous river flow and stream discharge. In the fall of 2014, a theoretical flow rating curve will be developed based on surveys taken of Char River. In 2015, a field hydrologist will visit Char River and calibrate the curve with actual flow data. In the fall of 2014, a literature review of possible fish species in Char River will be conducted to determine the in-stream minimum flow requirements for environmental protection. Installation of an in-stream staff gauge in the Char River to complete seasonal flow monitoring each year. Limit water withdrawal to 10 % of the instantaneous flow with a 0.5 m in-stream depth minimum to limit impacts to aquatic ecosystems.

Commitments Monitoring of the community’s water use. Annual water quality sampling of Char River and Nipissar Lake prior to pumping. If a longer-term alternative water supply source is required, GN-CGS will ensure that there is a safe and secure long-term water supply that is also protective of the natural environment. We are requesting that a clause be included in the Water Licence Amendment stating that if water withdrawal from Lower Landing Lake becomes a preferred option in the future, that GN-CGS be required to prepare and provide a water balance to the NWB at least 6 months prior to pumping to demonstrate that the proposed pumping rate is acceptable.