On behalf of Patrick Lamare

Slides:



Advertisements
Similar presentations
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Advertisements

VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
WP3 meeting Pylos of 21 Jelle Hogenbirk et al. electronic department The sphere containing multi PMT’s: - HV and discriminator board for each.
By E. Anassontzis, A. Belias, E. Kappos, K. Manolopoulos, P. Rapidis on behalf of the KM3NeT Collaboration.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
Verigy V93000 Service Training
Stefano russo Universita’ di Napoli Federico II & INFN Km3Net meeting Pylos 16–19/4/2007 The NEMO DAQ electronics: Actual characteristics and new features.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
VEOC Vertical Electro – Optical Cable and BEOC Breakout Electro – Optical Cable 1 Development Status F19 F18 F1 F20 S2 S1 B KM3NeT General meeting Jelle.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
Internal Structure of Multi PMT DOM
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Global overview of the Optical Network for KM3Net Phase 1 Sander Mos KM3NeT Collaboration Meeting 30 January 2013 Marseille.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT.
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
The Neutrino Telescope of the KM3NeT Deep-Sea Research Infrastructure Robert Lahmann for the KM3NeT Consortium Erlangen Centre for Astroparticle Physics.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Update on general technology From DOM electronics to KM3NeT subsea infra structure Interaction with other scientific projects Interaction with industries.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
CEA Saclay – Institute of research into the fundamental laws of the Universe PPM DU Pre Production Model Detection Unit Status and plans Th. Stolarczyk.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
DU power Principle diagram OM inventory Conversions VEOC behavior DU to network Pending issues mPMT-Bar.
Multi-PMT DOM P.Kooijman University of Amsterdam-GRAPPA Presentation for SSC.
Pre-Production Models for KM3NeT
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
KM3NeT WP3 meeting Genova Jelle Hogenbirk et al. electronic department 1 of 36 Read-out and transmission technologies for optical modules 
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
White Rabbit and KM3NeT Peter Jansweijer, on behalf of KM3NeT
Status Optical System KM3NeT
Deep-sea neutrino telescopes
DAQ read out system Status Report
Diego Real, IFIC Spain, KM3NeT Electronics Coordinator
Write-up and Definitions for Cost Model
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
Els de Wolf, Nikhef/UvA KM3NeT WP345-meeting 23 February 2009
Els de Wolf 20 February 2012, Catania
Junction Boxes for KM3NeT
ANTARES.
PPM-DOM. SPM DOM LCM SS-part ILxx
Point-to-point connection between each DOM and the shore station
Front-end electronic system for large area photomultipliers readout
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
Nanobeacon: A low cost calibration instrument for KM3NeT
Acoustic Measurements in ANTARES: Status and Aims
Presentation transcript:

On behalf of Patrick Lamare DOM in Antares On behalf of Patrick Lamare WP F-L

PPM-DOM in Antares IL11 motivation ADCP Camera OM hydrophones CT C-Star O2 SV hydrophone LB 14.5m 80m 98m IL11 PPM-DOM OM? Mini-DOM? motivation In situ qualification of the BEOC (storey part of the backbone) Validation of the DAQ system with data rates Validation of clock distribution on Ethernet and time stamping Validation of timing calibration Validation of the optical data transmission with REAM 1st comparison between piezos and hydrophones Coincidences between PMTs Comparison with Antares OMs WP F-L

PPM-DOM = standard KM3NeT DOM Weight 30 kg air Weight -15 kg sea Support Weight 3 kg air Weight 2kg sea WP F-L

DOM mechanical overview http://wiki.km3net.physik.uni-erlangen.de/index.php/OM_Structure Hydrophone Temperature Piezo Nano beacon PMT WP F-L

DOM sensors PMT ETEL Hamamatsu Piezo sensor Hydrophone Compass Nano Beacon WP F-L

DOM electronics Distribution boards to PMTs Central logic board Optical line terminator Acoustic board Nano beacon Alluminium plate (cooling, rf shielding) Power conversion board Folie Thermal conduction Electric isolation Cooling shield Alluminium Upper hemisphere WP F-L

Distribution to / from PMTs Nicknamed; Octopus board Χταπόδια Pulpo Piovra WP F-L

PPM-DOM functions WP F-L

CLB test setup SACLAY test bench Ethernet Switch CLB ML 605 ML 507 GPS LMK 0300 WP F-L

DOM-LCM cable (BEOC) Equipressure cable (PBOF) Hydrophone Penetrator into Optical Module 6 electrical wires (3x UTP) 2 fibres Bendbright Dry mateable connector on to LCM 2 electrical wires (1 UTP) 2 fibres bendbright 1m 0.3m DC/DC Dry mateable connector 2 x UTP Vent / fill for oil Hydrophone Tube knee Seacon Ti connector Bent limit tube for fiber Position ring Silicon Isolation stud Silicon Vin: 400Vdc Vout: 12Vdc Pout: < 18W ƞ: > 90% Titanium house Position ring WP F-L

PPM-DOM Antares Geographics λ1 2 Lasers tunable λ1 MOD + Drivers 1λ CW+1λ AC @1.25Gbps) λ5 LiNbO3 D1 D2 A&D 50/50 A λ4 LiNbO3 λ8 80/20 λ8 λ5 PIN VOA on/off SMA Antares DWDM crate SMA SMA SPM C1 C2 λ4 REAM SMA Junction Box 2xCu DOM λ1 λ1 λ5 APD +? A3 C2 C2 D4 D3 A λ5 λ4 SS-part λ8 λ8 LCM 40 km ILxx Available wavelengths λ4= C33=1550.92 nm λ5= C37=1547.72 nm λ6= C41=1544.53 nm Sea presentation JanWillem Schmelling Existing component Supplement to existing component New component WP F-L Nikhef for KM3NeT: PPM DOM in Antares, designed by Nikhef Optical team. v4

Independent from Antares DAQ, use of evaluation boards On shore DAQ Independent from Antares DAQ, use of evaluation boards

Shore components WP F-L

Integration in LCM 2 ARS_MB not present (The 3rd one could be removed) LCM crate storey 1 2 ARS_MB not present (The 3rd one could be removed) Acoustics boards not present Compass MB Converter board ARS MB CAMETH DAQ board CAMPOW Clock board Free slot 4 Optics LPB side Connectors side Free slot 3 Install optical components Install a new converter board (380V/5V) Control the VOA with DAC on the Compass board (used to set the OM HV) May be optical components splitted in 2 slots WP F-L

Planning mile stones Planning driven by optical part All optical part available beginning of April Electronic boards available in March PMTs and bases available from end of February DOM ready Mid May 2012 WP F-L

Status Project going on smoothly Optics defined and mainly ordered Optics on critical path Detailed integration study in LCM will start KM3NeT project with high priority WP F-L