ICEPP, University of Tokyo

Slides:



Advertisements
Similar presentations
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
Advertisements

SUMS Storage Requirement 250 TB fixed disk cache 130 TB annual increment for permanently on- line data 100 TB work area (not controlled by SUMS) 2 PB near-line.
Computing Resources Joachim Wagner Overview CNGL Cluster MT Group Cluster School Cluster Desktop PCs.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
Bernd Panzer-Steindel, CERN/IT 2 * 50 Itanium Server (dual 1.3/1.5 GHz Itanium2, 2 GB mem) High Througput Prototype (openlab + LCG prototype) (specific.
HEPiX 21/05/2014 Olof Bärring, Marco Guerri – CERN IT
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
1 A Basic R&D for an Analysis Framework Distributed on Wide Area Network Hiroshi Sakamoto International Center for Elementary Particle Physics (ICEPP),
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Computer Co-ordinators Day – Sydney Region ASI Solutions T4L Offerings.
UTA Site Report Jae Yu UTA Site Report 4 th DOSAR Workshop Iowa State University Apr. 5 – 6, 2007 Jae Yu Univ. of Texas, Arlington.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
Winnie Lacesso Bristol Storage June DPM LCG Storage lcgse01 = DPM built in 2005 by Yves Coppens & Pete Gronbech SuperMicro X5DPAGG (Streamline.
Business Intelligence Appliance Powerful pay as you grow BI solutions with Engineered Systems.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Garrison Vaughan, Kyle Nester, Anthony Taliercio.
TRIUMF Site Report for HEPiX/HEPNT, Vancouver, Oct20-24/2003 – Corrie Kost TRIUMF SITE REPORT Corrie Kost Head Scientific Computing.
March 2003 CERN 1 EDG and AliEn in Prague Dagmar Adamova INP Rez near Prague.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.
HPCVL High Performance Computing Virtual Laboratory Founded 1998 as a joint HPC lab between –Carleton U. (Comp. Sci.) –Queen’s U. (Engineering) –U. of.
Tape logging- SAM perspective Doug Benjamin (for the CDF Offline data handling group)
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
INFSO-RI Enabling Grids for E-sciencE Hellas Grid infrastructure update Kostas Koumantaros, Christos Aposkitis EGEE-HellasGrid Coordination.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
S.Jarp CERN openlab CERN openlab Total Cost of Ownership 11 November 2003 Sverre Jarp.
Tier1 Andrew Sansum GRIDPP 10 June GRIDPP10 June 2004Tier1A2 Production Service for HEP (PPARC) GRIDPP ( ). –“ GridPP will enable testing.
The DCS lab. Computer infrastructure Peter Chochula.
News from Alberto et al. Fibers document separated from the rest of the computing resources
Buying a Computer By Robert Iacono Student ID:
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
Materials for Report about Computing Jiří Chudoba x.y.2006 Institute of Physics, Prague.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
Tested, seen, heard… Andrei Maslennikov Rome, April 2006.
Status of Tokyo LCG tier-2 center for atlas / H. Sakamoto / ISGC07 Status of Tokyo LCG Tier 2 Center for ATLAS Hiroshi Sakamoto International Center for.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Computer Performance. Hard Drive - HDD Stores your files, programs, and information. If it gets full, you can’t save any more. Measured in bytes (KB,
RTTC rack status Apr. 14 th 2005 Loïc Brarda, CERN.
AMS02 Software and Hardware Evaluation A.Eline. Outline  AMS SOC  AMS POC  AMS Gateway Computer  AMS Servers  AMS ProductionNodes  AMS Backup Solution.
HP Proliant Server  Intel Xeon E3-1220v3 (3.1GHz / 4-core / 8MB / 80W).  HP 4GB Dual Rank x8 PC E (DDR3-1600) Unbuffered Memory Kit.  HP Ethernet.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
13 January 2004GDB Geneva, Milos Lokajicek Institute of Physics AS CR, Prague LCG regional centre in Prague
SBS Alert Web Console Senior Design 3 – February 28, 2005 Debra Sweet Barrett.
Call now on: Fax your order on: Mail on: Retail Price List 23 June 2016 Call now on: Fax your order on: Mail on:
KOLKATA Grid Kolkata Tier-2 Status and Plan Site Name :- IN-DAE-VECC-02 Gocdb Name:- IN-DAE-VECC-02 VO :- ALICE City:- KOLKATA Country :-
GRID OPERATIONS IN ROMANIA
The Beijing Tier 2: status and plans
Server pschiu.
Napatech Acceleration Platform
Lenovo Thinkservers and
40% More Performance per Server 40% Lower HW costs and maintenance
Products' warranty is the warranty given by the manufacturer
LCG Deployment in Japan
Vanderbilt Tier 2 Project
Southwest Tier 2 Center Status Report
ALICE T2 / FAIR Scope of the Meeting:
5th DOSAR Workshop Louisiana Tech University Sept. 27 – 28, 2007
Computing Board Report CHIPP Plenary Meeting
Retail Price List 04 September 2017 ThinkServers TS150
Christof Hanke, HEPIX Spring Meeting 2008, CERN
Power couple. Dell EMC servers powered by Intel® Xeon® processors and running Windows Server* 2016, ready to securely handle dynamic business workloads.
Retail Price List 06 August 2018 ThinkServers TS150
Lenovo Thinksystem and
The 100 TB Sorting Competition - A Quick Review
Retail File September 2019 LENOVO ThinkSystem ST50 Server
Presentation transcript:

ICEPP, University of Tokyo MoU signing Expected in April Human resource Very limited, but some improvement in 2006 Hardware resource Preparation is going on

Human resource Present In 2006 ~3.5FTE One senior engineer from Sohmu corp. (2 days/week now) In 2006 One engineer position open. 2~3 research associate/PD for operation Operators from companies (2~3FTE?)

Hardware in 2006 HP blade servers Disk Servers Network Xeon 2.8GHz: 2CPU/node 1GB memory SCSI 36GBx2, Total ~100 nodes ~200kSI2k Disk Servers 16x250GB SATA HDD 2 FibreChannel I/F ~40TB for LCG Network 1Gbps in campus 10Gbps from Tokyo to CERN

HP Blade Servers Disk Servers

Hardware in 2007 Budget approved 3 year rental contract Jan. 2007~ Dec. 2009 Tendering process started. Delivery expected in January 2007

New computer room ready (300m2)