Hiroaki Umezawa CTO Tokyo Denkai Co., Ltd.

Slides:



Advertisements
Similar presentations
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Solapur Textile Cluster Solapur, Maharashtra State.
Advertisements

Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Measurement of the thermal conductivity of sapphire fibers
Retirement Planning Lecture notes and retire.m. Long Range Investment Problem " Investing $250 per month " 360 months " Average annual return = 10%
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Jagadhri Brass and Aluminum Industries Cluster Jagadhri, Haryana State.
SERVICE CENTER FACILITIES.
Savings and Investment Unit Project Student Name.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
RRR and thickness measurements of Cu plating
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
1 Changes Brought by Implementing Regulations on Purchase / Sales of Cereals and Paddy Rice.
WP5 City of Rijeka Pilot progress. City of Rijeka Pilot implementation: main task carried out - Defined pilot area - Defined locations for installation.
Big Walnut Local School District Monthly Financial Summary May 2015.
High pure Niobium Industrialisation, Alternative Production Ways, and Strategic Cooperation.
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
TED/LIS LCWS 13 November 12 th Coupler fabrication C.Lievin, S.Sierra.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
2012 REVIEW & 2013 PREVIEW PRESENTATION 2012 REVIEW & 2013 PREVIEW PRESENTATION TO CEUTA HEALTHCARE PHARMACY TEAM January 2013 Prepared by Martin Stimson.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
What is the Business Energy Efficiency Programme?
Senior Year To DO List.
TIN HANH PLASTIC BAG PRODUCTION EXPORT – PACKING CO., LTD.
(4 areas/website front)
Power coupler at DESY & for XFEL
Vertical Electropolishing at Marui & KEK
FCC R&D WP5 Cavity Fabrication Status May 2017 M
Activities of Cavity Fabrication Facility at KEK
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Silicon Epitaxial Wafer for Discrete
European-XFEL summary: Cavities/Modules performance
Material for Large Scale Cavity Production
Effort Torwards Improving Large Scale Production for SC Cavities
Cost reduction activities in cavity fabrication at MHI
Procurement of Nb3Sn strand for coils assembled at CERN
Status of the PANDA Solenoid Magnet Production in BINP
TTC WG-2 focusing on Nb Material - Properties and Specifications -
HIE-LINAC status report
دانشگاه شهیدرجایی تهران
STAR TOF MRPC Mass Production & Q.C. (USTC)
Status of CEPC SC RF Study
تعهدات مشتری در کنوانسیون بیع بین المللی
Development of Large Grain Cavities at DESY
EMPLOYER TESTING On-Going Employees (one who has been with the employer for at least one standard measurement period) STANDARD MEASUREMENT PERIOD 3 – 12.
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Informal document GRPE-78-23
Status of the PANDA Solenoid Magnet Production in BINP
Coronado Elementary School Project Status
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Overall time schedule of SRF activities
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
CNRS contribution to ESS – 01/02/17
Informal document GRPE-79-20
WP 1 Management and Coordination
Informal document GRPE Rev.1
Comments on Document WT-02-02
Presentation transcript:

Hiroaki Umezawa CTO Tokyo Denkai Co., Ltd. 07 November, 2012 Production status of high-purity Nb sheets for European XFEL and FRIB projects - Based on current production of Nb sheets for European XFEL and FRIB projects Hiroaki Umezawa CTO Tokyo Denkai Co., Ltd.

Agenda High-purity Nb sheet production for European XFEL project High-purity Nb sheet production for FRIB project

High-purity Nb sheet production for European XFEL project High-purity Nb sheet production for FRIB project

Nb for Euro XFEL Project Tokyo Denkai tendered an offer for 5,886 high-purity Nb sheets of 265 mm x 265 mm x 2.8 mm. This quantity is as 50% of half cell material of SC cavity of the European XFEL project . We won the bid and our offer was completely accepted.

Shipping schedule We received the official order on January 7, 2011.

Shipping schedule We received the additional order on October 3, 2011. 7

Production rate Average production speed: 4,000sheets/year

Investment for new equipments To reduce Nb sheet production time, we installed two new types of machines. Automatic Buffing (polishing) Machine For final sheets For thick sheets Automatic Etching Machine

Automatic buffing machine (ABM)

Automatic Etching Machine (AEM)

High-purity Nb sheet production for European XFEL project High-purity Nb sheet production for FRIB project

Difference between Nb sheet for XFEL and FRIB RRR Euro-XFEL: RRR>300 FRIB: RRR>250 Sheet size Euro-XFEL: 2.8 mm x 265 mm x 265 mm, 1.7kg FRIB: Eight different sheet size

Difference between Nb sheet for XFEL and FRIB 2.8x265x265mm 1.7kg 1.3GHz 2x520x520mm 4.7kg 3x450x560mm 6.5kg 1.25x400x400mm 1.7kg 3x330x330mm 2.8kg 3x620x620mm 9.9kg 4x600x600mm 12.4kg 3x520x520mm 7.0kg 4x500x500mm 8.6kg

Automatic Etching Machine 2 Maximum sheet size: 900 mm x 1,700 mm

Summary Production of 5,886 Nb sheets (10tons) for the E-XFEL project was achieved last week. Delivery time was earlier than the scheduled time. Average production rate was approximately 4,000 sheets/year. Delivery of additional 1,484 Nb sheets (2.5 tons) is scheduled for Feb and June 2013. This 7,370 sheets production boost our confidence in the mass production of high-purity Nb sheets.

Summary Difficulty in production of Nb sheets for the FRIB project was the required sheet size. Etching of big sheets exposed workers to danger. Installation of a new etching machine for big sheets solved the problem. The new machine is operating well, freeing workers from dangerous tasks. The first delivery to FRIB was achieved last month.

Thank you for your attention.