Orientation to Quality Assurance

Slides:



Advertisements
Similar presentations
2012 New Project Directors’ Orientation
Advertisements

Radiopharmaceutical Production
EPA Requirements for Quality Management Plans And Quality Assurance Project Plans Ray Terhune, QAS.
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
Overview of the Board’s Quality Management Plan. Topics in this Session  Quality System Overview  Overview of the contents of the Board’s Quality Management.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP The Uniform Federal Policy for Implementing Environmental Quality Systems (UFP-QS) Emile I. Boulos.
REDUCING BURDEN WHILE INCREASING QUALITY AT A GOVERNMENT AGENCY David A. Marker (Westat), Mary K. Dingwall (Westat), and Marla D. Smith (U.S. EPA) Presented.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
Module 6A QAPP for In House and Offsite Testing. Chris Foley Compliance Program Manager Module 6A – QAPP for In House and Offsite Testing 2.
Quality Assurance for Tribal FIFRA Enforcement Grants David R. Taylor EPA Region 9 Quality Assurance Office.
1 MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455) HAZARD ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEM Munira Mohamed Nazari School.
QA/QC FOR ENVIRONMENTAL MEASUREMENT Unit 4: Module 13, Lecture 3.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Preparing Quality Assurance Project Plans
R8 QA Training Annual QAPP Review Sept 20121R8 QA Training - QAPP Annual Reviews.
Trini Torres-Carrion. AGENDA Overview of ED 524B Resources Q&A.
QA/QC FOR ENVIRONMENTAL MEASUREMENT
1 Standard Operating Procedures Their Development and Use with Quality Assurance Project Plans.
Content Mastery Center- Opening the Doors of Success
CUI Statistical: Collaborative Efforts of Federal Statistical Agencies Eve Powell-Griner National Center for Health Statistics.
Understanding and Implementing SWAMP Comparability: Quality Assurance SWAMP Quality Assurance Help Desk Quality Assurance Research.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
NCHPS Fall Meeting CFR Part 37 Update. Reference: IMPLEMENTATION GUIDANCE FOR 10 CFR PART 37 PHYSICAL PROTECTION OF BYPRODUCT MATERIAL CATEGORY.
Software Inspections. Defect Removal Efficiency The number of defects found prior to releasing a product divided by The number of defects found prior.
1 Dec. 8, 1997 LEADS Quality Assurance Summary Robert Brewer (512) Monitoring Operations Division Network QA Manager.
Introduction to EPA Quality System Requirements
Region 8 Core QA Training START 9/19/12 R8 Core QA Training Program
Melinda Ronca-Battista, ITEP, TAMS Center Tribal Air Monitoring and QA Requirements for NAAQS- Comparable Data.
Quality Assurance Plan (QAP) Department for Environmental Protection Environmental & Public Protection Cabinet To Protect and Enhance Kentucky’s Environment.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Quality Requirements for Extramural Agreements: U.S. EPA Region 5 Perspectives Kevin Bolger Amberina Khan Office of the Regional Administrator U.S. EPA.
QUALITY MANAGEMENT PLAN OVERVIEW. Course Goals At the conclusion of this training, you will be able to: –Explain the basic considerations for Quality.
Automated Statement of Accounts Project and Operational Guideline March 2011.
EPA Region  What are QAPPs?  Why are Quality Assurance Project Plans needed?  When are they needed?  How are they done?  Then…what do you do.
USEPA REGION 4 Quality Management Plan ( For training purposes only)
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
Education Performance Measures Session. Session Overview Combination of presentation and interactive components Time at the end of the session for Q&A.
Overview of EPA Quality System Requirements. Course Goals At the completion of this course, you will: Understand EPA's quality system requirements Understand.
Quality Management Plans (QMPs) and Quality Assurance Project Plans (QAPPs) Danny France and Greg Noah EPA Region 4, SESD December 6, 2006.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Preparing and Submitting PS&E Packages What does ODOT need? Local Agency Project Delivery Conference May 2 & 3, 2006.
-WHAT IS A PROJECT ASSESSMENT & EVALUATION PLAN? -WHY ARE WE ASKING GRANTEES TO ASSESS, EVALUATE, & REPORT PERFORMANCE & WHAT ARE THE BENEFITS? - HOW DO.
FMCSA BASIC TITLE VI PROGRAM TRAINING December 2015 Lester G. Finkle FMCSA National Title VI Program Manager 11/13/20151.
Contract Compliance Training
World Health Organization
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
Overview of Quality Assurance
Water Quality Monitoring -Quality Assurance/Quality Control-
Beverley Alberola, CIP Associate Director, Research Protections
Anna Preston Vance, HA of Paris
Flooding Walkdown Guidance
Iowa 21st CCLC Local Evaluation Form Training for Local Evaluators
Contract Compliance Training
Maintaining quality data throughout the life of a project
EPA Region 10 Alternate Test Procedures and Method Update Rule
Residential Placement Application 2011
Project Development Quality Program QA/QC – What does ODOT need?
Chemical Purchasing.
Informed Consent (SBER)
BCSD Federal Time -accounting Guidelines & procedures
BCSD Federal Time -accounting Guidelines & procedures
Radiation Safety Information Management System (RASIMS)
Software Reviews.
System Safety Regulation
New Special Education Teacher Webinar Series
Technology Maintenance
Equipment Maintenance Office Supplies Replenishment
Equipment Maintenance Office Supplies Replenishment
Presentation transcript:

Orientation to Quality Assurance A brief overview

Quality Assurance Team Region 7 Quality Assurance Team Diane Harris, RQAM 913-551-7258 Bob Nichols 913-551-7966 Leslye Werner 913-551-7858

Presentation Goals Review EPA QA Requirements Define Environmental Data Answer the question: What is a QAPP? Identify resources available for assistance

Agency Requirements ANSI/ASQ E4 – 2004 EPA Order 5360.1 A2 American National Standard Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs Basis for EPA Quality System EPA Order 5360.1 A2 EPA Requirements Documents CFR References Contractors Grantees

When does QA Apply? “…all environmental programs performed by EPA or directly for EPA through EPA-funded extramural agreements shall be supported by individual quality systems…” EPA Order 5360.1 A2 Which means for P2 projects….

When does QA Apply? Any environmental data generation or use performed by or for EPA (i.e., paid for by EPA funds) requires an approved QA Project Plan prior to the start of the environmental data generation or use.

What is Environmental Data? EPA’s Official Definition: “Any measurements or information that describe environmental processes, location, or conditions; ecological or health effects and consequences; or the performance of environmental technology”

What is Environmental Data? For EPA, this includes environmental data: Collected directly from measurements Produced from models Compiled from other sources Databases Literature Direct measurements: water samples, soil samples, GPS data Produced from models: IUBEK model for Pb; From other sources: this is where the “use” of environmental data comes in; can be from other governmental and non-governmental organizations, agencies, businesses, etc.

What is the benefit of QA? Get the right environmental data for the project Want to avoid too much/too little data Provides for a way to evaluate data to make sure it meets project needs Allows for a graded approach Quality should be based on Nature of the decision Intended use of the data Saves resources Always cheaper to do things right the first time!

Quality Assurance Project Plan Purpose: Document type and quality of data for environmental decisions Responsibility: Written by the Project Manager. Reviewed and confirmed by the Project Manager, appropriate managers with the assistance and approval of the QA Manager Guidance: EPA QA/G-5 Requirements: EPA QA/R-5

Quality Assurance Project Plan Project Management Measurement/Data Acquisition Assessment/Oversight Data Validation and Usability

A. Project Management of QAPP Title and Approval Sheet Table of Contents Distribution List Project/Task Organization Problem Definition/Background Project/Task Description Quality Objectives and Criteria for Measurement Data Special Training Requirements/Certification Documentation and Records

B. Measurement/Data Acquisition Sampling Process Design (Experimental Design) Sampling Methods Requirements Sample Handling and Custody Requirements Analytical Methods Requirements Quality Control Requirements Instrument/Equipment Testing, Inspection, and Maintenance Requirements Instrument Calibration and Frequency Inspection/Acceptance Requirements for Supplies and Consumables Data Acquisition Requirements (Non-direct measures) Data Management

C. Assessment/Oversight Assessments and response actions Reports to management

D. Data Validation and Usability Data review, validation, and verification requirements Validation and verification methods Reconciliation with user requirements

QAPP Format Use references Attach standard forms, checklists, etc. Attach if not readily available Attach standard forms, checklists, etc. Identify any element that is not applicable Modified formats

QAPP Approval For non-state grantees: Submit to project officer to begin process Approvals Project officer Regional QA Manager 20 working days for review/comment Any comments will go through project officer Will be returned for modification if significant issues are found

QAPP Approval For States:: IDNR, KDHE, MDNR, and NDEQ Approved Quality Management Plans Delegates QAPP approval QAPPs follow their QA approval process Does not have to be forwarded to EPA for approval unless project officer requests it Does NOT eliminate the need for a QAPP; it is still required Contact state QA officer for more information

Resources http://www.epa.gov/quality/qa_docs.html Agency’s Quality Staff website R-5 G-5 http://www.epa.gov/region7/index.htm QAPP checklist Volunteer Monitor’s Guide Examples QA Training Contact your project officer and QA Manager

Wrap-Up Remember the graded approach: there is more than one way to get to quality data! Quality data Quality data Quality data