ESA Iris Programme workplan of activities

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Presentation to European UAS Panel 2nd Workshop
1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September , 2011.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Future Communications Infrastructure – An update
PAN European Network Services (PENS)
Agenda Item Rio Conference AGENDA ITEM 5:Legal Aspects â Background: Basic legal elements â Draft Charter on the Rights and Obligations of States.
ESA Iris Programme workplan of activities
ESA Iris Programme: status
The Single European Sky ATM Research (SESAR) initiative
March 8th and 9th 2006 AGCFG / NEXSAT Meetings Toulouse 1 SATCOM FOR ATM ESA Initiative to promote an ATM dedicated Satcom.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Information Management – where next? Ken Reid Head of International Technical Relations EUROCONTROL.
F. Schubert / page 1 Functional Airspace Blocks - Can they inspire the ANS World? Air Transport, Air & Space Law and Regulation International.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
ICT ONERA, Toulouse, France, 6. November 2007 Spectral Efficient COMmunications for future Aeronautical Services Jan Erik Håkegård
SPECTRUM STRATEGY & VISION ICAO ACP WG-F October 2014 Raffi Khatcherian EUROCONTROL DPS/POL Spectrum Management SESAR WP Spectrum Project.
SESAR Single European Sky Air traffic management Research
David Bowen Head of ATM Operations and Systems
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT SWIM-SUIT Public launch Rome 23 April 2007 Morten JENSEN European Commission.
Basic of Project and Project Management Presentation.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Nigel Makins EUROCONTROL
Cooperation and human factor are key for the success of the SES By François Ballestero ETF Political Secretary Public Hearing on SES II EESC, Brussels,
Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
6th Framework Programme Thematic Priority 4 Aeronautics and Space Seminar on the new instruments of FP6 - afternoon session Satellite Communication in.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision SAFETY ASPECTS SAFETY ASPECTS  Juan Vázquez,
PAN European Network Services (PENS)
Bob Jones EGEE Technical Director
Additional aviation spectrum allocation for AM®S
Workshop on preparations for ANConf/12 − ASBU methodology
Céline Pasty London, 14 April 2016
ESA Iris Programme: status
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
Welcome to the SESAR SWIM Master Class 2013
Workshop on preparations for ANConf/12 − ASBU methodology
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
Workshop on preparations for ANConf/12 − ASBU methodology
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
Galileo European Commission The European Satellite Navigation Program
Technical cooperation challenges
OPTIFRAME : Project Overview
Workshop on preparations for ANConf/12 − ASBU methodology
OptiFrame WP1: Project Management
SWIM Common PKI and policies & procedures for establishing a Trust Framework                           Kick-off meeting Patrick MANA Project lead 29 November.
WG-I #16 Meeting SESAR Security Tasks
Future Communications Infrastructure – An update
International Civil Aviation Organization
ESA Single Sign On (SSO) and Federated Identity Management
Werner Mohr, Siemens Networks, Munich, Germany
Drones and Autonomous Systems
The Single European Sky Implementation Programme: SESAME
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
Certification Workshop
IS&T Project Reviews September 9, 2004.
ITS Agenda Item at WRC-15:
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
SPECTRUM STRATEGY & VISION
e-Invoicing – e-Ordering 20/11/2008
P AIRPORT SURFACE DATALINK
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
International Civil Aviation Organization
The ATM Standardisation Coordination Group
Presentation transcript:

ESA Iris Programme workplan of activities franco.ongaro@esa.int nathalie.ricard@esa.int claude.loisy@esa.int

SESAR schedule vs Iris schedule

Objectives of Iris (ARTES 10) Phase 1 Emphasis on: Preparation work to support the preparation of the SESAR Master Plan Initiate development of the communication standard Initiate identification of the satellite system architecture Consider non-technical issues from the start: Business case Service provision and governance model ESA hand-over after development/deployment Validation and qualification with SESAR Support frequencies allocation Phase A activities timing is aligned with SESAR ATM Master Plan release

Communication System Design activity The activity includes: Trade-off of existing and possible new standards Analysis and consolidation of user requirements Communication architecture design (incl. security requirements, handover procedures with terrestrial network) Interfaces with SESAR terrestrial network (incl. interfaces at physical and networking layers) Design of associated hardware and software, development, validation and qualification procedures. Software simulator for validation Preparation of ICAO standardisation and certification activities (Incl. support of ESA-Eurocontrol working group set-up to share information on the future standard with non-European ICAO Members) Preparation of ICAO standard (technical basis and international support)

Analysis and Definition of Satellite System The activity includes: Analysis and consolidation of user requirements, including existing or projected commercial ones, and needs for possible ancillary services All trade-offs on architecture, payload, platform, ground segment, deployment and operations schemes and provision of possible ancillary services Assessment of the business case for the provision of services Analysis of integration into SESAR’s overall infrastructure Transfer of responsibilities between ESA and SESAR Certification issues regarding the operators and operation of the satellite system Definition of the operational responsibilities and liabilities. Prepare all elements to define the satellite service provision

Conclusions ESA mandate: to support the adoption of satellite solutions where justified and for the benefit of the European Union policies; Justified means a solid cost/benefits case, not technology for the sake of technology; Although SESAR is the foundation of the programme, is very clear that we need to act regional but think global: we count on this group, and possibly a dedicated subgroup to help us identify the best new communication standard, open and standardised at European and ICAO; In waiting for the SESAR JU to fully take its system architect role, we are counting on the support of an Expert group including Eurocontrol, ANSP's, EASA and aviation representatives to help us refine our system requirements Our next milestones are the ATM Master Plan and our own Ministerial Conference at end 2008. Meanwhile the Invitation to Tender for the Ph A studies have been issued last week, with KO expected in December.