PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop

Slides:



Advertisements
Similar presentations
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
University of Southern California Enterprise Wide Information Systems Instructor: Richard W. Vawter.
Development plan and quality plan for your Project
Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
Software Configuration Management
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Asher Etkin DOE Accelerator Safety Workshop August , 2009 DRAFT DOE STANDARD APPLICATION OF SAFETY INSTRUMENTED SYSTEMS USED AT DOE NON-REACTOR.
1.  Project: temporary endeavor to achieve some specific objectives in a defined time  Project management ◦ Dynamic process ◦ Controlled and structured.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
Michael deLamare Requirements Management Program Functions R-9.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
Thursday August 20, 2009 John Anderson Page 1 Accelerator Interlock System Issues Flow Down of Requirements from the Safety Order to Engineered Safety.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Project Execution Methodology
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
Methodologies and Algorithms
Managing the Project Lifecycle
Safety Instrumented Systems
Chapter 11: Software Configuration Management
CENF – Personnel Protection System Preliminary Study
Software Configuration Management
CENF – Personnel Protection System Preliminary Study
Software and Systems Integration
Safety in Construction and Upgrade Phases
IEEE Std 1074: Standard for Software Lifecycle
Safety Instrumented Systems
Safety Accountabilities
Software Requirements
Chapter 1 The Systems Development Environment
Engineering Processes
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Chapter 11: Software Configuration Management
Instrument PDR Summary of Objectives
(System Development Life Cycle)
Engineering Processes
TS2 PSS Architecture, Concepts of Operations and Interfaces
12 Safe Maintenance Rules
PSS verification and validation
Safety Analysis and Safety Functions
Safety Readiness Review (SRR) Thomas Hansson, ESH
DOE Review of the LCLS Project October 2006
Introduction to Project Management
System architecture, Def.
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Software Reviews.
{Project Name} Organizational Chart, Roles and Responsibilities
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop

CURRENT STATUS Functional Concept (Conceptual Design) RSD for tender (negotiated procedure) Negotiated procedure to be launched Internal review External review Meetings with companies

PERSONAL SAFETY INTERLOCK Integrated Safety System PLC based Defined safety modes of PSI controlled areas Defined roles and reponsibilities Defined procedure for safe operation IEC 62061, IEC 61511, and IEC 61508.

CONCEPTUAL DESIGN Baseline for negotiations Summary of forseen functions Contains: - Preliminary Hazard Analysis - Definition of basic functions - Definition of safety area modes - Establishment of procedure - Basic description of interfaces - Warnings and visualization - Requirements on data management and reporting

PRELIMINARY HAZARD ANALYSIS Hazard identification Failures definition Causes & Conseq. Controls to be implemented Hazards: - Ionizing radiation - Lasers - High volatge - Gases (flammable, toxic, O2 depleting) - Vacuum

PRELIMINARY HAZRD ANALYSIS Areas affected Doors to be interlocked Controls to be implemented PSI functions

AREA MODES Definition of area modes for experimental halls E2-E6, E1, Plant rooms, and Beam transport Description, requirements, and rules defined Condition for mode transition

PSI PROCEDURE Roles and responsibilities Access Search Release Emergency procedures Maintenance Failures

INTERFACE Monitoring system (ionizing radiation, gases) (one way communication to PSI) Access control system (mutual communication) Fire alarm system (one way communication to PSI) Machine safety system (one way communication to MSS) Control system (one way communication to CS) Laser Safety System

EXAMPLE

REVIEWS OF CONCEPTUAL DESIGN Internal: all relevant team at ELI BL (lasers, experiments, engineering, project management, planning, maintenance) External

TENDER Negotiated procedure Deliverables: - Risk analysis; - Safety requirements documentation (SRS); - Design of the PSI system; - Hardware and Software; - Installation; - Verification, testing and validation - User Documentation (including maintenance plan); - Technical documentation (including documented source code, calculation/verification of SIL); - Documentation of the project management (including Project management plan, verification-validation plan, verification-validation documentation, etc.); - Tools and software for further development and maintenance.

Exact time for completion will be made during the negotiations. TENDER RDS done Notice done and to be sent to the suppliers Questionnaire and topics for negotiations done Entire project will be staged according to the project schedule based on re-scoping! Exact time for completion will be made during the negotiations.

OPTIONS FOR E1 E1 operational safety PSI Administrative Trained personnel Strong safety culture Clear instructions Only for period until PSI will be installed! Pilz PSI based system Design done Basic programming done Only for period until PSI will be installed!

Discussion