F. Bosi INFN-Pisa on behalf of the SuperB SVT Group

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Status Update on Mechanical Prototype in Rome November 6,
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 11 Layer0 - SVT Mechanics F. Bosi – M.Massa INFN-Pisa on behalf of the SuperB SVT.
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
Update on the activities in Milano M. Citterio and N. Neri on behalf of INFN and University of Milan SuperB Meeting: SVT Parallel Session.
G. RizzoSVT Meeting – April, SVT Update SVT bi-weekly Meeting - April, Giuliana Rizzo Universita’ & INFN Pisa Group Organization & WBS.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
F. Bosi -SuperB Collaboration Meeting, QMUL, 13 – 16 September SVT Mechanics F. Bosi INFN-Pisa on behalf of the SuperB SVT Group.
EC: 7 DISK concept Preliminary considerations
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
Straw man layout for ATLAS ID for SLHC
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
SVT – SuperB Workshop – Annecy March 2010
SVT Mechanics & Beam Pipe
Valerio Re INFN Pavia and University of Bergamo
SVT Parallel-SuperB Workshop Perugia, June
SVT subchapters & editors
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
Preliminary thoughts on SVT services
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Layer0 - SVT Mechanics update (MDI meeting)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Local Supports for Inclined Layout: CERN Update
Micro-channel Cooling
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
Preliminary Y-chamber specifications – First draft
SVT Mechanics Baseline SuperB SVT configuration
R. Kersevan, TE-VSC-VSM 30/06/2016
WP9 ITS Mechanics and Cooling
SVT Module design F.Bosi
Integration issues at IHEP
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
The SuperB Silicon Vertex Tracker
SuperB SVT Definition of sensor design and z-side connection scheme
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
WG4 – Progress report R. Santoro and A. Tauro.
Design and fabrication of Endcap prototype sensors (petalet)
Challenges for FCC-ee MDI mechanical design
Integration and IR Hall
SVT detector electronics
SVT- Status Update on R&D activities for TDR
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
IR Beam Transport Status
Presentation transcript:

F. Bosi INFN-Pisa on behalf of the SuperB SVT Group SVT Mechanics F. Bosi INFN-Pisa on behalf of the SuperB SVT Group

Outline Preliminary SVT design on layer 1-5 - Work on the L0 supports Striplets version Work on the L0 supports (MAPS version) Update IR layout for positioning matching card support Conclusion

SVT L1-5 Layout design First Attempt to model L1-L5 SVT modules starting from BaBar design: assumed the same radial position for all layers 2) used same width of BaBar sensors/modules to keep the same transversal r-phi section (# of modules, overlap…….) 3) For L1-L2-L3, modified the length in z direction 5) For L4-5 extended only the barrel part of the module while wedge sensors are kept identical to the BaBar ones ( same sensor dimensions and angle w.r.t. the barrel part).

SVT L1-5 Layout design Previous point 1) and 2) means that for SuperB SVT there is no front view difference from the BaBar SVT layout

SVT L1-5 Layout design L5B L5A Assumed same BaBar module’s radius. (different the length in Z direction) L4B L4A L3 L2 L1

SVT L1-5 Layout design 350 mrad 300 mrad Z direction For full covering angle, sliding the wedge VI sensor parallel to z direction till to cover the 300 mrad line

SVT L1-5 Layout design Layer 4-5 extra length from the I.P. 350 mrad

SVT L1-5 Layout design Sensor VI same dimension in z and r-phi Sensor I-II-III-IV-V: different Z dimension same dimension in r-phi R-phi Sensor VI same dimension in z and r-phi L.Bosisio (trieste Univ.) is working on the design of the sensors and on the optimization of the dimensions

SVT dimensions in Fastsim – N. Neri

L1-L5 barrel modules dimensions table Not big difference between N.Neri SVT module dimension and actual design ! Layer Radius cm Modules quantity Module width (r-phi ) BaBar (cm) Barrel module length - Fastsim N.Neri (cm) Barrel modules length - Bosi new design (preliminary) (cm) 1 0.3 3.3 6 4.13 21.466 21.478 2 4 4.94 25.992 26.278 3 5.9 7.15 38.276 38.57 4a 12 16 5.28 44.57 45.795 4b 12.4 47.942 5a 14 18 61.81 61.304 5b 14.4 63.584

L1-L5 full modules length Module length - Fastsim Neri (barrel + 2 wedges) (cm) modules length - Bosi new design (preliminary (barrel + 2 wedges) All Barrel Modules lehgth without arch shape (cm) Layer 4a 58.164 59.389 77.585 Layer 4b 58.164 61.536 80.172 Layer 5a 75.404 74.898 90.516 Layer 5b 75.404 77.178 93.103 Large difference in length

SVT L1-5 Layout design In this first design there are good news for layer 3-4-5 and some bad news for layer 1-2 ! 1) Strong interpenetration between sensors layer 1 and layer 0 ! 2) Light interpenetration between sensors layer 2 and layer 0 3) No problem for layer 3-4-5 The problem arise from the position of layer 0 that is constrained between the central Be pipe flanges and the 300 mrad acceptance angle. In practice no space available for the necessary clearance between layer0 and layer1 !

Module Striplets All L0 components very close to the flanges beam pipe Complete Modules striplets positioned on the Be beam-pipe and supported by Cold Flange. Cold Flanges Buttons All L0 components very close to the flanges beam pipe Be pipe flanges 13

Problem with layer 1 sensors SVT L1-5 Layout design 300 mrad acceptance angle Layer 0 Problem with layer 1 sensors Central Be pipe flanges

SVT L1-5 Layout design Layer 1 Layer 0 HDI Layer 0 C.F. structure About 20 mm Layer 1 Layer 0 C.F. structure

Central Be pipe flanges SVT L1-5 Layout design Layer 0 HDI Layer 2 Central Be pipe flanges

SVT L1-5 Layout design 300 mrad acceptance angle Layer 2

SVT L1-5 Layout design Layer 2

SVT L1-5 Layout design Layer 3 W shielding No problem for layer 3 300 mrad acceptance angle Layer 3 No problem for layer 3

SVT L1-5 Layout design Layer 1-2-3

SVT L1-5 Layout design Layer 4B

SVT L1-5 Layout design Layer 4 A-B

SVT L1-5 Layout design 300 mrad cone Services space 20 mm Layer 5 A-B

SVT L1-5 Layout design transition card Layer 5 A-B N. 52 radial double board positioned on an half-flange support transition card Layer 5 A-B

SVT L1-5 Layout design transition card Layer 5 A-B 300 mrad cone Services space 20 mm transition card Layer 5 A-B

SVT and Transition Card SVT L1-5 Layout design SVT and Transition Card

General layout Drift chamber Transition card SVT side view

General layout SVT side section

SVT L1-5 Layout design What are the possible solution to eliminate interpenetration problem between layer 0 and layer 1-2 ? 1) modify the HDI/supp. structure and layer 0 geometry HDI and C.F. support structure reduced in dimensions position of HDI nearer of 3-4 mm to the L0 sensor 2) Move the Be pipe flanges forward in z of about 10-12 mm in order to reduce radial L0 HDI position 3) Position at larger radius L1-2 (+ 5-10 mm)

Proposed W shielding layout to meet transition card location Space for clearance from D.C. and SVT cable Space for SVT gimbal ring Space for trans.card 25,0 Proposed W shielding layout to meet transition card location

Radiation Monitor position Possible position for radiation monitor. Not yet defined the position of radiation monitor, its design depends still by definition of many other I.R. components, anyway we will try as soon as possible, to place the overall dimension on the general layout. 31

Work on Module MAPS supports 700 mm Carbon Fiber Pultrusion Peek pipe Dh=300 mm The single base microchannel unit A square CF micro-tube with an internal peek tube 50 mm thick used to avoid moisture on carbon fiber Full micro-channel module The total radiation length (*) of this support is 0.28 %X0 12.8 mm 700 mm Support Cross Section Net micro-channel module Same dimensions of full micro-channel but vacancies of tubes in the structure. The total radiation length (*) is 0.15 %X0 (*): Material of the support structure: ( All C.F. material + peek tube + Water) 32

Further Miniaturization microtube technology Work in progress 550 mm New Carbon Fiber Pultrusion Peek pipe Dh=200 mm Old Carbon Fiber Pultrusion 700 mm Dh=300 mm Further Miniaturization microtube technology Full Module X = 0,28 % X0 Full Module X = 0,22 % X0 Net Module X = 0,11 % X0 Net Module X = 0,15 % X0 Module Microtubes 550 mm th, Full and Net version tested at the TFD lab

Full module H=550mm test results Tests performed on full module sample (length = 120 mm) with water-glycol @ 10 °C as coolant (Dp =2,0 atm). Average module Temperature vs Specific Power Temperature along the module: DT = 7,1 °C at 1.5 W/cm2 and Dp =2.0 atm 34

Net Module H=550mm test results Tests performed on net module sample (length = 120 mm) with water-glycol @ 10 °C as coolant (Dp =3,5 atm). Average module Temperature vs Specific Power Temperature along the module: DT = 7.0 °C at 1.0 W/cm2 Dp =3.5 atm

Microchannel Module Comparison Data Comparison List   % X0 T max °C Specific Power W/cm2 Hydraulic. Diam. mm Flow rate g/min D Temperature °C 1 Microchannel FULL Module support H=700 mm 35.8 2.0 300 244 5.3 2 Microchannel NET Module support H=700 mm 0.15 38.3 1.5 128 6.70.28 3 Microchannel Full Module support H=550 mm 0.22 34.3 200 33* 7.1* 4 Microchannel NET Module support H=550 mm 0.11 34.2 1.0 24 7.0 Tests performed on net module sample (length = 120 mm) with water-glycol @ 10 °C as coolant at Dp =3,5 atm (Dp not valid for value *).

Pixel maps module support Although the results on Net module H550 microchannel support satisfy the thermal spec we had a problem of bad sealing of the liquid coolant in all these prototypes We produced N. 4 Net H550 microchannel support and all the samples presented coolant leakage outside the c.f. channel at low pressure ( 1.0-1.5 atm). We improve the hydraulic interface design in order to perform better sealing from epoxy araldite casting by large space devoted to the sealing and vacuum control but we did not gain in sealing quality. This might be a serious problem for use of this kind of very light supports. Net module H700 ( 0.15% X0 ) is anyway OK !

Pixel maps module support Araldite 2011 sealing Coolant input Probably coolant infiltration through face surfaces Leakage region Coolant input The leakage is probably due to a poor rate of resin respect to the carbon fiber that allow the coolant pass trough the pultrusion at the face region of the microchannel Hydraulic interface new design

Pixel maps module support Possible cure for the H 550 microchannel leakage: Coating of the external microchannel c.f. face Viton sealing on the microchannel face surface New production of H550 microchannel with higher epoxy rate respect c.f. ( about 60 -65%) Solution 1) and 2) will be realized in Pisa . For solution 2) we have already realized a special viton sealing that we can test immediately! Front side Back side I think anyway should be useful to have also a new microtube production with higher resin rate !

Pixel maps module support If H550 micro-tube should be a critical choice, it is possible another solution: -In order to make comparable from the Xo point of view microchannel Net support H700 and H550, is possible to design an H700 module support with less microchannel number ( more empty space between the micro-tube) and to obtain the same X0 value (0,11% X0) . Of course this kind of support will have less cooling performance but should be devoted to serve evenctually the pixel hybrid sensor ! We will test also this solution!

Pixel maps module support In this hypotesis of new support design with less number of H700 microtube, should be important to improve the efficiency of thermal exchange. At this purpose another design implementation is the following: This implementation can improve of about 20% the thermal exchange surface between support and sensors and partially compensate the decreased number of microtube in the new H700 microchannel support

Conclusion SVT Engineering situation 1) QM Engineers started to work on the items they agree to cover (space/frame and support cone) 2) N.1 Young engineer will begin ( October 1st) his work in Pisa (planned to work on the jig and features design for SVT Modules prototype production) 3) N.1 Engineer at 50% will be operative beginning of next year at INFN Milan to work on trans. Card support and cooling A significant acceleration in the engineering design is expected in the next months due to the larger number of engineers involved. *Priority on the baseline design ( strplets+L1-5 ) andto eliminate the conflict with layer 1-2 * Works on pixel prototype modules has lower priority until TDR is ready * Quick demounting procedure and IR layout , are still strongly depending on beam pipe dimension definition , W shielding dimension, criostat and QD0 design, etc. but anyway one engineering proposal has to be presented to the Tech. Board as soon as possible * Work on TDR mechanical chapter has started

BACKUP

Module Striplets Sensor position Fixing buttons R-fi fanout HDI Fixing buttons Front-end chips Final solution –HDI in axial direction inclinated at 300 mrad, with front-end chips 30° oriented 44

Module Striplets Some modification about the previous HDI dimensions ; to facilitate the cold flange design, bottons are positioned forward and in asymmetric position . Widht of HDI: important to limitate material in the 300 mrad envelope Buttons positioned asymmetric and moved in forward direction 45

Module Striplets Asymmetric pot for buttons glueing Button-hole for screws and final glueing to the buttons Low mass ribs for active region CFRP structure , glued on the fanout-sensor and HDI buttons, freezes the exact positions of HDI and sensors . 46