ENVIRONMENTAL, SAFETY, & HEALTH (ESH)

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

Risk Management Introduction Risk Management Fundamentals
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Criticality Analysis Slide 1 Criticality – Mil-Std-1629 Approach n CRITICALITY is a measure of the frequency of occurrence of.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Contractor Management and ISO 14001:2004
Unit 6 – Risk Management and safety management system
Chapter 7 Control and AIS Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 7-1.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Operational Risk Management for Airport Emergency Planning
ENVIRONMENTAL MANAGEMENT SYSTEMS MARINE OPERATIONS CENTER – PACIFIC INTRODUCTION TO OUR SYSTEM JIM SCHELL, ENVIRONMENTAL COMPLIANCE OFFICER.
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
FDA Recalls Risk Communication Advisory Committee David K. Elder Director, Office of Enforcement.
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
LSST Camera Performance and Safety Assurance Plan and Safety Overview Joe Kenny Camera Safety Manager LSST Safety Council Review 18 August 2015.
As of: 07 Apr 051 Using MIL-STD-882D: Approach for Identification and Elimination of Environmental Hazards or Reduction of Risks Associated with Environmental.
© 2001 by Carnegie Mellon University PSM-1 OCTAVE SM : Senior Management Briefing Software Engineering Institute Carnegie Mellon University Pittsburgh,
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Product Safety Consulting, Inc.© Failure Mode and Effects Analysis - FMEA.
DEPARTMENT OF THE NAVY THE NAVY ASN(RD&A) Acquisition and Business Management Recycled Paper SECTION 3.3 Acquisition Strategy Becomes more definitive as.
Safety Risk Assessment/ Acceptance Air Force Materiel Command Chuck Dorney, P.E., C.S.P. Chief, HQ AFMC/SES DSN I n t e g r i t y - S e r v i.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Risk Benefit Risk Management SSG MACK.
OPERATIONAL RISK MANAGEMENT
The Audit as a Management Tool Vermont State Auditor’s Office – April 2009.
DEPARTMENT OF THE NAVY THE NAVY ASN(RD&A) Acquisition and Business Management ORM Recycled Paper OFFICE OF THE ASSISTANT SECRETARY OF THE NAVY (RESEARCH,
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Rules for Supporting Part 803 and Part 806 Decision Making Page 1 Establishing Rules for: Medical Device Reports (803) & Correction and Removal Reports.
How to Supervise Evaluate
Executive Safety Board Safety Managers Brief 24 Feb 2011 Michael James Environmental and Explosives Safety Team, PM Ammo Marine Corps Systems Command TACTICAL.
Presented to Managers. INTERNAL CONTROLS are the integration of the activities, plans, attitudes, policies and efforts of the people of an organization.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of: 02 Mar 051 Partnering with Industry on System Safety & MIL-STD-882D.
CATASTROPHIC (I) Loss of ability to accomplish the mission or mission failure. Death or permanent total disability (accident risk). Loss of major or mission-critical.
Project Management Career Development Program (PMCDP) development-program Linda Ott.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Fermilab Environmental Management System (EMS) Senior Management Training Module FN000378/CR/01.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XIV)
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Framework Programme : 7th Research Framework Programme : Some aspects.
ATEC Safety Verification Process
People and Culture Office Safety, Health and Wellbeing
Ranjan kumar Assistant Manager CCL,Ranchi
ESSA Grading Criteria Can the finding lead to a mishap?* No
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
ENVIRONMENTAL SAFETY & HEALTH DEPARTMENT OF THE NAVY RESPONSIBILITIES
Project Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
RISK ASSESSMENT TOOL PREVIEW
Disaster Site Worker Safety
Presented By: Daniel J. Brown, CQA
Risk Assessment Matrix
Risk Benefit Risk Management. Risk Benefit Risk Management.
Speaking risk with our project managers
People and Culture Office Safety, Health and Wellbeing
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Criticality – Mil-Std-1629 Approach
Unit I Module 3 - RCM Terminology and Concepts
Independent Expert Program Review (IEPR)
Introduction to Risk Management.
Project Risk Management
Disaster Site Worker Safety
RISK MANAGEMENT Overview
EXPLOSIVES SAFETY SELF ASSESSMENT (ESSA) UNIT NAME
EXPLOSIVES SAFETY SELF ASSESSMENT (Division)
SELDOM (D) Remotely possible; could occur at some time
Presentation transcript:

ENVIRONMENTAL, SAFETY, & HEALTH (ESH) RISK MANAGEMENT IERARCHY PM TIPS FOR RISK ANAGEMENT DEPARTMENT OF THE NAVY v 2 Understand your responsibilities Overall management of ESH risks Obtain acceptance for high & serious ESH risks Invite Fleet’s reps to participate in ESH issues ORM 2 PROGRAMMATIC 2 v TECHNICAL Leverage ESH risk management techniques Assign an ESH Manager - (your technical lead) Establish an ESHWG - (your “ESH experts”) Integrate ESH into overall risk management Include ESH risk management in your contract Use “standard” concepts (see inner panels) -ESH Hazards Definitions & Categories -ESH Hazards Acceptance Matrix Integrate key ESH topics into your ESH Risk Management efforts: -NEPA -Environmental Compliance -System Safety & Health -Hazardous Materials -Pollution Prevention 2 2 ENVIRONMENTAL, SAFETY, & HEALTH (ESH) 2 2 2 ENVIRONMENTAL v Operational Risk Management (ORM) OPNAVINST 3500.39 MCO 3500.27 Risk of completing an operational mission Includes availability of resources (e.g., system), etc. 2 2 2 SAFETY & 2 v Programmatic Risk Management DOD Regulation 5000.2R, Section 3.3.3 Risks associated with the system/program Includes Cost, Schedule, & Performance 2 2 HEALTH 2 v v Technical Risk Management NAVSO P-3686 Risks associated with system’s technical issues Drives all programmatic risks Influence your PESHE based on ESH Risks Describe your strategy to reduce ESH risks Address ESH Risk Management responsibilities Describe how you will track ESH risks 2 2 2 RISK MANAGEMENT 2 2 2 v ESH Risk Management DOD Regulation 5000.2R, Sections 3.3.7 & 4.3.7 Risks include all E, S & H hazards of the system Drives technical as well as programmatic risks References: 2 DOD 5000.2-R SECNAVINST 5000.2B OPNAVINST 3500.39 MCO 3500.27 NAVSO P-3686 2 2 ESH RISK MANAGEMENT “Players” OFFICE OF THE ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT AND ACQUISITION)ABM 2211 South Clark Place, Room 578 Arlington, VA 22202-3738 PM -Overall responsibility for managing ESH risks PM’s ESH Manager -Technical lead for managing ESH risks ESHWG -Assigns ESH hazard levels & tracks residual ESH hazards IPTs -Integrates ESH risk issues into systems engineering process Contractor -Includes ESH risk issues into overall technical risk PEO -Accepts “Serious” ESH Hazards (see inside panels) ASN(RDA) -Accepts “High” ESH Hazards (see inside panels) Fleet Reps -Ultimate “recipient” of ESH hazards & their impacts http://www.abm.rda.hq.navy.mil/aep.html 00GP 00GP Recycled Paper ASN(RD&A) Acquisition and Business Management PPP, Inc. 9/99

NAVSO P-3686 “Top Eleven Ways to Manage Technical Risk” HAZARDS DEFINITIONS & CATEGORIES Environmental Hazards Definition: Hazards in terms of damage to the environment and violation of law. I Catastrophic Irreversible environmental damage in violation of law. II Critical Reversible environmental damage in violation of law. III Marginal Reversible environmental damage with no violation of law. IV Negligible Insignificant environmental damage. Definition: The probability of environmental impacts over the life of the system. A Likely Fleet of systems Continuously, P>1 Individual system Frequently, 1>P>10-1 B Probable Fleet of systems Continuously, 1>P>10-1 Individual system Several times, 10-1>P>10-3 C Occasional Fleet of systems Several times,10-1>P>10-3 Individual system At some time, 10-3>P>10-6 D Remote Fleet of systems At some time, 10-3>P>10-6 Individual system Unlikely, 10-6>P Probability of Occurrence (P) Severity Health Hazards Definition: Hazards in terms of dosage of a substance, or induced loads*. Substance dosage or induced loads leading to death Dosage or loads leading to permanent or disabling injury/illness Dosage or loads leading to temporary or non-disabling injury/illness Dosage or loads with minimal or insignificant threat to personnel Definition: The probability of health impacts over the life of the system. Safety Hazards Definition: Hazards in terms of system damage/loss or personnel injury/death. Loss of system Death Major system damage Permanent or disabling injury/illness Minor system damage Temporary or non-disabling injury/illness Minimal or insignificant system damage Minimal or insignificant threat to personnel Definition: The probability of safety impacts over the life of the system. *Dosage (i.e., concentrations vs. times) & induced loads (e.g., temperature, physical, electrical) RESPONSIBILITIES (From SECNAVINST 5000.2B) HOW ESH RISK MANAGEMENT APPLIES TO EACH 1. Choose an Approach -Use the severity versus probability approach 2. Assign Accountability -PM should assign ESH Manager as POC 3. Put Risk Management in the Contract -Include ESH Risk Management in contracts 4. Mandate Training -Check with ASN(RDA), SYSCOMs, & CNO N45 for availability of ESH training. 5. Practice Engineering Fundamentals -Integrate ESH hazards definitions & categories 6. Understand COTS/NDI Applications -Determine ESH hazards for COTS/NDI products 7. Establish Key Software Measures -Include Software Safety in ESH Risk Management 8. Assess, Mitigate, Report -Assess using ESH Hazards Definitions & Categories -Mitigate highest hazards first -Report residual high & serious ESH hazards -Obtain approval using Hazards Acceptance Matrix 9. Use Independent Assessors -Weapon System Explosive Safety Review Board -ASN(RDA) ABM -CNO N45 10. Stay Current on Risk Management Initiatives -ESH Risk Management Initiatives will be posted on: http://www.abm.rda.hq.navy.mil/aep.html 11. Evaluate New Acquisition Policies -ESH Policies will be posted on the site listed in #10 ASN(RD&A) Accept high risk hazards. PEOs/DRPMs/COMSYSCOMs Accept serious risk hazards. Program Managers Integrate ESH risk management into the technical risk management process. Ensure trade studies include ESH risk management considerations. Include ESH risk management in the contract requirements. Ensure ESH hazards are accepted at the correct approval authority level. Severity Probability of Occurrence * High hazards must be accepted by ASN(RDA) **Serious hazards must be accepted at the PEO level. HAZARDS ACCEPTANCE MATRIX