Outcome of BI.DIS Fast Interlocks Peer Review

Slides:



Advertisements
Similar presentations
A Sensor Fault Diagnosis Scheme for a DC/DC Converter used in Hybrid Electric Vehicles Hiba Al-SHEIKH Ghaleb HOBLOS Nazih MOUBAYED.
Advertisements

Drives & Control June 2003 A. Jansen 1 Brushless DC Motor Control with C868 and CAPCOM6.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Injection Test Meeting Tuesday 26th August Controls Issues/Results Injection Kickers Etienne CARLIER AB/BT.
Chapter 9 Practical Application Issues of Power Semiconductor Devices
PXI-Kicker Generator Control Jan Schipper TE-ABT-EC.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
LSST Workshop Bremerton, WA August, LSST Workshop Bremerton, WA August, 2015 Camera Protection System Martin Nordby Chief Mechanical Engineer LSST.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Believe it or.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
CCNA 2 Week 9 Router Troubleshooting. Copyright © 2005 University of Bolton Topics Routing Table Overview Network Testing Troubleshooting Router Issues.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Automatic accident avoiding system PROJECT MEMBERS MUTHUKUMAR.K (05ME33) SAKTHIDHASAN.S (05ME39) SAKTHIVEL.N (05ME40) VINOTH.S (05ME56) PROJECT GUIDE:
Lecture 25: Implementation Complicating factors Control design without a model Implementation of control algorithms ME 431, Lecture 25.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
DEEJAM : Defeating Energy-Efficient Jamming in IEEE based Wireless Networks Paper Authors: Anthony D. Wood John A. Stankovic Gang Zhou Presented.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
STO/GM December 2011 ABB STOTZ-KONTAKT GmbH ABB i-bus® KNX DGN/S DALI Gateway for emergency lighting © STO/G - Slide 1.
Methodologies and Algorithms
New active filter for COSY dipole power converter
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
Data providers Volume & Type of Analysis Kickers
LBDS TSU & AS-I failure report (Sept. 2016)
Software Specification and Configuration Management
EI205 Lecture 8 Dianguang Ma Fall 2008.
OVERVIEW Impact of Modelling and simulation in Mechatronics system
Dr.K.Venkata Subba Reddy Professor-CSE Department
Alternative FEE electronics for FIT.
EC Activities Status for LIU September 2017
Injectors BLM system: PS Ring installation at EYETS
LHC Beam Dumping System Reliability Run Summary
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Graph Coverage for Specifications CS 4501 / 6501 Software Testing
prepared by R.A.Barlow 30/056/2016
1v0.
BCTW calibration status and future
TCM PS – SPS Thyratron Power Trigger Consolidation
Special Magnets Controls
Outline Introduction Switchgear Modeling in IEC 61850
Lesson 9: Digital Input-Output Signal Interfacing
Combiner functionalities
ASPECT ORIENTATED PROGRAMMING RESEARCH
ASPECT ORIENTATED PROGRAMMING RESEARCH
Backend System Requirements
Control System Summary of Changes Since PDR
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
1v1.
RF Local Protection System
BCM-BIS Interface Szandra Kövecses
TS2 PSS Architecture, Concepts of Operations and Interfaces
Update on Multi Vendor Interop Project.
3 GHz and 30 GHz Conditioning Programs
Chapter 13: I/O Systems.
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Chapter 13: I/O Systems “The two main jobs of a computer are I/O and [CPU] processing. In many cases, the main job is I/O, and the [CPU] processing is.
Presentation transcript:

Outcome of BI.DIS Fast Interlocks Peer Review Etienne Carlier TCM 29-11-2016

Review Objectives Validation of required functionalities Performance evaluation of the solution under test in 867 Decision on the strategy for final deployment https://indico.cern.ch/event/580138/

Two separate trigger signals Avoid overshoot on IGBT during switching Control unbalanced signal on IGBT during switching Improve energy recovery mechanism  Fine synchronization (ON & OFF) between triggers required

Fast Interlocking Functionalities Detection Internal failures in the pulse generator Internal failures in the triggering chain Protection (failures dependent) Re-triggering Triggers Inhibition Interlocking Slow (State) Fast (BIS + DCPS) Monitoring PM analysis Statistics

Parameters to be analysed and cross-checked Trig1 Trig2

Detection Short-circuit between IGBTs and Magnet (I2, I3) No current in Magnet (I3, due to missing shot, PFN not charged…) Pulse length not correct (I2, I3) Voltage balance on each switch (V1, V2, V3) No output current from assembly (I2) Faulty shot: missing or erratic shot (I2, I3) Freewheel diode: No current (Ishunt) Recovery diode: No current (I1) PFN voltage not in range before pulsing Triggering chain supervision: Faulty switch ON / Faulty switch OFF IGBT driver status

Protection Re-trigger in case of Inhibition in case of Missing trigger (according to trigger sequence) Erratic trigger Incorrect voltage balancing between IGBT during turn-on or turn-off Inhibition in case of Missing trigger (according to trigger sequence) Turn-off trigger before zero crossing Substraction |Vce1-Vce2| should be close to zero during switching. Some admissible unbalancing (Normal, Admissible, Warning, Fault).

Typical state machine for surveillance of 1 parameter

Configurability Different set of settings Different type of settings For each PFN (PFN lengths) For each switch (IGBT pairing) For interlock thresholds (PPM operation) Different type of settings Operational / Configuration Dynamic / Static Hardware dependent / independent IGBT cassette change Not 1 to 1 compatible Set of settings to be adapted in FIS (…and in KiTS)

Functional Requirements Functional specification available for BI.DIS fast interlocking logic https://edms.cern.ch/document/1537992/0.3 Engineering specification in preparation Configuration strategy to be clarified... Some programmable thresholds inside the system to be dynamically managed Necessity to detect faulty reverse current in diode to be further investigated.  Failure of the freewheel diode detected by the interlock checking the presence of current in the magnet Correlation between signals, interlocks, failure modes and actions to be clarified. A summary table has to be produced for a clear overview of the system.

Implementation for 867 test bench Configuration settings to be defined and categorised. Configuration of variable interlock thresholds for PPM operation to be reassessed. Interlocking vs. surveillance functionalities to be clearly differenced. To be added in summary table. Voltage balancing interlock seems to be the more complex and critical part of the system. Complexity of actual implementation to be reviewed Sensors range to be individually adjusted through attenuators. Strategy for long term management of attenuator to be defined. Homogenisation at sensor level seems not possible. To be summarised in an adequate document (sensors, ratio, attenuation). Required reaction time for each interlock up to BIS to be estimated and included in summary table. 

Outcome of ongoing test in 867 Each interlock individually tested. No major problem encountered w.r.t. requirements. Required functionalities well defined. Test protocol to be provided for validation of each interlocking functionalities System boot-strapping and revalidation after TS and LS. Can it be automated? Protocol shall not rely on internal modification of embedded software. Can-it be done through modification of some thresholds? Strategy to re-set operational thresholds afterwards to be defined. Implementation of PFN voltage surveillance (measured vs. demanded) under progress (new requirements). Is-it the right place to do it or can-it be done by an external BETS?

Status FASEC option for BI.DIS No missing functionalities identified in the FIDS w.r.t. requirements and current FIS implementation. Interface for DCPS HV inhibition needs clarification (signal type, levels...) Control of IGBT turn OFF in the FIDS. Only possible at zero crossing. Is-this possible for test in 867 available. Test of both systems (FIS & FIDS)  in // in 867 seems feasible. Test of FIDS on 865 BI.DIS test bench to be added in the project planning. 865 BI.DIS FIS test bench to be extended for use and validation of FIDS. Missing functionalities to be identified and added….

Control Integration Cross-communication strategy for availability of all information at low-level to be addressed Avoid to rely on FESA for operation of a system with interlocking functionalities. Settings / thresholds management strategy to be clarified. Interlocking logic should not be PPM dependant… Software layers homogenisation up to hardware abstraction layer. Try to reduce software development effort at the upper layers.

Summary Working prototype under test and successfully validated in 867 BI.DIS test stand Functional requirements captured and well documented More complex than anticipated Gain of snubber circuit not obvious at the interlock (and triggerings) level Dynamic configuration of the interlocking logic to be carefully analysed Full RAMS analysis to be performed??? Protection vs. complexity Deployment in FIDS to be validated Enhance 865 test bench as required Uniform approach for Fast Interlocking System