Plans for the next DAQ release

Slides:



Advertisements
Similar presentations
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Advertisements

Memory Management 2010.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
End HomeWelcome! The Software Development Process.
Shelter Cluster Vanuatu Meeting 16 July 2015 PWD Offices, Port-Vila.
Service Management for CERN Change Management Acceptance Meeting Geneva, Jochen Beuttel.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
CERN European Organization for Nuclear Research M. Nonis – ACCU Meeting – 3/12/2008 HOSTEL BOOKING SOFTWARE.
Memory Management Operating Systems CS550. Memory Manager Memory manager - manages allocation and de-allocation of main memory Plays significant impact.
1 Moving Linux in CMS Vincenzo. 2 Generic Certification backward compatibility SLC4 is binary backward compatible: –Binaries built on SLC3 are usable.
Parent Night 2015 Presented by Mrs. Eck. Welcome to Mrs. Eck’s fifth grade classroom! Teacher : Mrs. Donna Eck Graduated from Fort Hays State University.
ICAO PKD Implementation Financing Requirements May 18, 2004.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
Program Development Cycle
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
Capgemini India. 2 Project Execution Process  Onsite team will gather the requirements from client and put them in Business Requirements specification.
L1Calo L1 Coordination Meeting March 24th, 2015 Rainer Stamen.
What Causes Software Vulnerabilities? _____________________ ___________ ____________ _______________   flaws in developers own code   flaws resulting.
GCC Conversion Status Alan M Jonckheere. 12/4/2002A.M.Jonckheere2 Introduction KAI is no longer supported by their new owner, INTEL. Reconstituted C++
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
DBM DAQ Status Ales IBL DAQ Workshop Held previous week and first part of this week
Indian Health Service Contract Support Costs Update 1.
ITIL: Service Transition
Applications Area News
NEAS Workforce Management Contact Centre Flexible Options
Parent Night 2017 Presented by Mrs. Eck.
Requirements Engineering Lecture 4
Software Verification and Validation
Alberto Valero 17 de Diciembre de 2007
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Testing Process Roman Yagodka ISS Test Leader.
When you got up this morning, I observed you,
Operating systems and Internet Infrastructure services
Run Control (and Other) Work
ICAO PKD Implementation
ICAO PKD Implementation
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
CS 5150 Software Engineering
Update on HW commissioning
Smart Testing and Recycling Testing
Branching Strategy.
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
Systems Analysis and Design
Extreme Programming.
Mrs. Erickson’s 2nd Grade Memos Special Notes SPECIALS Upcoming Events
5v5 Basketball League Captain’s Meeting
Hotmail Customer Help Hotmail customer care number Any case of Hotmail issue our team always ready for your help. We have a help support team with.
6 /30 Meeting and Deliverables
PRI Registrar Quarterly Auditor Training
Budget identifier - ENABLING INTEGRATION OF aid data with COUNTRY budgets IATI Members’ Assembly, June 2016.
ICS 143 Principles of Operating Systems
COP 4600 Operating Systems Spring 2011
When you got up this morning, I observed you, and I hoped you would talk to me, No matter if they were only few words, asking my opinion or just giving.
Accounting, Controlling, Treasury
Lesson 1 Understanding Software Quality Assurance
EECS150 Fall 2007 – Lab Lecture #4 Shah Bawany
Mrs. Chesshire Mrs. Rhodes
Mrs. Chesshire Mrs. Rhodes
Computer Applications I
Systems Update
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Geant4 Documentation Geant4 Workshop 4 October 2002 Dennis Wright
Tenses of Verbs Grade
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Trillo Apparel Company Revised Delivery Plan
Time Management: A Key to Online Success! WHERE DO I START?
Presentation transcript:

Plans for the next DAQ release P. Morettini Plans for the next DAQ release Paolo Morettini - Pix DAQ release 27/5/2010

New DAQ release (PixelDAQ-1-5-T4) The problems observed during data taking in the past weeks implied some delay in the release of 1-5-T4, which was, in principle, almost ready after the SR1 validation. The DSP group has defined a strategy to attack and solve the problems related to DSP monitoring. This strategy is divided in 5 steps, and at the end it should give us a stable monitoring tool. But it’s important to notice that the last steps are supposed to be based on the last DSP release, hence on PixelDAQ-1-5-x. Given the fact that PixelDAQ-1-5-x still need validation at the PIT, it looks to me that we should do our best to have this release ready by Tue June 1st morning, in order to have a chance to qualify it during the technical stop. Paolo Morettini - Pix DAQ release 27/5/2010

Things to be included Mandatory items (to be tested during the stop) New DSP release, with fixes for phase 3/4. Code already validated in SR1 + modifications done at the PIT in the past few weeks. Small updates to CalibrationConsole/CalibrationAnalysis Infrastructure for stopless recovery (dummy implementation) Data-taking at 80/160 (something may need modifications…) Optional items (may come after technical stop) Compilation with gcc34 under SLC5 First test of module stopless recovery Action de-allocation in case of ROD removal Compilation under SLC5/gcc43 Paolo Morettini - Pix DAQ release 27/5/2010

Validation In theory it would be necessary to have a full validation of PixelDAQ-1-5-T4 at the pit (but 1-5-T3 + fixes was validated in SR1). But it’s not obvious that we will manage to do this during the incoming technical stop. So I think we should give priority to data taking validation, and do only a minimal scan validation. In case of troubles with calibration we can always step back to 1-4-2. Code should be ready (tags sent to me) by Mon, May 31st 8 PM. Compilation will be done during the night, and the test could start on Tuesday morning. Paolo Morettini - Pix DAQ release 27/5/2010