CONTRACTING FOR LOCAL MAINTENANCE

Slides:



Advertisements
Similar presentations
FACILITIES & EQUIPMENT
Advertisements

Output & Performance based Road Contracts (OPRC)
TRAFFIC MANAGEMENT Tender and Construction Phase
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Computer Security: Principles and Practice
Transport Forum 2005 by Cesar Queiroz, Lead Highway Engineer, ECSIE Washington, DC, March 7-11, 2005 Options for Implementing Performance-based Contracts.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Functional (Performance-based) Maintenance Contracting in Denmark By Susanne Baltzer Danish Road Directorate Denmark.
Contractor Issues North TX Spring Thaw February 2009.
Risk Assessment – An Essential Standard
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
1 Maintenance Contracts for Rural Roads International Road Federation (IRF) German Agency for Technical Cooperation (GTZ) ) Economic Commission for Latin.
Module 7: Construction Phase
G17: Recordkeeping for Business Activities Carried out by Contractors Patrick Power, Manager Government Recordkeeping Programme Archives New Zealand.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
Leadership The Most Essential Element Of Combat Power Is Competent And Confident Leadership. Leadership Provides Purpose, Direction, And Motivation In.
Labour based engineering standards - Lengthman maintenance in South Africa D Jones Transportek, CSIR South Africa.
CONTRACTING WITH LOCAL CONSTRUCTION FIRMS Afternoon, Monday 22 November.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Safe Working Procedure – Personal Protective Equipment Learning Objectives: By the end of this program participants will be able to demonstrate their understanding.
Chapter 13 Estimates for Remodeling Work
OHS Legislative Responsibilities Delivered to: MNL Winter
Road Maintenance in Estonia
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
Legal Rights and Responsibilities of Employers, Supervisors and Employees Lesson 2.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Maintenance.
Types of Contracts and Guidelines for their choice
Starter Activity What kind of tasks or situations is an employer legally required to perform a risk assessment for? Use of any work equipment. Management.
Roles and responsibilities PM
Toolbox Intent – Presentation leaders’ notes
Pothole Patching Alternatives
Focus on What's Important
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
CONTRACTING USING LOCAL CONSTRUCTION FIRMS
Profession Practices (ECIV-5105)
Pre-Job Briefings Continuing Education First Quarter 2017 Part 1
Health and Safety is Important
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Administration of a FIDIC Contract - Financial Management
HOW BEST CAN WE MANAGE MEDICAL EQUIPMENT By Khalif D.Mohamud BMET-GCRH
SUE «Tochikobloikhakashi»
Engineering Services Engineering services covers:
A Manager’s Responsibilities
Particular Conditions of Contract & Appendix to Tender
Temporary Works Co-ordination
SAFE WORK INSTRUCTIONS
LECTURE 5.
4.5 Checking and Corrective Action Monitoring and Measurement
Works and Services Supervisor
BAB 4 KOS KEMALANGAN.
161 Senior Cadet Development Weekend
Lesson 2 Legal Rights and Responsibilities
Always use the correct tools for the job
Emulsion Task Force Meeting
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Dennis Li - HKCIC Lecturer
Handout 9: Organisational policies and procedures
EXPERIENCES FROM LONG-TERM
Effective communication prevents incidents
Chapter 11 Project Control.
Effective Construction Safety Management
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
Machine Shop safety.
Fiber Reinforced Polymer Systems
Presentation transcript:

CONTRACTING FOR LOCAL MAINTENANCE

Maintenance Maintenance is mainly restoring the surface layer and repairing drainage to ensure that water is carried away from the surface Preventive maintenance requires continuous inspection and repair of faults (repair and clean drains, fill potholes): it requires a permanent « lengthman » around every 2km Periodic maintenance involves partial regravelling of the surface and drain rebuilding, usually after the rainy season Emergency repairs (mudslides, massive erosion) can require heavy equipment and aid) A low-volume road is unlikely to last longer than 8 years, without maintenance perhaps 2 rainy seasons Expect to pay about 400-600+ USD per km.year (more if graders used) (better than 5000+ USD to rebuild if you do not)

Maintenance management A contract will be issued for a length of road to a small formal or informal firm or an association The contractor will engage, equip and supervise lengthmen using mobile supervisors Close supervision will be needed to make sure that he is doing his job A local user group will provide quality control A bigger formal sector contractor may be necessary with light equipment for periodic maintenance over a part of the network

Performance-based management Contractor not paid based on quantity of work done at unit prices as laid out in building contract He is provided with the task of maintaining road assets according to minimum service levels specified in the contract How he does it is up to him More risk for him on a bad year but he has incentives to innovate to reduce costs Management must be sure to get the service standards right and know what it should cost to detect bidding collusion

Contracting safeguards Competent contractors are rare and training is necessary not only in doing the job but in bidding procedures and management generally Contract documents must be simple otherwise bids are incoherent Contractors are sometimes dishonest and controls are necessary: Quality of work and respect of schedule Make sure workers are paid and equipped with the right tools Make sure clauses about gender are respected Contractors are also vulnerable and regular and rapid payment is esential Performance-based contracting is more effective if supervision is effective and honest

References Perfomance based maintenance management http://www.ruralroads.org/en/funds.shtml Road mainteance