Planning Electrical Circuits

Slides:



Advertisements
Similar presentations
Architectural Drawing
Advertisements

Architecture CAD living sleeping service SPACE PLANNING
UNIT 31 HOME ELECTRICAL SYSTEM
Electrical Plans.
28 Residential Electrical Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the characteristics.
DAY12 UNIT 15: DRYER OUTLETS AND LIGHTING CIRCUITS FOR THE LAUNDRY, POWDER ROOM, REAR ENTRY HALL AND ATTIC.
Chapter 19 Electrical Plans.
Chapter 19 Electrical Plans.
Competency: Draw Electrical Plans
ACT-ADDII-1: Students will prepare electrical plans a) Understand general codes related to electrical plans.
1 October 21, 2014 The Safe Use of Taps. 2 October 21, 2014 What are RPTs?  A Re-locatable Power Tap (RTP) or power strip, is used to provide multiple.
EET Survey of Electronics
BRANCH CIRCUITS zBranch Circuit-separate electrical [path independent of other circuits sized by the overcurrent protection device. zElectrical load- amount.
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING PROGRAM STUDI KEAHLIAN (SKILL DEPARTEMEN PROGRAME) : TEKNIK BANGUNAN (BUILDING TECHNOLOGY) KOMPETENSI.
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Chapter 17 Electrical Plans.
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Two Minute Drill Number 23- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill Number 22- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
Light Fixtures Ceiling/Wall fixtures –surface –recessed Fan (exhaust) Junction box Fluorescent fixtures.
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
 Function- used for preparing meals, storage, eating and working  Location- needs to be near service entrance, utility room, dining room and social.
Electrical Plans.
Objective 7.06 INTERPRET simple drawings. Draw the symbols onto graph paper. Cut out each symbol and glue onto a notecard.
Space Planning Objective Grouping by FUNCTION 0 When designing the layout of a house, rooms with similar functions are usually grouped together.
 Function:  How a space will be used.  Dictates the selection and arrangement of furniture.  How can you combine functions with furniture arrangement?
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
By: Mr. Brock.  Electricity- Source of energy that can be easily converted into light, heat or power  Ampere (Amp)- Unit of measure of the rate of flow.
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
House Project.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Planning Electrical Circuits Original by Ryan Talton Modified by Georgia Agriculture Education Curriculum Office –June 2004.
Drawing to Scale Tab 3 Notes Introduction to Floor Plans & Blueprints Every home is built from a unique set of plans, traditionally called blueprints.
Service Area Planning. Standard ACT-ADDI-1 Students will identify components related to the design process.
Planning The Electrical System
Electrical Diagrams.
Water Efficient Plumbing Fixtures Required: Kitchen Remodel Tip Sheet
Chapter 12 Branch Circuits and Feeders. Chapter 12 Branch Circuits and Feeders.
Competency: Draw Floor Plans
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
Sleeping Area and Bath Facilities
Common Regulations for Circuits
Planning The Electrical System
Planning Electrical Circuits
2014 NEC – Code Changes Pertaining to Wiring Devices
Outlet Branch Circuit Arc Fault Circuit Interrupter (OBC AFCI)
Chapter 19 Electrical Plans.
Developing a Design Plan
Architectural Drawing
Competency: Draw Floor Plans
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
EET 323 – Electrical System Design Lecture 1: Introduction to Electrical System Design Radian Belu, PhD.
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
Objectives Learn about Electricity Pricing Electric systems.
Objectives Review conductor and conduit selection
Building standards Mr. Da Silva.
Objectives Finish with Practice circuits problems for
EET 323 – Electrical System Design Lecture 3: Load Characteristics
Competency: Draw Floor Plans
Load Calculation Speed Drill
Two Minute Drill – Residential 3
Cooking , Electric Dryer and Appliance Calculations 3
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

Planning Electrical Circuits Written by: Ryan Talton

Planning for the SEP and/or Sub panel SEP should always be located near the service entrance Might want to place the SEP close to large appliances and equipment that will require most electricity Should be accessible at all times Try to anticipate future needs when finding site Never have SEP in clothes closet or bathroom Box Should be installed 40-48 inches above floor level Can be installed flush or surface mount.

Outlet Spacing Overhead Lighting Wall Outlets (Receptacles) May be placed in discretion of owner In single overhead light should be in center of room Wall Outlets (Receptacles) No point on a unbroken wall measures greater than 6 feet This includes wall space of 2 feet or more in width Unbroken by doorways, fireplace, etc. Most receptacles should be 12 and 16 inches above floor level

Kitchen Countertop Outlets (Receptacles) Should always be installed at each counterpace no wider than 12 inches Should be installed within 24 inches of each other on countertops No more than 18 inches above countertops All kitchen Receptacles should be GFCI protected We will learn more about this later

Closet and Storage lighting Outlets Surface mounted incandescent fixtures should be located 12 inches between fixtures and storage area Surface mounted fluorescent- may be mounted within 6 inches of storage area If recessed- both can be 6 inches from storage area.

Planning Small Appliance Branch Circuits Determine the number of circuits necessary to meet wiring plan requirements Larger homes may call for more circuits

What is a Small Appliance Branch Circuit Generally supply power to kitchen counter top surfaces and dining room areas where small appliances are commonly used Coffee makers, fry pans, blenders, toaster ovens, waffle irons

Planning General Purpose Branch Circuits Make up the largest portion of the home wiring system Include all ceiling and wall mounted lighting outlets and most receptacles Not ones for a specific purpose All circuits originate in SEP

How do I Calculate the Required Number of General Purpose Circuits General Rule: One General Purpose Circuit for every 500 square feet 2500 sq ft house= 5 gpc What about a house that is 2240 sq ft 2240/500=4.48 This equals 4.48 gpc Always go to the next highest number when figuring the number of circuits So: 2240/500=5 gpc Only figure the amount of heated space Not garage or porch space

Balancing a Load Why is it important to balance a load? General rules are: 10 outlets per 15 amp circuit General Purpose 13 outlets per 20 amp circuit General Purpose If the above 10 or 13, add another circuit

Example Problem 40’ 50’ Determine the number of general purpose circuits. (1 circuit for every 500’)

Answer to Example 1 40’x50’=2000 sq ft. 2000/500=4 GPC

Example 2 45’ 65’ 20 amp GPC 75 outlets

Answer to example 2 45’ x 65’=2925sq ft 2925/500=5.85 Need 6 circuits 75 outlets / 6 circuits= 12.5 Do we need to add another circuit?

Example 3 35’ Two story house 15 amp GP 55’ 96 outlets

answer 35’ x 55’=1925 sq ft 1925 x 2=3850 sq ft for both floors 3850 / 500= 7.7 Need 8 circuits 96 outlets / 8 = 12 outlets per circuit Do we need another circuit Add 2 circuits Need 10 general purpose circuits which would make it 9.6 outlets per circuit