Process Management and Control and Physical Inventory SAP Implementation
The Production Process
Introduction to SAP R/3.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
University of Southern California Enterprise Wide Information Systems Customer Order Management (Continued) Instructor: Richard W. Vawter.
SAP Purchasing Prepared by Lavanya.M. Purchasing The R/3 System consists of a number of components that are completely integrated with one another. This.
Financial Accounting (FI)
Production Planning Processes Theories & Concepts
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Sales and Distribution (SD)
Project System Module (PS)
Phase II: Procurement SAP University Alliances Version 2.2
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution (cont.) Instructor: Richard W. Vawter.
Sales and Distribution (SD)
Enterprise Asset Management (EAM)
Customer Service (CS) SAP University Alliances Authors Tim Böttcher
Materials Management (MM)
Financial Accounting (FI)
PROJECT COSTING ZETA ERP. FLOW PANEL.
Financial Accounting (FI)
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Controlling (CO) SAP University Alliances Authors Bret Wagner
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Fall, 2015.
© SAP AG Production Planning and Execution (PP) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Controlling (CO) SAP University Alliances Version 2.1
© SAP AG Financial Accounting (FI) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global Bike Inc. Level.
© SAP AG Materials Management (MM) SAP University Alliances Version 2.1 Authors Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP4 Global Bike Inc. Level.
Controlling (CO) SAP University Alliances Version 2.1
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Controlling (CO) SAP University Alliances Version 1.0
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Click here to download this powerpoint template : Green Floral Free Powerpoint TemplateGreen Floral Free Powerpoint Template For more : Powerpoint Template.
Materials Management (MM) Organizational Structure EGS 5620 Enterprise Systems Configuration Spring, 2016.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
 TATA CONSULTANCY SERVICES MATERIALS MANAGEMENT.
MATERIALS MANAGEMEN T. Contact Us : Online | classroom| Corporate Training |
 TATA CONSULTANCY SERVICES MM - Inventory management.
Chapter 1 Overview of the FI Module
Service Contract with Periodic Billing
Information Systems By Kundang K Juman, Ir. MMSI
Chapter 22 Procurement Cycle and Documents
SAP Overview.
SAP PS ONLINE TRAINING  Online | classroom| Corporate
Controlling (CO) SAP University Alliances Authors Bret Wagner
Financial Accounting (FI)
Enterprise Asset Management (EAM)
Chapter 18 Automatic Account Assignment
Controlling (CO) SAP University Alliances Authors Hans-Jürgen Scheruhn
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
Procure to Pay Process This unit focuses on the procure to pay process. The first part describes the organizational levels and master data which support.
ERP Systems Lecture # 7.
Financial Accounting (FI)
Welcome to Project System(PS) Overview
Financial Accounting (FI)
Asset Acquisition through Direct Capitalization
Order-to-Cash (Project-Based Services) Scenario Overview
Information Systems within the Organization
BASIC SETTINGS CONTENTS OF THE COURSE: Definition of Company
Financial Accounting (FI)
Production Planning Processes SAP Implementation EGN Enterprise Systems Configuration
Information Systems within the Organization
SAP University Alliances
Presentation transcript:

Project Management (PS) SAP University Alliances Authors Martin Wassmann Bret Wagner Stefan Weidner Product SAP ERP 6.0 EhP8 Global Bike Level Beginner Focus Process Integration Project Management Version 3.0 Last Update July 2016

PS Organizational Structure PS Master Data PS Processes Chapter Overview PS Organizational Structure PS Master Data PS Processes Project Planning Project Execution Project Closure

PS Organizational Structure (Project Management) Organizational structure needs to be defined in the beginning to define execution of project Project system itself does not own its own organizational structure Embedded via assignment into organizational units in the enterprise structure The PS module is assigned to the modules Finance and Logistics The productivity of this module mainly is created through the integration of other SAP modules Sales order execution in Project Management Sales and Distribution (SD) - Organizational Structure needs to be defined beforehand to define the execution of the project The project system itself does not own an organizational structure but is embedded via assignment into organizational units in the enterprise structure The Module PM enables the user to manage projects in business using integrative modules like FI. Controlling (CO) Finance (FI) Materials Management (MM) Business Requirements in Project Management

PS Master Data Projects WBS-Elements (Project Structure Plan Elements) Sequences Milestones Work Data

Characteristics of projects: Complex Unique High risk Goal oriented Limited in time, costly, high capacities needed Stretegical meaning High quality standards Project types: Customer projects Overhead cost projects Investment projects Project = Task

Sales and Distribution Controlling Finance Materials Management Display Projects Projects are complex tasks that can be found in several components in the SAP system: Sales and Distribution Controlling Finance Materials Management

All data prepared using one transaction User-specific work Project Builder All data prepared using one transaction User-specific work Often used projects can be discarded in work inventory Scheduling of projects based on networks Using the Project Builder, all Data of a Project can be prepared in one transaction.

Possible Status for WBS Elements The WBS-Element either describes a concrete tasks or subtask that is subdivided further  Work package Possible Status for WBS Elements Released Entry of effective costs possible Unlocked Technically complete for networks, processes, process elements Closed processes in Logistics and Finance Deletion flag Fully invoiced further invoices can be inhibited Further statuses exist for WBS elements that are not recalled here: The status for standard WBS is valid for all WBS elements In addition to the given system status, user statuses can be defined

Hierarchy Graphic (PSP) The Hierarchy Graphic forms the base for planning: Costs Revenues Payments Budgets Schedules Can be structured in phases, functions and objects Project phases are, for instance: Conceptual design Overall planning Permission, etc.

Hierarchy Graphic Functions: In the Hierarchy,WBS elements are subordinated: - When structuring objects, objects with same features can be displayed using a seperate hierarchical structure: project summarization - Planning is done using processes that are assigned to WBS elements Functions: Scheduling, Cost Determination, Classification in Entities

Project Structure in SAP ERP Project + PSP Elements

Access sequences are sequence elements Temporally Defined beginning/end Executed without interruption Need of resources Generate costs Differentiation between two kinds of access sequences and cost sequences into internal and external processing Preparation is done in the schedule or in graphical design.

Hierarchy Graphic Example Hierarchy Graphic Consists of access sequences and relationships Possibility to create access sequences in external processing Change of internal processed access sequences to external processed ones Hierarchy Graphic defined in Customizing Head: Data is saved and taken over to the complete schedule, e.g.: System status Calculation data e.g.: Consists of normal series Depending on status, elements are depicted differently

Relationships Relationships describe the chronological sequence in a network plan oder standard network. There can be dependencies of technical or contential character. Normal series Start series End series Bounding series Normal Series: From the end of one series to the beginning of another one. Start Series: From the Beginning of one Series to the beginning of another one. End Series: Starting at the end of one series going to the end of another series. Bounding Series: From the beginning of one series to the end of another series.

In project system, they can be used for additional tasks and functions Milestones Milestones are constructed to mark crossovers between different phases or departments In project system, they can be used for additional tasks and functions Milestones are created in the Project Builder for Single Elements Milestone trend analysis: For appointment control Determine earned value Appointment connected in invoice processing

For preparation of business actions Functions: Milestones For preparation of business actions Functions: Release of access sequences Include standard schedule Create hierarchy Include parts of hierarchy Start workflow tasks etc.

Work Data Activity type Work Number Percent Calculation key

Services Planned Non-Planned Related to achievements that are collected in a service master Non-Planned Related to achievements that cannot be specified because it is not known, which individual specifications they comprise. For preparation of external processed series, the corresponding key must be entered.

PS Processes Project Planning Project Execution

Project Planning – Project Planning Board Graphical surface for creation and preparation of projects Function: Termination (of resources) Coordinate work Check capacities Calculate costs Work and Workplace have to be deposited for planning capacities.

Project Execution Project execution comprises several steps (e.g. purchase process) When goods receipt of services is executed, achievements are recorded Sales orders are generated automatically using the hierarchy Execution services: Obligo and costs for positions that were planned using Easy Cost Planning, are entered

Project Execution: Easy Cost Planning Easy Cost Planning enables cost planning based on amounts and characteristics. It is executed on the level of project structures. Main advantages of these is a fast, easy and clearly arranged data acquisition. Possible entries with Easy Cost Planning: Internal accounting for services Direct process accounting Reservations Goods issue Purchase requisition Sales order

In general, one time per periode executed in background Periode Closing In general, one time per periode executed in background To execute billing, rules are necessary Costs are given by customer bills and supplier bills etc.; are given to FI and other modules Direct settlement Each object is settled directly to the external cost object (examples: cost center, profitability segment) Multi-level settlement You settle individual objects in the project to the higher-level WBS element first. This then settles the costs collected to the external receiver.

Provides the user with available reports and graphs Information system The information system is used to evaluate key performance indicators within a project. Provides the user with available reports and graphs Overview over performance, schedule and costs Report types: Structure-based Cost-orinented Item reports Summorized reports