Capstone Project MIDAS PROJECT

Slides:



Advertisements
Similar presentations
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
Advertisements

Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
Functional Testing Test cases derived from requirements specification document – Black box testing – Independent testers – Test both valid and invalid.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến
OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG GIANG TÔ CÔNG THANH.
99ATS Turbocharge your Hiring Process !!. ON TARGET Solution offered by 99ATS Overview Introduction Gaps in Recruitment Process Screenshot overview of.
LOGO Penny Auction Website Capstone Project Bid It Team Supervisor Huỳnh Anh Dũng Nguyễn Thị Hòa Nguyễn Duy Khánh Huỳnh Hiếu Nghĩa
TEAM Basic TotalElectrostatic ManagementAwareness&
GoodsWayGoodsWay Capstone Project Team information Goodsway.
LOGO PowerPoint Template Add your company slogan Toll Fee Management Supervisor : Nguyễn Văn Sang Group : Unstoppable.
Topic Cafeteria Management System
SUPERVISORS : Mr. Huynh Anh Dung Mr. Nguyen Tat Trung STUDENTS: Nguyen Thanh Long Nguyen Ky Thanh Duong Quynh Hoang Thi Minh Sau.
3TC Company e-Restaurant Project management plan lick to add Title 2 Contents Introduction add Title 1 Requirement Specifications 3 Design Description.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
OTEPAD SDS PRESENTATION
CAPSTONE PROJECT OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến.
LOGO Toll Fee Management Supervisor : Nguyễn Văn Sang.
07/21/97 MOSS Project Introduction and Definition -Senior Project-
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
LOGO Penny Auction Website Capstone Project Bid It Team Supervisor Huỳnh Anh Dũng Nguyễn Thị Hòa Nguyễn Duy Khánh Huỳnh Hiếu Nghĩa
LOGO Penny Auction Website Capstone Project Bid It Team Supervisor Huỳnh Anh Dũng Nguyễn Thị Hòa Nguyễn Duy Khánh Huỳnh Hiếu Nghĩa
Online Newspaper CMS 1 Date: 27/12/2012. Contents Introduction Project Management Requirement Specifications Design Description Test Documentation Summary.
Capstone Project FPT University VIETNAM TRAVEL SHARING NETWORK Supervisor: Mr. Nguyen Van Hien Team member: Dao Dang Dan Tran Van Su Nguyen Van Nam Nguyen.
Introduction Software Project Management Plan Software Requirements Specifications Software Design Description Software Test Result.
Capstone Project Time and Attendance System. Project Code: FUTAS Project Supervisor: Phạm Thanh Tùng Team Members: TTạ Minh Việt NNguyễn Quang Huy.
Programming Contest Management System Supervisor : Lecturer Phan Tr ư ờng Lâm Students : Hoàng Quang Mạnh Trần Đình Tuấn Nguyễn Thành Trung Phạm Thị Hồng.
LOGO Song Identification System Team members: Nguyen Ngoc Tan Ho Vinh Thinh Nguyen Huu Duy Nguyen Hoang Diep Nguyen Trong Dai Le Thanh Tung Supervisor:
Capstone Project Spring 2014 eBuz E-commerce System.
Hanoi - December 2012 Capstone Project. Project Team Supervisor: Mr. Nguyen Hong Ky FLIS Team: Pham Hoang Phuong Chu Dinh Nam Pham Van Quyen-
DEAL AGGREGATOR Supervisor Supervisor: Trần Đình Trí Students Students: Nguyễn Mạnh Huy Nguyễn Thanh Thủy Nguyễn Quốc Tuấn Đinh Văn Thể Đỗ Duy Việt.
VNCreatures Project Presentation V-creatures
SALE AND INVENTORY MANAGEMENT SYSTEM Supervisor: Mr Phan Duy Hung.
Ha Noi - April Project Team Supervisors: Mr. Phan Duy Hung PMS Team: Vu Anh Truong Le Hoang Dan Nguyen Quoc Tuan Le Doan Tien-
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
CAPSTONE PROJECT iTest Group Members Dao Van Son Le Thi Huy Duong Do Thanh Trung Nguyen Duc Loc SupervisorNguyen Van Sang.
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
METRO CALENDAR A new way to manage your life 1. Table of contents ›Introduction ›Problem definition ›What’s metro calendar ›Project organization ›Project.
LOGO Unicorn Team Capstone Project. Project Team Supervisor Mr. Nguyen Tat Trung Nguyen Hong Nam Nguyen Tuan Minh Nguyen Tien HuyNguyen Truong HungNguyen.
Supervisor: Mr. Tran Binh Duong Students: Nguyen Duc Thuong Nguyen Duc Thuong Duong Hong Loc Duong Hong Loc Chu Minh Tung Chu Minh Tung Pham Van Khanh.
Travel Experience Website Capstone Project Hanoi, Apr 24th, 2014.
ROBUST MARKETING. RM TEAM MEMBER Mr.TrungNT Supervisor DucMA Developer HaDV QA & Tester Leader HuongPM QA & Tester TungNT Developer AnhND Project Manager.
LOGO e-Citizen. Phan Nhật Minh Phạm Thị Dinh Vũ Xuân Đông Phạm Thị Huyền Nguyễn Thùy Trang
LOGO “ Add your company slogan ” Final Project Group: T2H2 Mai Thi Thu Nguyen Van Thanh Do Van Huu Pham Ngoc Huy Supervisor: DungHA TrungNT T2H2 Group:
Project Dragon Small Business Website Content Management System.
Capstone Project Chatting secure on Android. Introduction Project Management Plan Requirement Specification Software Design Specification Testing & Evaluation.
Moon Fleet Management Six Sigma Supervisor: Nguyễn Trường Long Members: - Lê Hoàng - Nguyễn Đăng Phượng - Nguyễn Thanh Tùng - Phạm Phương Duy - Vũ Quang.
Location Information Networking Supervisor: Mr. Luong Trung Kien Students: Le Tien Dung Tran Quang Ngoc Duong Duc Quyen Nguyen Bao Trung Hoang Khac Tien.
LOGO Supervisor: Mr.Huỳnh Anh Dũng Students: Nguyễn Công Tuyến Nguyễn Cảnh Phương Phạm Thị Hằng Bùi Thị Huệ Trần Đức Bình Nguyễn.
House Finding Management Supervisor: Mr. Trần Đình Trí & Avengers Team 1.
ISS Team Group Member ◦ Nguy ễ n Nh ậ t Minh ◦ Nguy ễ n Kh ắ c Khu ◦ Ph ạ m Ng ọ c Hi ế u ◦ Nguy ễ n Ng ọ c Khánh ◦ Nguy.
Top.Not.59 Group: Trần Hùng Team Leader Mai Thị Thu Hà Vũ Hồng Quân Lê Thị Hoài Thu Vũ Đình Thắng Supervisor: Mr. Nguy Ễ n T Ấ t Trung.
Future Lock Security Group Member Nguy ễ n V ă n Tuy ề n – SE02119 Vũ Ng ọ c Linh – Vũ V ă n An – SE02207 Supervisor Hoàng Xuân S ơ n Project Code.
Team Collaboration Application HAKI Team collaboration - HAKI Nguyễn Văn Hiệp – SE01961 Nguyễn Hoàng Anh – SE02151 Đỗ Hữu Chiến – SE02258 Lê Mạnh Linh.
Team members: Pham Minh Ha Ly Ngoc Anh Nguyen Duc Viet Nguyen Thi Huong Supervisor: Huynh Anh Dung (Mr.)
Blood Bank Phạm Tiến Lập – SE02683 Nguyễn Sơn Hải – SE02879
Online Event Organizing Company Managemant System
Architecture Review 10/11/2004
ONLINE SHOP MANAGEMENT SYSTEM
Coach Route Searching System
Capstone Project W-CMS `.
STOCK TRADING SIMULATION SYSTEM
Supervisor : Trần Vinh Thu
RA-Team Supervisor: Tran Dinh Tri Member: Nguyen Hoang Duc(PM)
Platform Overview Provide your marketing and sales groups with a single, integrated, web based on-demand platform that allows them to easily automate and.
Pregnant healthcare website
Smart Tendering System
Baokim Mobile e-Wallet.
Online Solution for Small Shop
Presentation transcript:

Capstone Project MIDAS PROJECT

Supervisor Project Members Teacher:Nguyễn Tất Trung Teacher: Huỳnh Anh Dũng Trần Mạnh Thụy Lại Vũ Mão Nguyễn Ngọc Khanh Nguyễn Văn Hiển Trần Đình Đức Đỗ Xuân Bách

Table of content Introduction Project Management Requirements Design and Implementation Testing Result and Future Demo and Q&A 1 2 3 4 5 6 7

1. Introduction Introduce CRM

1. Introduction Existing system

MIDAS 1. Introduction Idea Easy to use Portability Analyst and Tracking Accessibility Save cost 1. Introduction Idea

2. Project management Project goal Time Success Scope Cost Mucj tiêu cho project Time Scope Cost

2. Project management Process model always have a running version of the program Difficult in specify all requirement Limit time and experience Save effort when requirement changed Neu li do chon model Iterative and incremental Neu loi ich cua viec dung model nay

2. Project management Project organization Supervisor Teacher:Nguyen Tat Trung Teacher: Huynh Anh Dung Project Manager Trần Mạnh Thụy Project Manager Lại Vũ Mão Team Leader/Developer Trần Đình Đức Tester Đỗ Xuân Bách Developer Nguyễn Ngọc Khanh Tester Nguyễn Văn Hiển Team Leader/Developer

2. Project management Milestone Jan Feb Mar Apr Intro R1 Project plan R2 Requirement R3 Design R4 Để đạt được target về time thì define ra các milestones Coding Unit testing R5 Testing R6 User Manual

2. Project management Project Plan

2. Project management Time management Weekly meeting Assign Task Personal working Individual Report

2. Project management Risk Management

3. Requirement Specification User requirement Function Administrator User Guest View acticle O Profile   View X Add – Edit – Delete Contact Email Create Form Mail Change Theme Change Article [1] X: has right [2] O: has NO right

3. Requirement Specification Functional requirement Manage data (manual by particular record and automatic by excel) Insert Update Delete View

3. Requirement Specification NonFunctional requirement Usability Reliability Availability Security Maintainability Portability Success Criteria

4. Design and Implementation System Overview

4. Design and Implementation Server App – Architecture

4. Design and Implementation Client App – Class diagram

4. Design and Implementation Client App – Class diagram

4. Design and Implementation Client App – Sequence Diagram

4. Design and Implementation Database

5. Testing Test strategy Test types: Functional testing User interface testing Data Volume testing Installation testing

5. Testing Test stage Type of Tests Stage of Test Unit Integration System Functional Tests x User Interface Tests Data Volume Tests

5. Testing Test schedule Test Schedule Start Date End Date Unit Testing 01/03/2012 23/03/2012 Integration Testing 25/03/2012 30/03/2012 System Testing 01/04/2012 06/04/2012

5. Testing How to test

5. Testing Test report Severity Total Defect Open Defect Assigned Corrected Accepted Total Open defects Fatal Serious Medium 8 Cosmetic 4 Total (Status) 12 Total (W.def) 28

6. Lesson learn Requirement specify Project management Team work

Demo & QA