STRATEGY BUILDING HARM BORGERS

Slides:



Advertisements
Similar presentations
Additionality in the context of PoA –Summary of Task Group Issues identified in the plenary a)Additionality at the PoA level How to construct sufficient.
Advertisements

Immigration Intelligence Best Practice Bali Process Ad Hoc Group 8 – 10 February 2012 Theo Kuper Manager Intelligence.
C.H. Montin, Ankara 12 May Ankara, 12 May 2014 Further techniques to improve the design of legislation Charles-Henri Montin, Smart Regulation Consultant.
Enforcement of the Seveso II Directive Enforcement of the Seveso II Directive.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
1 SESSION 3 FORMAL ASSESSMENT TASKS CAT and IT FORMS OF ASSESSMENT.
Tomas Pivoras - EMS experience1 Environmental management systems – experience from Lithuania Tomas Pivoras Kaunas University of Technology.
Introduction to RIA and the Regulatory Governance Cycle. Improving the Design and Evaluation of Regulation and the Use of Regulatory Impact Analysis Israel.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
 Road Safety the European Union Policy Carla Hess European Commission, Directorate General for Mobility & Transport Road.
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
The National Intelligence Model (NIM)
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels.
Multnomah County Health Department ►Essential Services ►FDA Food Standards ►PACE Tools for Food Program Excellence Lila Wickham March 17, 2004 ♣
ACCESSIBILITY IN POLICIES DOCUMENTS WORKING GROUP1 WP: 3 Author: Sashka Parvanova Place and date: Budapest 29 March 2012 Project partner: REGVRATSA BG.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Ship Recycling Facility Management System IMO Guideline A.962
Workshop on Interaction between Air-Quality Monitoring and Air-protection Strategies in EECCA Countries UN ECE WGEMA, June 11, 2007 Draft Strategy for.
Environmental auditing
Application of minimum criteria for environmental inspections in Bulgaria.
Health and Safety Policy
Transport ROAD SAFETY: Towards a European Road Safety Area: Policy orientations on road safety
Environmental Management System Definitions
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
The EU’s Better Regulation Package Implementation of Impact Assessment Manuel Santiago European Commission DG Enterprise & Industry.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Permitting and Inspection. 1. When is decentralization effective? Delegate most permit writing and inspection functions to lowest possible level to effectively.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Data Governance 101. Agenda  Purpose  Presentation (Elijah J. Bell) Data Governance Data Policy Security Privacy Contracts  FERPA—The Law  Q & A.
Compliance Audit Subcommittee Reporting Work Plan Copenhagen, Denmark 6th of May 2010.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Good Management Effective Organisations Bjørn Bauer PlanMiljø.
SWOT - ANALYSIS S TRENGTHS W EAKNESSES O PPORTUNITIES T HREATS INTERNAL FACTORS EXTERNAL FACTORS.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 EMS as part of Integrated permitting and inspections Rob.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Session 3: Compliance and Enforcement The IMPEL Project easyTools
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Inspection and enforcement approach Pavel Šremer Vedoucí projektu.
Visit us at E mail: Tele:
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
Departement IBGE - BIM 1 Impel Copenhagen 8+9/09/2005 Brussels Institute for the Management of the Environment Jean-Pierre Janssens Director Head of division.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Safety Objectives of European Railway Agency Raigo Uukkivi Estonian Railway Inspectorate DAGOB Final Conference , Tallinn.
Curriculum Futures Looking after learners, today and tomorrow To develop a modern world-class curriculum that will inspire and challenge all learners and.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
1 Corruption Prevention Strategies. 2 Specific Objectives: 1. Corruption Loopholes 2. Corruption Prevention Strategies 3. Conclusions.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Genetically Modified Organisms André van Loon VROM-Inspectorate.
ILP model- Montenegro OSCE Annual Police Experts Meeting
ISO 14001:2004 Clause 4.3 Planning. Clause 4.3 Planning Key Requirements of Environmental Management System Certification.
INSPECTION PROGRAMS Robert Mout DCMR – Environment Agency
Environmental inspection in CR: is it necessary to change the strategy? Ladislav Miko MoE.
Integrated permitting and inspections
Inspection and enforcement approach
Health and Safety Policy
Strategy Formulation Process Workshop B
A Step by step guidance for permitting and inspection
SWOT Analysis Workshop A
STRENGTHS WEAKNESSES OPPORTUNITIES THREATS SWOT - ANALYSIS
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
4.5 Checking and Corrective Action Monitoring and Measurement
Analysis Formulation Implementation The Policy-Making Process Problem
The Policy-Making Process
Accountability Issues in Proposal Writing
Environmental inspection in CR: is it necessary to change the strategy? Ladislav Miko MoE.
© Fresh Thoughts Consulting
Financial Control Measures
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

STRATEGY BUILDING HARM BORGERS Notes DCMR ENVIRONMENTAL AGENCY

Strategy building H. Borgers, 2004 What should the focus of the enforcement strategy be? Tools oriented ? Problem oriented ? Both tools and problem oriented ? Strategy building H. Borgers, 2004

Strategy building materials Defining the Enforcement Strategy Strategic Management View Environmental Policy Cycle EU Minimum Criteria for Inspections Enforcement Tasks and Environmental Problems Strategy building H. Borgers, 2004

Strategic Management View (1) Process – Content – Context management Process: how, who, when ? Strategic steps (SWOT; plan formulation; implementation) Strategy formulation (writing the plan, including the way to implementation) Solitary tactics and cooperation agreements (alone/with others) Strategic decisions (plan approval; resource allocation) Strategy evaluation (report on plan-do-check-act cycle) Strategy building H. Borgers, 2004

Strategic Management View (2) Process – Content – Context management Content: what ? Outside in (environmental issues) and Inside out (resources) Political debate and public discussion Context: where ? Deterministic planning or creativity in handling circumstances Strategy building H. Borgers, 2004

Environmental Policy Cycle Legislation Evaluation Permitting Compliance & Enforcement Tasks Authority Policy objectives Enforcement cycle Strategy building H. Borgers, 2004

Enforcement cycle Strategic inspection objectives Inspection preparation Database records & monitoring Management control Planning document Regular evaluation Inspection report Resources Tasks & authoristions Site visit Site survey Strategy building H. Borgers, 2004

Strategy building H. Borgers, 2004 EU Minimum Criteria (1) Process (criteria 2.2) Planning programmatic and ad hoc inspections Collecting information (actual site visits and surveys) Analysing results and defining the follow up Making regular evaluation and reporting Strategy building H. Borgers, 2004

Strategy building H. Borgers, 2004 EU Minimum Criteria (2) Content (criteria 2.3) A plan for inspection should cover a defined period of specific enforcement targets for a defined area or organisation On-site visits should be integrated, examining the full range of environmental impacts, as far as organisational arrangements allow Context (criteria 2.6) The inspection activities (the implementation results of the plan) must be evaluated and must be made publicly known Strategy building H. Borgers, 2004

Programmatic and Ad hoc (1) Programmatic inspections (2.4) Checking compliance with laws, regulations, permits Promoting operators behaviour by creating understanding Examining the environmental impact of the installation Strategy building H. Borgers, 2004

Programmatic and Ad hoc (2) Ad hoc inspections (2.4) Investigation of serious complaints Investigation of significant accidents and non-compliance Visits in case of renewal or modification of permits Strategy building H. Borgers, 2004

Strategy building H. Borgers, 2004 Tools and Problems (1) Tool orientation: enforcement tasks and instruments Philosophy: planning each tool comes first, while combining them to solve real problems comes later. Strategic steps, using the policy and enforcement cycle Allocating resources and defining operational targets Definition of performance indicators Strategy building H. Borgers, 2004

Strategy building H. Borgers, 2004 Tools and Problems (2) Problem orientation: environmental state and impacts Philosophy: surveying problems comes first, while searching for the appropriate tools is based on the type and risk of the problem Strategic investigation of possible environmental impacts of installations Definition of environmental quality indicators Strategy building H. Borgers, 2004