Mezzanine Update.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Structural Steel Construction
Unit 43 Wall Framing Wood-framed Wall Components • Constructing Wood-framed Walls • Sheathing Exterior Walls • Weather Barriers • Rainscreen Walls • Structural.
Grimsby Secondary School
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
METHODS OF RETROFITTING
Heavy Concrete Construction Formwork
Exterior Walls (Wood).
Door Drivers seat 2x4 wall with window (see page 1) Tunnel Open beams (2x6’s) (simulate burn through) Three steps 60 degree simulated roof. (with shingles)
Competency: Draw Wall Sections
Handrail Assembly and Steel Stairs. Handrail Terminology u Guardrail –top most rail on balcony –higher than handrail u Vertical Rail –members between.
Engineering Overview Presenter’s Name
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Residential Framing Prints Unit 14.
OSHA Subpart Q Concrete and Masonry Construction.
Wall Form Design Example (Continued)
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Walking-Working Surfaces. Housekeeping is more than being tidy All areas are clean, orderly, and sanitary Floors are clean and dry Areas free of protruding.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
General idea of a couple of check rod system and adjustments
Floor Systems and Foundation Support
Beam Design.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
DECKS. Square Corner Framing square Square Corner triangle.
Grimsby Secondary School TCJ3C
Pre-Proposal Meeting for Architectural Services
Floor Framing Unit 29.
Wall and Ceiling Construction
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Residential Construction Mr. Todzia
Ag Construction Studs Vertical framing boards are called.
Wood Construction CTC-375.
Fundamentals of Structural Detailing
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Chapter 13 Concrete Form Design. SLAB FORM DESIGN Method WALL AND COLUMN FORM DESIGN DESIGN OF LATERAL BRACING.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Shake Table! Earthquake Resistant marshmallow structures Scripps Classroom Connection Question of the day: how would you design.
Drafting 2 (Arch) Quiz Review #5
Floor Framing.
Floor System Sizes and Materials
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Mezzanine Build Plans.
Leads Institute of Technology & Engineering
Suitable for additional ground blind at base.
Guide Right™ Immediate Placement & Immediate Load
Framing Agriculture Structures
Competency: Draw Wall Sections
Maxillary Single Implant Case Angular & Linear Correction in 2 Planes
FORMWORK DR. Nabil Dmaidi.
Tilt N’ Store Design Analysis
Competency: Draw wall sections and details.
Architecture Mr. Graves
Framing Agriculture Structures
•Connecting to the Foundation & Bearing
Arch205 building construction wall systems- Steel
Assembly instructions for M-K all bolt together hoppercone kit.
FASTENERS Screws, Nails, Bolts….
Tilt N’ Store Design Analysis
Vocab. Vocab Wall Layout Floor Layout Ceiling Layout.
Competency: Draw Wall Sections
Introduction The Gamma Bracing System
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Neutron guide Shielding Concept
Information related to Chapter 7 in the textbook
Chapter 13 Concrete Form Design.
Introduction The Gamma Bracing System
Presentation transcript:

Mezzanine Update

Outline: Review key questions from Mezzanine Analysis presentation Analyze Lateral Loading Scenarios Hand rails material Reference Material Mezzanine Build Plan Outline

Next Steps/Questions: Can the mezzanine be anchored into the supporting structure? YES Anchors would be placed into side walls (and potential back wall) to prevent lateral movement and offer stability If the mezzanine needs to be free standing: DOES NOT NEED TO BE FREESTANDING Knee Braces will need to be added to each post. This requires unique analysis. Sheathing would need to be added to the columns/post to restrict lateral movement. Although they are not very strong, an analysis needs to be conducted on Lateral Loads to our system. IN PROGRESS Fireproofing the structure may be a requirement from the city. PROPERTY MANAGER WAS NOT CONCERNED, ACTION TBD A permit may be required (city originally said no, but Subject Matter Experts think one will be needed). PROPERTY MANAGER WAS NOT CONCERNED, ACTION TBD If a permit is required, there is a chance this mezzanine analysis will need to be signed/stamped by a Professional Engineer. TBD

Lateral Loading Analysis Sourced from ASCE 1.4.3 1% DL + small % LL (eng. discretion) LL = 125 lb/ft2 LL ≈ 23250 lb DL = 2538 lb (0.01*2538)+(0.01*23250) Lateral Load = 258 lb Item Linear Weight [lb/ft] Total Length [ft] Total Weight [lb] 2x4 HF 1.1 120 132 2x8 HF 2.3 476 1095 2x10 HF 2.9 24 70 4x4 PT 4.8 12 58 1.75 x 11.875 LVL 6.1 78 3.5 x 9.25 PSL 10.1 242 ¾” Ply 2.5 lb/ft2 186 ft2 465 Total 2538

Securing to Cinder Blocks Material Powers Fasteners Lok-Bolt AS Sleeve Anchor Tapcon cement screw Angle brackets Method Use product data sheets to check for allowable load and shear Attach ledger board to back wall Secure column at top and bottom with angle bracket

Hand Rails Requirements Material Method 200 lb point load in any direction OSHA height requirements Material 1-1/2" SCH 10 (1.90 OD X .109 wall) A-500 Structural Steel Handrail Pipe Method Pipe fittings Fabrication https://www.simplifiedbuilding.com/solutions/pipe-railing/ http://www.alleghenyfence.com/images/rg4B.jpg

Hand Rails Pipe fittings Fabrication Pros Cons Pros Cons Removable Simple installation Cons Fittings add cost Pros Less material costs Available welding resources Cons More man hours Prepped off site

Reference Material Simpson Strong Tie Catalogue ASCE Standards 7-10 Weyerhaeuser product literature Powers Fasteners product literature Tapcon product literature NDS literature

Build Plan Outline Macro Level – “Bottom Up, Back to Front” Detailed: Measure foundation and walls to determine whether methods, such as shimming or concrete leveling, are needed to “square” facility Lay sill plate Cut columns (near walls only) to appropriate heights and install. Place column anchors Place supporting beam plate along columns Cut and install “ledger board” on back wall (anchoring to the as appropriate)

Build Plan Outline Detailed Continued: Cut and install remaining beams. After (or possibly during) the placement of Beam C, begin installing columns supporting elevator opening Install joist hangers Cut and install joists Place any additional anchors that may be required Sheath the top of the mezzanine with plywood Install handrails (and possibly stairs)