PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Engineer Training Electronics Cabinet TJ8300 / TJ8500 Electronics Cabinet.
MTTR and spare parts policy for BT equipment 23/1/2008 ATC/ABOC days MTTR and spare parts policy for BT equipment BT equipment with long MTTR PSB ISOLDE.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
J. Borburgh, B. Balhan, E. Carlier, S. Damjanovic, L. Ducimetiere, T. Masson, V. Mertens, A. Prost, L. Sermeus.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
1 1. Some recent views ( ) 2 Linac tunnel
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
IN 1900 ICT Project Final Presentation. Group name : Code Squad.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Wim Weterings Remy Noulibos
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Update on the PSB Cooling and Ventilation Systems
APPLICATIONS Designed and manufactured to meet the needs for constant pressure required by modern plumbing systems, such as : Domestic applications and.
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
SESAME Control System Status
Cabling for LHCb Upgrade
Operating the septa beyond their design specs
EYETS David Hay EN-OSS.
LIU / HL-LHC Cost and Schedule Review
EC Activities Status for LIU September 2017
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
LIU–PLI report LIU PSB meeting.
EC Activities Status for the LIU
De-cabling strategy during YETS
TE-ABT Activities for LS2
prepared by R.A.Barlow 30/056/2016
TE-ABT PLC and SCADA usage
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
J. Uythoven for the MPE-MI & MS Teams
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Special Magnets Controls
Linac 4 Devices Controls and Monitoring Status
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
FIRELEC Migration Solution
FIRELEC Migration Solution
Yannick Dietrich François Bouvet SOLEIL
FIRELEC Migration Solution
Rack installation and local tests for the MEBT Chopper Rack
Status of the BI Work Package in the LIU-PSB frame
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

PS / Booster septa control Control upgrade Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system OUTLINE Equipments presentation Equipment / control connection Control presentation Upgrade motivations Process Planning Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Equipment's presentation: location PS / Booster rings   Equipment 1 BESMH 2 BT1SMV10; BT4SMV10 3 SMV20 4 PISMH42 5 SMH57 6 SMH16 7 SEH23 8 SMH26 9 SEH31 Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Equipment's presentation: Classification Horizontal displacement SEH23 Electrostatic septa (3 motors) SEH31 SMH16 Electromagnetic septa (2 motors) SMH26 SMH57 BESMH PISMH42 Vertical displacement BTSMV20 BT1SMV10 BT4SMV10 Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Equipment's presentation: Control components Each movement is composed by: 1 Motor 1 Potentiometer 2 Micro-Switches { Potentiometer’s 4 / 22 units total 3600° +10° -5° 5 / 10 KΩ SCEM Code: 11.87.12.800.8 micro-switches 44 units total SCEM Code: 06.92.32.562.5 Septum Electro Static Motors + worm gear’s 22 units total Zürrer LFV55/4-1 1kW Septum Electro Magnetic Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Equipment’s / control connection Pinout tables Electrical schemas Electrical cabinet sample (Ring) SMB: septa monitoring box Patch panel sample (Surface) Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Control presentation: location Building 359/R Building 361/R   Rack Hosted controls 1 CHR 122 SMH26 2 CHR 121 SMH57 3 CHR 120 SMH16 4 CHR 119 SEH23; SEH31   Rack Hosted controls 1 658 BESMH; PISMH42 2 659 BT1SMV10; BT4SMV10 3 660 BTSMV20 Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Control presentation: Equipment’s Building 359 (PS) Building 361 / BCER (PSB) Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Control presentation: Equipment description TE-ABT 1. Anti-collision 2. Position acquisition 3. Movement Interlock (Single axis) 4. Power supply (24v/2A Interlock system) 5. Power supply (15v/2A SMB movement acquisition) 6. Power supply (48v/2A SMB movement control) 7. Position comparators 8. G64 8.1. RTI – (remote terminal interface ) 8.2. CPU 8.3. Digital input/output (Status) 8.4. Movement position command (DAC) 8.5. Movement position acquisition(ADC) 8.6. Power supply (5-15v/1A) BE-CO Control panel (SEH31) Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Control presentation: Architecture Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Upgrade motivations GM classes to be replaced by FESA G64 not supported anymore. Apply updated control standards. Replace equipments with approximately 20 years old. Improve remote control of the installations. Frame the facilities in TE/ABT current standards. Keep current infrastructure (cabling, SMB) Marco Pimentel TE-ABT-EC

PS / Booster septa positioning system Process Planning Study Functional specification approval (EDMS 1551291) Planning Engineering specification approval Preparation Production Removal preparation Execution 1/2 PSB - Installation Commissioning Execution 2/2 PS - Installation } EYETS 2016-2017 } YETS 2017-2018 Marco Pimentel TE-ABT-EC