Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
ATC/ABOC days, 24 January 2007Edda Gschwendtner1 CNGS : Status and Outlook Edda Gschwendtner, AB/ATB Summary of CNGS 2006 Reflector Repair OPERA Brick.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Next Steps, Priorities, Strategy for Spares Ray Veness.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
HMS Status Steven Lassiter Jan 20, 2017.
Matters arising RADWG - 3 July 2009
News and Introduction from CERN June 15th, 2005
CONS and HL-LHC day Analysis of needs from TE-EPC
Situation of the Static Var Compensators at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
CONS and HL-LHC day Analysis of needs from BE-CO
Francois and Lau EATM 17 July 2012
ELENA installation and commissioning status
East Hall under construction
Outlook by the Physics Coordinator
Introduction to the North and East Areas and CNGS
AD consolidation activities in LS2
EC Activities Status for the LIU
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Installations, modifications, consolidation in 2005:
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Renovation of the 45-year old PS magnets
the CERN Electrical network protection system
Irradiation Facilities Questionnaire
nuSTORM and the Physics Beyond Colliders workshop
East Hall under construction
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Collimator Control (SEUs & R2E Outlook)
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
2003 test beam with 25 ns bunched muons
CNGS Project Overview Konrad Elsener.
Chapter 8 Software Evolution.
Experimental Areas – LS2 planning
Access Control for CERN Experimental Areas
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
Comments on the North Experimental Area Consolidation Request Form
Presentation transcript:

ATC-ABOC 24th Jan-2007 Summary of session 6 Experimental areas and CNGS I. Efthymiopoulos Introduction K. Cornelis Operations V. Baggiolini SPS EA Renovation: Status and Outlook W. Kalbreier Magnets: PS East + SPS North Area Y. Gaillard Power converters of the SPS and PS EAs R. Nunes EA Access Systems: 2007 and beyond E. Gschwendtner CNGS: Status and Outlook C. Rembser Outlook on (future) physics program L. Gatignon & J. Lettry 9/02/2007

I.Efthymiopoulos: Introduction to North and East Areas and CNGS

Operations in 2006 - Highlights The Very Low Energy beam of H2 was fully exploited by CMS Beam tunes for calorimeter calibration from 1350 GeV/c Successful test for LHCb-VELO in H8 Validation of final detector module before installation

Exciting results from the bend crystal test in H8 Volume reflection with high efficiency at high energies verified Although the full potential of the beam was not exploited Impressive work and results for the ILC detector R&D teams Newcomers to CERN; decision pending for long term usage of the test beams at CERN (competition with FermiLab…) Modifications done in TCC2 and M2 line during the 2005 shutdown allowed to increase the beam intensity for COMPASS by 15%  1.401013 protons/extraction on T6 (16.8 sec sc) CLOUD completed successfully the first commissioning run in T11 line

Operations in 2006 - Statistics

Most of the small experiments are scheduled in weekly slots Try to satisfy more requests WA not available anymore… Budget constraints (travel,…) for the users limit their stay at CERN Fully exploit the possibilities in the exp. halls multiple exp. areas per beam line parasitic users

East Area downtime dominated by F61S.BHZ01. Replace by MCB for 2007. North Area instrumentation and controls renovation went well, but incomplete. To be fully completed. The commissioning period with beam was very useful. To be scheduled at every start-up. Request for scheduled Beam Development slots (2 x 8 hrs per beam) Number of beam requests for NA rising steadily, 2 major changes of installation per week on average. Majority of users achieve most of their goals East Area downtime dominated by F61S.BHZ01. Replace by MCB for 2007. Long Flat Top very useful for e.g. COMPASS Some additional features in Cesar would ease operation, some equipment and software still to be renovated. (Extend to East Area?) Implement missing equipment and features Some safety improvements needed around EHN1: Implement fences, cleaning. CNGS went well until hit by water leak on reflector Manpower decreasing in AB and support groups.

Introduction Comments - Questions Consolidation threshold: If planned consolidation activities are dropped or delayed (i.e. lacking manpower) Consolidation of low Risk-factor items (i.e. experimental areas) is an alternative spending, (S.Baird). Define consolidation items. There is missing manpower in the radioprotection group (D.Forkel). Include constraints in planning. In order to adapt to new RP regulations, some of the areas must be reorganized and detailed measurements must be done (D.Forkel). Some new shielding must most likely be added in several places

K.Cornelis: Operations of North and East Areas and CNGS Impact of NA on operations (seen from the logbook) ~1 Action / shift

East Area: handling of technical problems only, beams operated by users North Area: also setting up and changes of beam conditions Communication with users and EA physicists must be further improved, operators lack knowledge of North Area. So do the users sometimes. The Support from EA physicists is essential. Frequent schedule changes (in between meetings) and sudden changes of requests Stability problems in TT20. Autopilot is of great help. CNGS operations is stable, but rely on good diagnostics and monitoring Heavy RP involvement in access procedures, in particular for TT20 and CNGS Good tools are essential to do more work with less people

Operations Comments - Questions SPS competence is drifting away to LHC Improve training, to be added in MAPS Main difficulties and peak load occur after MD. More operators can be provided at those times in 2007, but not after. Can we schedule peak load EA-operator presence once per week? There is a non-negligible load from Experimental areas on Operation outside beam periods , e.g. during MD’s or stops: access, magnet or supply interventions, timing, ..

V.Baggiolini: SPS Experimental Areas Renovation: Status and Outlook SPS North Area 7 beamlines 3 experimental halls ~20 test facilities 5.8km of beamlines ~1000 pieces of equipment V.Baggiolini: SPS Experimental Areas Renovation: Status and Outlook Users ~ 2000 experimental physicists SPS operators EA Liaison physicists

A good job has been done, but there is still work to do Hardware renovation mostly completed. Remains XCED and XEMC for 2007 and the migration of positioning motors and analog chambers Software has been operational, but some functionality still missing to allow for easier and more efficient operation. Teething problems of new devices have largely been solved, but reliability problems with some non-renovated deviced (EQ-bus). Manpower? Some work is urgently needed there. EA work is competing for resources with LHC, but there are synergies with LHC standards. Areas serve the LHC experiments!

SPS EA Renovation: Status and Outlook Comments - Questions East Area still suffers from not having beam loss monitoring for the primary beams. First asked for in 1998, but not foreseen in manpower plan. East Area controls renovation, add instrumentation? Action: Global review of East Area

W.Kalbreier: Experimental Areas magnets 2003-4: 3x F61S.BHZ01.MNP23-OSWALD 2006: 2x F61S.BHZ01.MNP23-SEF, T7.QFO01.Q606, T11.QDE01.Q604, F61.QFO01.Q74, F61.QDE02.Q12

F61S. BHZ01.MNP23 10-2006 breakdown 3rd coil SEF ‘Weak’ magnets: Horror Gallery Q800 F61S. BHZ01.MNP23 10-2006 breakdown 3rd coil SEF Accessibility: Q600

22 types of East Hall Magnets: in operation & spares as per January 2007

East hall primary zone: (Access possible during PS operation) Extremely densely packed + covered with concrete shielding roof  for any magnet replacement an opening + closing takes 2 weeks + cool-down + magnet exchange period Q800 Q600 Q74 F61S BHZ01-MNP23 Q120 M105 Q120 Q600

Magnet Status for the primary Beam Transfer Reliability issue OK: spares available from EA

Magnet status for the NEA & secondary Beams (B: mineral insulated coils) OK: 10 spares available from SPS stocks

East Area: 63 magnets installed of 22 different types East Area: 63 magnets installed of 22 different types. Represent 8% of #NA magnets but require same amount of FTE! Main problem is F61S.BHZ01 – work ongoing, Replace by MCB for 2007. A total of 11 ‘weak magnets’ will be reduced to 8 for 2007. Detailed list of problems and plans available in slides. Difficult access to magnets in primary zone, very radioactive. Quest for reorganization of East Area beam lines with new and fewer types of magnets and easier accessibility. To reduce manpower and radiation budget. Problems cannot be managed with available staff! Action: Global review of East Area North Area has better situation in terms of different types. Secondary beams: 540 installed, 22 types. TT20: 62 / 10. TDC2: 73 / 12. Main actions proposed concern QTA/QTL and MSN manifold replacement and the production of spares for the TT20 splitters (risk of vacuum leaks). The magnet interlock system is obsolete.

Experimental Area Magnets Comments - Questions East Area renovation would be more cost effective on the long term activity, but PS2 has to be taken into account in the overall picture. Can we keep the East Area alive for some 10 years in the present way? Renovation mandatory to keep the East alive for 10 years Manpower situation very critical. Loss of expertise

FAULTS STATISTICS 2004 2006 Exploitation period 26 weeks 20 weeks Interventions 166 162 Duration of interventions 130 H 155 H Mean intervention time 47’ 57’ Interventions / converters 0.4 0.52 Power faults 21 12 Electronics faults 94 91 Operation faults 6 29 External faults 18 30

SPS NORTH AREA POWER CONVERTERS: MAIN CONCERNS Y.Gaillard: Power converters SPS NORTH AREA POWER CONVERTERS: MAIN CONCERNS Electronic card reliability PCB connector contact ~ 6600 electronic modules of this type are in operation Wire wrap Obsolete components Cabling ageing Split insulation Damaged gilded contacts

FUTURE CONSOLIDATION PROJECT Replace 180 power converters (≤500A) by new switch-mode power converters. Renovate 150 thyristor converters. New electronic control. Budget estimation : 23 MCHF Provisional schedule: 6 years 2 years studies and contracts 4 shutdowns for implementation Manpower: 19 FTE No budget allocated in AB consolidation! (below red line!) Nothing before 2010!

North Area: 330 converters of 8 types, in operation since 1976 North Area: 330 converters of 8 types, in operation since 1976. Obsolete electronics (wire-wrapped). Unreliable electronics cards and cabling. Control system renovated. Some teething problems observed during operation. Databus timing problem now solved. Drivers added to relieve databus load. No controls problems anticipated for 2007. But MTBF very low (<7000 hrs) and decreasing. Propose to keep present maintenance level and expertise (First line). But a major consolidation program is required: 23 MCHF, 19 FTE, 6 years. East Area: 80 converters of 10 types. In operation since 1970, but electronics replaced in 1991. Main problems with polarity switches – improved for 2007. Need to improve diagnostics – which service to call. Improve diagnostic tools

Power converters Comments - Questions Could replace only the electronics of NA converters, but there are also many problems with the power part. Interlocks now formally transferred to AB/CO. A discussion with them must be initiated

R.Nunes: Access systems SPS Zone North PS East Hall PS AD

One major problem in the North Area lasted over the weekend, due to non-availability of piquet service with outside contractor. This problem will be solved by migration of Factory Link to Windows. The East Hall and AD access systems will be replaced (shut down 2007) by a new one, similar to the SPS facility but with modern PLC control. No access card required to access the area (this can be implemented at a later stage). Reconfiguration of chains/zones via pin matrix. Manual and PCR vetoes are implemented. Possibility to extend to SPS North Area: To be investigated

Access Comments - Questions It was confirmed that only the responsible have access to the racks that allow reconfiguration. Racks are in a protected building. Actions require validation with a special key. Like in the North Area there is a link between the areas system and the machine system (forced door, areas safe, etcetera).

E.Gschwendtner: CNGS Opera CNGS operation II: CNGS Commissioning: CNGS low intensity run: 12 - 13 October: 9.5x1015 p.o.t. CNGS operation II: 26 - 27 October: 5.8x1016 p.o.t. CNGS operation I: 18 - 30 August: 7.8x1017 p.o.t. CNGS Commissioning: Weeks 28, 30, 33: 7x1015 p.o.t. 1x1013 Opera Muon from CC interaction in the material in front of the detector (BOREXINO, rocks) CC event in the first magnet

Remote control handling procedure needed The CNGS Reflector Repair location : Remote control handling procedure needed

CNGS Horns: Other Possible Weak Points Water inlet bellows Thin stainless steel foil brazed on ceramic sleeve Thin foil brazed to water tube Water sprayers Double-walled  no leak when bellows failure 50% already replaced

CNGS commissioning went very smoothly. Dry runs were very helpful. Need long cool-downs before allowed to access. More studies required for TBID calibration, polarity change, muon detector linearity, alignment stability between target and horn Reflector developed water leak. Repair strategy has been defined. Cannot be done in situ. Minimal repair could be ready just in time, but no contingency. Other possible weak points: water inlet bellows and water sprayers. Both are being studied and can be improved. Opera mass production of bricks has not yet really started. In most optimistic scenario 125 kbricks by the end of the run, 206k needed.

CNGS Comments - Questions The present repair planning has to keep some contingency, to be included in the overall schedule. (OPERA RB requirement: 75%) Water inlet bellows will be modified on the spare horn. Action on original horn and reflector to be discussed with RP (welding required!) If the water leak had not happened after only 1% of a normal run, the intervention would have been excluded. In the project, the horn is a disposable item (1 spare horn, No spare reflector ). No repair has been foreseen. This leak is a strong indication for the need of a spare reflector (Cost 300 – 500 kCHF)! Foresee a remote controlled installation procedure and a storage space.

Conclusions CERN is the place to be! C.Rembser: Outlook Conclusions CERN is the place to be! unique, high quality facilities, excellent expertise and efficient support took long time to build up takes continuous efforts to keep important & fundamental (non-LHC) physics program @ PS/SPS more projects in “committee pipeline” unique possibility of general purpose test beams at high energies 2007: will be used by >47 different groups, O(1500) users expect increasing demand from LHC-upgrade, ILC, … need feedback/dialog from/with community, e.g. need of a new Gamma Irradiation Facility…

DIRAC running for 2 more years, then consider move to North Area CLOUD commissioning runs. Plan physics runs 2010-2012. Approved depending on resource availability/ East Area test beams 55% of available time Coincidence of LHC and space experiments schedules. Expected to increase from 2008 for LHC upgrade, ILC and others. Consider to improve instrumentation, equipment, space. Need for radiation facilities! COMPASS approved for 2007. Proposal review for 2008+ very soon. P326 proposal under review. Run 2009+. NA49 future proposal for different ion species. Test beams in very strong demand. Worldwide unique facility CNGS: commissioning run followed by physics as soon as committee approval. CERN is the place to be. Installations and expertise are unique. Must be preserved!

No plans exist for ions other than lead. Have to study impact on AB No plans exist for ions other than lead. Have to study impact on AB. Ongoing. Consider reorganization and optimization of East Area Fewer beams but of better quality and easier access to equipment? PS2 experimental area potential should be communicated to user community. Underground for the high-intensity beams. Manpower needs and availability in support groups for restarting beams must be communicated to the Committees Users should clean out better after their experiment stops. Lead ions for fixed target require good time structure – to be studied. Heavy ion interlock dismounted. New system to be designed (LOKN). Take into account that operation is now from CCC. Route via LEIR to PS is the only option in the future. CNGS: “No bricks, no beam”