PEP-II test chambers installation

Slides:



Advertisements
Similar presentations
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Advertisements

Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort: Clearing electrode and triangular fin M. Pivi T. Raubenheimer, J. Seeman, T.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
9-12 April 2007 International Linear Collider DR electron cloud R&D effort 1 st part: Tests in PEP-II M. Pivi L. Wang, D. Arnett, G. Collet, R. Kirby,
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
ILC Damping Ring update on collective effect electron cloud R&D Mauro Pivi SLAC ILCDR06 Cornell Workshop September 26-28, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
30 May – 2 June, 2007 ILC 2007 DESY, Germany ILC R&D plan WP 2.2.3: Electron cloud M. Pivi -SLAC ILC 2007 Hamburg, Germany.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
ILC Damping Ring Collective Instability update: Electron Cloud Mauro Pivi SLAC ILC Vancouver Meeting July 19-22, 2006.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
G. Rumolo, F. Zimmermann, Cornell Workshop LC e-Cloud Activities at CERN G. Rumolo, F. Zimmermann WP e-cloud task contacts: F. Zimmermann, CERN;
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
3 rd INSTALLATION: chicane magnetic field tests PEP-II e+ ring 1 st and 2 nd Feb 2008 Electron cloud installation studies at SLAC ILC tests - SLAC Cherrill.
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
Electron Cloud Studies Theo Demma INFN-LNF Frascati.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
AEC09, CERN Mauro Pivi, SLAC TiN chambers and SEY measurements in PEP-II M. Pivi J. Ng, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper, C. Spencer, B.
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Intra-Beam Scattering and Electron Cloud for the Damping Rings Mauro Pivi CERN/SLAC CLIC Collabortion Meeting CERN 9-11 May 2012 Thanks to: F. Antoniou,
Possible solutions for the e- cloud problem – SPS upgrade meeting - Frank Zimmermann, 21 March possible solutions for the electron-cloud problem  suppress.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
Observations of Electron Cloud Phenomena at PETRA III Presentation at the ECLOUD 2012 workshop Rainer Wanzenberg ECLOUD 2012 June 5-8, 2012 Hotel Hermitage.
5 November, 2007 DR - Kick Off Meeting 1 Electron Cloud Work Package M. Pivi Damping Rings EDR Kick-Off Meeting Daresbury, United Kingdom 5-7 November.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Electron Cloud R&D for Future Linear Colliders
CesrTA Status Report Mark Palmer July 8, 2009.
remarks & workshop organization
RECENT DEVELOPMENTS IN MODELING
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Recent Electron Cloud Studies at CESR and Future Plans
Work In January 2007, we installed 5 chambers in a straight Field Free region of PEP-II Low Energy Ring (LER). Closest bend at ~18 meters upstream: 1 stainless.
Single-bunch instability preliminary studies ongoing.
ILC DR instability simulations
M. Pivi PAC09 Vancouver, Canada 4-8 May 2009
CesrTA Experimental Schedule and Priorities
ILC Damping Ring electron cloud WG effort
Electron Clouds at SLAC
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

PEP-II test chambers installation SEY GROOVE 1 GROOVE 2 FLAT 1 FLAT 2 COLLECTORS ENERGY ANALYZER THERMOCOUPLES GROOVE CHAMBERS EXPERIMENT SEY TEST STATION

SEY test station in PEP-II LER 0o position 45o position

Fin/Flat TiN chambers in PEP-II LER Flat chamber Fin chamber

Secondary Electron Yield Measurements at SLAC

SEY test chamber 19 March 2007

Grooved chambers

Collector signals vs PEP-II LER current Stainless steel chamber Electron integrated energy distribution Stainless steel chamber Collector signal vs retarding grid field (10V = - 500V) PEP-II LER current still raising (2.7A  4A)

Compare vacuum chamber e- currents Measured e- current in grooved and TiN flat chambers << StSt chamber. PEP-II LER current still raising (2.7A  4A)

Solenoid on and conditioning effect 14jan 17mar 18jan 19jan External solenoid on, grooved/flat chambers (10A  Bz=20 Gauss) Electron and photon conditioning in time on stainless steel chamber 3 days ROD starting next Monday, 1st sample transferring to laboratory for SEY and surface measurements after prolonged e- and ph dose.

Ready for INSTALLATION Coating of extruded Al chambers Projects ONGOING TESTS AT SLAC: TEST in LOCATION Ready for INSTALLATION Status SEY TESTS STRAIGHT PEP-II LER PR12 November 2006 Ready FINS RECTANG. Coating of extruded Al chambers ONGOING PROJECTS: CLEARING ELECTRODES BEND PEP-II LER PR12 FY07-FY08 Design FINS TRIANG.

Layout installation – in PEP-II f 3.5” f 1.73” Proposed reduction in chamber diameter Chamber cross section 22” ~25” 59” (D-BOX) (D-BOX) BEND BEND BEND BEND tapered chamber 1 spool chamber Grooved chamber(?!) Clearing electrode chamber tapered chamber 2 D-BOX=diagnostic box, electron detection centered on BEND and 13.5” long

Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Rotatable Vacuum Tube, 4.00 OD x 3.50 ID Collector Port Flange 3.375” CFF, Non-Rotatable Tube, 2.00” OD x 1.73” ID Flange to Flange Length = 59.00” 1.33” CFF access port Feedthrough, Ceramtec #1084-01-W Mounted to 1.33” CFF

Test Chamber with Electrode Electrode, Copper 0.063” x ~1.0” x 50.0” (49.606” between feedthrough centers) Clearance between Electrode and chamber Varies between .070” and .080”

LTOT Rpipe 1 t h3 h1 h2 LTAP Dimensions: LTOT630 mm LTAP115mm Rpipe=44 mm =60 deg h1,h3,h3=5 mm t=2 mm 2nd Geometry: 1 Ports 50 Ohm 1st Geometry: 2 Ports 50 Ohm LTOT Rpipe 1 David Alesini, Frascati, Feb 2007 t h3 h1 First discontinuity LTAP h2

HFSS Results on Copper electrode stainless steel chamber D.Alesini Frascati A. Krasnykh, SLAC, Mar 2007 Longitudinal Impedance: power deposited to electrode ~10W with PEP-II beam, and ~2W for ILC DR beam.

Triangular groove chamber – (see Lanfa)

Single-bunch instability preliminary studies ongoing. Cmad simulation code status Tracking the beam in a MAD lattice for ILC DR, parallel code, interaction with cloud at each element in the ring and with different cloud distribution, single-bunch instability studies, threshold for SEY, dynamic aperture tune shift … CMAD [M. P.] Single-bunch instability preliminary studies ongoing. Electron cloud build-up (SEY, vacuum chamber, etc.) to be added. ns=0.067 e- density 1e10 e/m3 macrop=100000 ILC DR MAD deck to track beam with an electron cloud at each element of the ILC DR. First results: 2 synchrotron oscillation periods (9min * 320 CPUs / turn) CMAD tracking, ILC DR beam at extraction, with average cloud density 1e10 e/m3 (below threshold). Bottleneck => in ILC DR, beam aspect ratio reaches sx/sy=200, demanding Particle in Cell grid ratios num-gridx >> num-gridy, to correctly simulate Electric field.

Motivations and solutions summary e-cloud observed at SPS and PS (CERN), PEP-II, KEKB, Dafne, CESR concern for: ILC DR & CLIC, LHC, LHC+, SPS with PS2, KEKB, Dafne best approach: avoid e-cloud build up technological solutions: - NEG non-evaporable getter coating (SPS, LHC 6km warm sections, RHIC, PEP-II, KEKB) - TiN coating (Daphne wigglers, PEP-II, KEKB) - grooves (PEP-II, SPS, CESR) - “conventional” clearing electrodes (PEP-II, KEKB, DAFNE(?!), SPS) - novel enamel clearing electrode (clearing electrode based on double layer of enamel coating, SPS) slotted surface shielding beam fields (CERN) air baking techniques (SPS, SLAC)

Global R&D program Ongoing: At KEKB Secondary electron yield (SEY) in situ, ante-chamber and thin films coatings TiN and NEG. Planning: clearing electrodes tests planned at KEKB in a wiggler magnet section At SLAC Conditioning and SEY of TiN and NEG samples in PEP-II beam line, groove chambers. Planning: clearing electrodes and triangular grooves in bends with parameters close to ILC DR. Planned: At CERN: concern for the SPS and PS as LHC pre/injectors. Planning: several mitigation techniques are under evaluation for the SPS and PS: increase chromaticity, scrubbing runs, smaller radii chambers, NEG coating, grooved surfaces, air baking and slots. Clearing electrodes on enamel substrate. In Daphne, limitation on maximum positron current. Suspected electron cloud. Al chambers: Planning: TiN film coatings in the wiggler Al chambers. (excluded by now clearing electrodes) Cornell CesrTA: > FY08, Electron cloud in wiggler sections with ILC DR parameters. Ultra-low emittancies. Fast Beam Ion instability.

Thanks ! To the contributors to this presentation M. Palmer (Cornell), S. De Santis (LBNL) F. Willeke (DESY), K. Suetsugu (KEK), K. Bane, P. Raimondi, L. Wang (SLAC), F. Zimmermann (CERN) and to DR collaborators D. Arnett, G. Collet, R. Kirby, N. Kurita, B. Mckee, M. Morrison, P. Raimondi, T. Raubenheimer, J. Seeman, L. Wang, G. Stupakov (SLAC), D. Rubin, D. Rice, L. Schachter, J. Codner, E. Tanke, J. Crittenden (Cornell), J. Gao (HIPEP), A. Markovic et al. (Rostock Univ.), M. Zisman, S. De Santis, C. Celata, M. Furman, J.L. Vay (LBNL), K. Ohmi, Y. Suetsugu (KEK), F. Willeke, R. Wanzenberg (DESY), J.M. Laurent, A. Rossi, E. Benedetto, F. Zimmermann, G. Rumolo, J.M. Jimenez, J-P. Delahaye (CERN), A. Wolski (Cockroft Uniiv.), B. Macek (LANL), C. Vaccarezza, S. Guiducci, R. Cimino (Frascati), et many other colleagues…

International Linear Collider R&D on electron cloud (SLAC) M. Pivi, T. Raubenheimer, J. Seeman, T. Markiewicz, R. Kirby, F. King, B. McKee, M. Munro, D. Hoffman, G. Collet, L. Wang, A. Krasnykh, D. Arnett, (SLAC) M. Venturini, M. Furman, D. Plate (LBNL), D. Alesini (LNF Frascati) R. Macek (LANL) 19 March 2007