Nuclear Renaissance Challenges for Indian Industry

Slides:



Advertisements
Similar presentations
Milton Caplan Dr. Terry Thompson PBNC Vancouver, August, 2014 NEW NUCLEAR PLANT DEVELOPMENT - BALANCING LOCALIZATION WITH COMPETITIVENESS.
Advertisements

UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
India’s nuclear technology export future 1 Panel on Emerging Nuclear Powers September Presenter: S L Rao.
ASME Nuclear Conformity Assessment
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
2015/06/091 Overview of Maintenance & Infrastructure Delivery of Eskom Overview of Maintenance & Infrastructure Delivery of Eskom Eng Logan Pillay Eskom.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
MODULE “STRATEGY DEVELOPMENT”
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
International Relations (13) Korean Nuclear Power/Weapons 김 병 구
The Nuclear Renaissance Dr. Charles K. Ebinger Director, Energy Security Initiative Brookings.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
Tom MAZOUR IAEA, Division of Nuclear Power
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Important informations
Bill Harrison Cleveland - Akron Chapters Joint Meeting March 16, 2009.
1 BULATOM - New Build prospects in the UK New Build prospects in the UK International Nuclear Forum Bulgarian Nuclear Energy – National, Regional and World.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
11 International Cooperation in the Nuclear Fuel Market as a factor of increasing the Security of Supply Moscow, 2009.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
7 th Nuclear Energy Conclave rd November, New Delhi Strategies for competitive value addition for setting up Nuclear Power Projects.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Responsibilities of Sponsor, Investigator and Monitor
Nuclear Power Economics and Project Structuring 2017 Edition
Nuclear Power Group Members:
DDG Nuclear Energy: Mr Zizamele Mbambo
Innovation Development Strategy
Uniper Energy Services
Responsibilities of Sponsor, Investigator and Monitor
PRIVATISATION OF NUCLEAR POWER TATA CONSULTING ENGINEERS, Mumbai
Damitha Kumarasinghe Director General
ISO/IEC
MECHANICAL PARTS FROM INDIA: Low Cost & Safe Procurement
Operations Management
János Krutzler Hungarian Atomic Energy Authority
Setting up Enterprise End Next.
SESSION 3 Policy Framework
Third Party Activities for FH1 Project
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Procurement’s Impact on Logistics.
ETPRES MISSION Conducted: in Jakarta, June 2012
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
GFSI Certification What Top Management Needs to Know
New Reactor Projects as Training Opportunities
Regulatory Control Training Workshop
Evolution of nuclear power plant vendor offerings
خودروهاي گازسوز آسيا و اقيانوسيه
Transfer of Medical Devices Manufacturing Technology
Legal and Regulatory Framework for Nuclear Installations in IRAN
UNIT 1 B ROLE OF ENTREPRENEUR.
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
NS4960 Spring Term 2018 China: Nuclear Expansion Issues
Advancing the Development Of Nuclear Power In China
Access, Environmental and Economic aspects of Nuclear Energy
A Canadian Perspective
Presentation transcript:

Nuclear Renaissance Challenges for Indian Industry Date: 20 March, 2010

Cause of Nuclear Renaissance Green Energy requirement to save environment of planet Cost of conventional oil/coal fuel will sky rocket in time to come After TMI & Chernobyl disasters, world realized that disaster as imagined did not occur and Reactor Design, Engineering, build, operating technologies have improved considerably thus improving safety. Exclusion zone of 5 Km is no longer required. Highly radioactive waste management techniques improved and cost reduced. New techniques like mutation will reduce very long half life of fission products to manageable half life. 2 2 2 2

Cause of Nuclear Renaissance ……. Contd Possibilities of Fusion Technology through ITER, possibility of large scale Hydrogen production through HTR has opened new avenues of clean energy. Reactor sizes have gone up and getting standardized to around 1650 MWe bringing in economy. In India Nuclear Renaissance has been brought with Government signing INDO-US Nuclear Deal, NSG & IAEA agreement to open up doors for foreign nuclear power to come to India. 3 3 3 3

Who all are interested in Nuclear Power ? USA: After TMI, USA had stopped setting up NPP. Public opinion now has changed and USA is setting up NPPs. India & China – have set up targets in GWs of power to meet their very fast growing energy needs. Developed & developing countries have also decided to go ahead in setting up NPP with plant sizes suitable to their requirement and grid size. 4 4 4 4

Who all are Suppliers ? Developed Countries: France, USA, Russia are self sufficient with technologies and supplies Developing Countries – India & China – Have their own indigenous products but to meet fast growing demand, they want to import technology and supplies. Smaller Nations – Want to import technologies, plants & operate. 5 5 5 5

Indian Industries – Business Potential Indian Market Design, Engineering, Fabrication of Equipment & Component Modules, Construction 63 GWe Power ------ Business Opportunity of Rs. 500,000 Crores. Maintenance Replacement of Equipment, supply of parts Front End & rear end of fuel management cycles Components for Elements Reprocessing plants – Design, Engineering & Construction Spares Foreign NPP Suppliers want to get supplies from country where NPP being set up to reduce costs. 6 6 6 6

Challenges of Government Political Inter Governmental Agreements (IGA) Guarantees of Supplies Limit to public liability, Insurance Strategic/Non Strategic Nuclear facilities Funds Public Opinions permission to private utility owners Incentives 7 7 7 7

Challenges for Industry Utility owners ( NPCIL, BHAVINI ), NPP Suppliers, Industry undertaking supplies of materials, equipment, construction etc have following challenges: Meeting Country’s Regulatory Authority Requirements To ensure safety by design, construction and operation Obtain permission in time by submission of documents Set up on site organization for dealing with disasters Proven Design & Engineering Knowledge and Experience in Nuclear codes like ASME, RCC & GOST Analytical capability as per code requirements, safety related to design basis accidents, beyond design basis accidents. Approvals by suitable Regulatory Authorities, Design Safety Review Committees 8 8 8 8

Challenges for Industry ……Contd Fabrication Adherence to quality as per Nuclear Codes Availability of N, NPT stamps to assure and NDT, Test faculties to prove quality of product Ability to procure quality materials as per standards. Fabrication tools, Faculties, Manpower to produce quality product Suitable workshop to handle heavy fabrication (sea shore facility), smaller intricate components. Reasonable Cost Timely Delivery Construction Fabrication of Modules Construction Equipment, Resources to meet rate and quality Trained Manpower NDT Equipment Facilities Management System Tools & Authority Funds 9 9 9 9

Challenges for Industry ……Contd Operation & Maintenance Trained Manpower Regulatory Authorities Proper procedures, safe guards Planned & Preventive maintenance measures Ability to deal with failures, deficiencies, organization & resources to deal with on site/off site disaster management Foreign Tie ups/TOT, Supply Chain Management Schemes Reprocessing – (Government) Design, Engineering, Construction of Plants Strategic & non strategic safety Material Management – Before & after processing Waste Management 10 10 10 10

Challenges for Industry ……Contd Funding Large Investment Returns have to be attractive Capital cost to be low Power Generation, distribution cost to be low. 11 11 11 11

Challenges in general 1. Any plant in the world getting into safety related problem will have effect on all plants and industry in the world. Hence quality of work and safety is every body’s responsibility 2. Life time supply of fuel and claim on reprocessed fuel will dictate future of Nuclear Industry. 3. Non availability of fuel after some time will force search for new fuels and reactors. 4. Environment control will force people to learn to live with less power and progress will be measured with the yard stick of lesser consumption of power. 5. Renewable Energy could become competitor to nuclear power. 6. If India plays its cards properly, India will become major source for expert manpower, supplies 12 12 12 12

Initiatives need to be taken up by Industry. Based on strength, vision identify areas of work and focus on weaknesses to improve Induct expert manpower in areas identified and improve quality of existing manpower Attempt to get certification from accredited organizations such as ASME and certifications such as N, NPT stamps etc to be able to be part of global supply chain management. This would automatically bring in approved work procedures, QA discipline, reduce rework / rejections and increase acceptability Set up raw material supply chain management for critical materials to ensure quality, timely supply and cost Work out new capabilities, facilities required to meet set targets/goals of work and ensure timely availability Go through set procedures of supply chain management capability assessments by the companies planning to resource materials, equipments, fabrications, EPC requirements and ensure acceptance by them Educate manpower in various national & international nuclear standards such as ASME, RCC, GOST etc especially in design, material, QA, installation requirements to assure QA of the product and timely delivery. Expose personnel to seminars, formal courses to upgrade their capabilities. Work on Public-Private Partnership projects, arrange collaborative arrangements with companies in business to get into larger, better business areas. Identify Indian capable partners to enable better quality product to the customer.

WIL Initiatives Setting up of Walchand Technology Center at Pune to undertake Design, Engineering of Systems, equipment using ASME Section III, Class I and other sections to get highest quality products. Design tools inducted and engineers trained to use them. Expert associates tied up. Inducted qualified trained manpower and further trained them in Nuclear Technologies N & NPT Stamp procedures are in progress and award expected shortly. Land acquired at Dahej for setting up large workshop to undertake fabrication of 1000 / 1650 MWe PWR and 700 MWe PHWR components. Setting up services in progress. Acceptance of Qualification for global supply chain from ATOMSTROYEXPORT, AREVA, WESTINGHOUSE, DCNS, EDF, AECL, DOOSAN. ATOMENERGOMASH visiting shortly. Expert associates in around PUNE, MUMBAI tied up to give better product to customer.

15 15 15

Proposed Layout of the Workshop 16 16 16

Thank You ! 17 17 17 17