Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.

Slides:



Advertisements
Similar presentations
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Advertisements

Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Copyright Houmoller Consulting © Introduction In the appendix, you’ll find a list of the terms and acronyms used in this PowerPoint presentation. This.
Nord Pool Spot and Europe
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
BALTIC ELECTRICITY MARKET MINIFORA Riga 3 July 2006 Transmission and connection to the grids Dace Bite Public Utilities Commission.
BritNed Investing in interconnection capacity Damian Bach France-UK-Ireland Stakeholder Group meeting 4 th July 2008, Sellindge, Kent.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
1 Market coupling Commission de Régulation de l’Electricité et du Gaz Fonctionnement Technique des Marchés September 2010 Common CSE – CWE RCC Meeting.
Agenda Pag. 1 I.4M MC – Common parts II.Further Information on Romanian Market 1.Regulation for DAM organization and functioning with respect to price.
Market coupling for Baltic Cable Paul Giesbertz 5 th Stakeholder Group Meeting Northern Europe ERI 26 May 2010, Copenhagen.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
29th November 2016 Teleconference
Power market structure and market price development in the SEE region
Congestion Management
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Public Consultation : main conclusions (1/2)
GSR022: Review of Security and Economy Required Transfer Conditions
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
SWE Day- Ahead market coupling
Coordinated Market Coupling for GB
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Draft for factual comments, suggestions on overlaps welcome.
Overview All NEMO and all TSOs methodologies
Feedback on the SWE coupling Public Consultation
ETSO Comments on the draft Congestion Management Guidelines
Regulators’ update on Congestion Management and Balancing
IG meeting, December 5th, 2012, DERA premises, Copenhagen
Grid Code Development Forum – 6 September 2017
NWE Cross Border Intraday
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Imbalance Netting Platform
efficient capacity allocation method
24rd SG meeting 8th february 2018
Intraday cross border continuous market and optional Intraday auctions
29th November 2016 Teleconference
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
Incentives for electricity infrastructure – ERGEG view
Intraday cross border continuous market and optional Intraday auctions
Update developments in Core CCR
Update developments in Core CCR
RR Platform – Implementation Framework
Presentation transcript:

Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012

EMCC proposal - compensation of grid losses Overview Background Grid losses EMCC proposal - compensation of grid losses Impact of loss functionality - prices, flows, grid usage Recent developments Discussion 2

Background (I) Baltic Cable transmission capacity is implicitly allocated through EMCC in the ITVC. Baltic Cable’s contract with EMCC: EMCC to implement minimum flow, maximum change, loss minimization by 1st Jan. 2011. EI, BNetzA, EMCC, Baltic Cable started discussions on the issues end 2010/early 2011. NE RI discussed losses issue during 2011 and drafted discussion paper (but not finalised?). July 2012: Baltic Cable again approached EI and BNetzA as regards a loss functionality.

Background (II) August 2011: Baltic Cable, BritNed and IFA submitted a paper to NWE TSOs on requirements. According to cable owners, TSOs concluded inclusion of losses increases welfare should be dealt with by including the losses in the balancing constraint approach already available in PCR algorithm. TSOs indicated that regulatory approval will be needed before actual implementation. March 2012: These cable owners (now including Moyle and EirGrid) approached Ofgem and BNetzA.

Grid losses Grid losses are a physical reality of HVDC and AC grids. HVDC losses can be directly attributed to commercial trades TSOs/cable owners have to balance losses  incur cost Commercial cable owners’ problem is this: if they use cable like TSOs, loss is incurred during hours, where congestion rent is smaller than cost of grid loss As these costs occur they are part of the overall welfare. However, in current Market Coupling settings grid losses are not included in the social welfare optimization process. Any functionality to cover grid losses could/should (?) be applied regardless of ownership type (TSO/cable owner). Compatibility with EU Regulation 714/2009?

EMCC proposal (I) 2011 Baltic Cable and NorNed asked EMCC to develop a grid loss compensation mechanism. EMCC developed a concept which fulfils criteria of welfare optimisation and covering of losses. The concept focuses on HVDC links NorNed, Kontek and Baltic Cable. It can be introduced without changes to systems other than EMCC’s (no PX or TSO systems), unless interconnectors within Nordic. Minimum flow constraint could be implemented.

EMCC proposal (II) Physical losses are reflected in the coupling system by placing different volumes of buy and sell orders at NPS, EPEX and APX: Qimp < Qexp (Import smaller than Export; Export not larger than max. ATC) Qimp = Qexp x LF (LF = Loss factor; e.g. Kontek 2,5% losses: LF = 0,975) Welfare optimization: Pimp x Qimp = Pexp x Qexp Pexp = LF x Pimp

EMCC proposal (III) After Market Coupling process: EMCC could e.g. split the bought volume into loss energy and flow energy. Loss energy could be sent per separate schedule to balance group for TSO/cable owners purposes. Cross-border flow sent per schedules as today. EMCC could publish either import or export value on its website. LF constraint could be configured for any interconnector. LF could be used for AC links (e.g. DK1-GER) too.

EMCC proposal (IV) Example: Losses: 5 %; ATC: 100 MW Case 1: Result of Market Coupling without loss functionality Market A: PA = 98 €/MWh; Market B: PB = 98 €/MWh Congestion rent (CR) = 0 Cost for losses (GL): 0,5 MWh x 98 €/MWh = 49 €/MWh Net Income: NI = CR – GL = - 49 €/MWh Case 2: Result of Market Coupling with loss functionality Market A: PA = 100 €/MWh; Market B: PB = 95 €/MWh Sell order Market A: 9,5 MWh Buy order Market B: 100 MWh Congestion rent (CR): 5 €/MWh x 9,5 MWh = 47,5 € Cost for losses (GL): 0,5 MWh x 95 €/MWh = 47,5 € Net income: NI = CR – GL = 0 Note: To get the full picture consumer and producer rents would need to be calculated as well.

Impact of loss functionality (I) Prices of coupled areas will differ by LF, if line not fully used differ by more than LF, if line fully used be equal only if there is no flow on the line Average price spreads will increase (slightly) Flow on the interconnector with LF starts, if price difference is larger than LF be zero, if price spread is smaller than LF will never lead to equal prices

Impact of loss functionality (II) Algorithm prioritizes flows on interconnectors without or with small loss factors. The system tends to shift from interconnectors with higher LF to those with lower LF. Number of (small) adverse flows will decease Single trader’s point of view Situations can occur in which offers are implausibly rejected. Change in social welfare distribution: Shift of consumer and producer rent to congestion rent and grid losses.

Impact of loss functionality (III) New intraday trading opportunities for cable owners In case the market changes intraday (smaller price difference), inclusion of LF in day-ahead may open new trading opportunities intraday. Cable owners can make extra profits intraday by countertrading actions, thereby also reducing grid losses and physical flows on the cable.

Recent developments (I) EMCC commissioned scientific report (IAEW, RWTH), which recommends introduction of grid loss compensation factor. EMCC has tested all systems and recommends introduction provided regulatory support. No changes in PX systems necessary if only losses on NorNed, Kontek, and Baltic Cable are included. Change in Sesam (NPS) necessary if losses between Nordic countries should be considered. EMCC could introduce new system within short time period. Baltic Cable aims to implement the loss functionality by 30 September 2012 Deadline for Regulatory intervention set Aug. 31st

Recent developments (II) ENTSO-E Algorithm Starting Point Assessment Report: Losses requirement available in PCR but not operational Flow ramping constraints available in PCR Minimum stable flow not developed for COSMOS so far LF need to be determined properly In case, communication to the market is important!

Discussion Open issues: Is the proposal in line with EU Regulation 714/2009? Should loss factors of AC interconnectors be included? Is (EU-wide) coordination and/or harmonization useful or necessary? Are there any frictions with other market segments (long-term, intraday)? Any other thoughts?

Thank you for your attention! 16