High power test results of X-band deflecting cavity

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
RF-Gun cavity for high charge electron generation Takuya Natsui.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
TD24 R05 N1 after high-power test analysis plans A. Degiovanni, M. Aicheler, N. Mouriz Irazabal, A.T. Perez Fontenla, R. Wegner CLIC RF Structure Development.
Low Emittance RF Gun Developments for PAL-XFEL
June 2007, CERN. HDS 60 (cells) copper was processed from both sides Low Vg a/λ=0.16 High Vg a/λ=0.19 HDS 11 titanium Very often we do observe, that after.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
X-Band Deflectors Development at SLAC
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Deflecting structures development for XFEL and PITZ TDS Valentin Paramonov, INR, Moscow on behalf joint group L. Kravchuk 1, A.Anisimov 3, D. Denisenko.
Test Accelerating Structures Designs, Objectives and Critical Issues
Wake-fields simulations and Test Structure
High efficiency work and MBK development for accelerators
Abstract EuSPARC and EuPRAXIA projects
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Optimisation of single bunch linac for FERMI upgrade
NC Accelerator Structures
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
Summary of the test structure design
Shuji Matsumoto Accelerator Lab., KEK
CEPC injector high field S-band accelerating structure design and R&D
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Bunch Separation with RF Deflectors
Few Slides from RF Deflector Developments and Applications at SLAC
CEPC RF Power Sources System
A Study of RF breakdown of Narrow Wave Guide
5th X-Band Structure Collaboration Meeting
CLIC Feasibility Demonstration at CTF3
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Presentation transcript:

High power test results of X-band deflecting cavity Jianhao Tan, Wencheng Fang, Qiang Gu, Zhentang Zhao, SINAP Toshiyasu Higo, KEK June. 15, 2017, Valencia

Outline Background Brief introduction of deflector Conditioning history Breakdown position analysis results Summary

SXFEL Test facility linac layout X-band

X-Band TDS layout for SXFEL User Facility Oil tank   LLRF A/D Feedback, Feedforward Set point …… D/A SSA 23MW,0.5us load Load 50MW, 100ns 11424MHz Specification of SXFEL user facility: Energy:1500MeV Bunch length:76um(RMS) Beam size:36um Install space:<1.3 m Resolution:20fs Deflecting voltage:30MV Input power: 20MW 3 dB splitter 0.6m 0.6m

Demand of X-Band TDS 1. For now, three RF units of x-band deflecting structures have been confirmed, including 6 deflecting structures, each is 60 cm long. 2. As diagnostic tool and RF kicker, at least 5 units normal conducting x-band deflecting structures will used on HXFEL (hard x-ray free electron lasers), 1 meter long for each structure.

Preliminary design of cell shape Working mode Two caved-ins on cell ID surfaces Non-working mode Working mode Non-working mode Two holes (LOLA Structures) Scheme 1:Cave type Scheme 2:Hole type

Optimization of Regular Cells a (a/b) (mm) Group velocity (%c) Transverse shut impedance (MΩ/m) Quality factor Attenuation factor (1/m) 5.5(0.37) -2.46 38.35 6662 0.730 5.2(0.35) -2.98 42.24 6622 0.606 5.0(0.34) -3.17 46.04 6778 0.564 4.5(0.30) -3.18 54.09 6924 0.543 4.0(0.26) -2.62 61.53 7072 0.646 3.5(0.23) -2.02 68.81 7821 0.757 Structure type Constant impedance Operating frequency 11.424GHz Operating mode Disk-loaded waveguide 2pi/3 Total length L 0.3 m Resolution 20fs Deflecting voltage 10MV Input power 30 MW Group velocity Vg -2.62%c Filling time tF 23 ns t (mm) Transverse shut impedance(MΩ/m) Group velocity(%c) Q value Attenuation factor(1/m) 2.2 45.62 3.17 6345 0.595 2.0 49.07 6778 0.557 1.8 50.31 3.16 6965 0.544

Fabrication of cells and couplers Cave With caves on outside wall of the cups to fix the direction. Box with regular cup Cover Box The machining model of couplers, with box and cover, and an regular cup attached to the coupler box.

Field measurement and tuning results The cage, with several metal wires surrounded on the carrier which could be scrip or Teflon, the performance affected by Diameter(D) Length(L) metal diameter(b) and Number(N)

Nextef A Control Installation on SHIELD-A Shield A RF source for A SINAP_DEF Control Layout of Deflector Shield A A

Conditioning history

Operation Plan 4 stages operation 4, April, 2016 30, June, 2016 Power Pulse width 91 ns 50 MW 2nd 3rd 4th 40 MW 45 MW 35 MW 1st 51 ns 132 ns 173 ns 4, April, 2016 30, June, 2016 Totally conditioning time: nearly three months, but take the holidays and maintain days out, left 8 weeks to test deflector. (Test of TD24R#05 begin July 2016) The first x-band structure design, fabrication, brazing and test, so we want to test more pulse width, and get more breakdowns information at different width, feed back to the design and technology of fabrication and brazing. Start from 51ns, final target power is 50MW @173ns. Due to the limit of conditioning time, and worried about lots of time will used on higher power and longer pulse width, so the conditioning process operated as we planed. Power up to nearly 45 MW, lots of breakdowns prevent power increase. Lots of problems, not bad things.

Conditioning history For accelerating structures For deflecting structure 𝐸 𝑑𝑒𝑓 30 . 𝑡 𝑝 5 𝐵𝐷𝑅 =𝑐𝑜𝑛𝑠𝑡 𝐸 𝑑𝑒𝑓 = 𝑉 𝑑𝑒𝑓 𝐿

RF Conditioning Results @ 51ns Operation start from 14 April @51ns Two weeks running, reach to power 30MW. On the condition of this power level, meet the requirement of bunch length measurement. BDR evaluation continue two days running.

BDR Evaluation Results @ 51ns 33MW 30MW Over 35 hours running, 8 breakdowns record at 30 MW. 1.2*e-6 breakdowns per pulse. 11 breakdowns record during 13 hours at 33MW. 4.7*e-6 breakdowns per pulse.

RF Conditioning Results @ 91ns Operation start from 9 May @ 91ns Power target set 40MW 6~7 days increase power up to 40MW, no breakdown rate evaluation

BDR Evaluation @ 132ns Run#16 analysis results Power keep at 38MW 12 hours 25 breakdowns Threshold program error Run#16 analysis results Power keep at 38MW 78 Acc-BD record over 62 hours, 1.25 breakdowns happen per hour,7.99*e-6 breakdowns per pulse About several hours conditioning at 40MW

BDR Evaluation @ 173ns Run#24 analysis results Power keep at 43MW @173ns 20 breakdowns record during 1215 minutes, about 20 hours BDR= 5.49 *e -6

BDR Evaluation @ 173ns Run#25 analysis results Power keep at 41MW @173ns 25 breakdowns record during 2678 minutes, about 45 hours BDR= 3.11 *e -6

Breakdown Position Analysis Results

BD position Analysis program-Deflector KEK program Instead of deflector parameters 𝐹 𝑧 = 2𝑧 𝑉𝑔 − 𝐿 𝑉𝑔 ---> z= 𝐹 𝑧 𝑉𝑔+𝐿 2 𝐹 𝑧 =∆𝑅𝑠−∆𝑇𝑟− 𝑇 𝑓𝑖𝑙𝑙 ---> z= (∆𝑅𝑠−∆𝑇𝑟− 𝑇 𝑓𝑖𝑙𝑙 )𝑉𝑔+𝐿 2 ---> z= (∆𝑅𝑠−∆𝑇𝑟− 𝑇 𝑓𝑖𝑙𝑙 )𝑉𝑔+𝐿 2 𝐹 𝑧 = 0 𝑧 𝑑𝑧 𝑣 𝑔 − 𝑧 𝐿 𝑑𝑧 𝑣 𝑔 𝑇 𝑓𝑖𝑙𝑙 = 𝐿 𝑉𝑔 ---> z= (∆𝑅𝑠−∆𝑇𝑟)𝑉𝑔 2

Breakdown Position Analysis Results Different pulse width operation have the same trend, all have two “hot spot” in the up and downstream; Divide the structure into three parts, middle parts, upstream parts and downstream parts. In the middle parts, the number of breakdown almost the same each cell. A few of breakdowns out of range of structure, accuracy of the breakdown position from program is not enough, need more analysis. Lots of breakdowns happen in the upstream and downstream of the structure, not reasonable.

Breakdown Position Analysis Results 132ns Running Run#10 Take 132ns running as an example Run#17 Population of breakdown cell as processing ▽ △◇ □○ Lots of breakdowns in upstream cells Further processing, appeared breakdowns in the downstream Suspected that the breakdowns resulted by leaking of alloy into the structure

Cutoff analysis-cut view Disk Coupler aperture Location of leaking @ first brazing Cutting view of deflector, and made several samples to observe in the optical microscope and SEM; The dirty things in the cavities, they are not caused by breakdown. Liquid with acid to clean the cavity after wire-cutting

Image under optical microscope Results under optical microscope Image under optical microscope, it is obvious that the positions in the upstream and downstream where breakdown frequently are concentrated in the coupler aperture. More analysis will carry out in scanning electron microscope. coupler Damaged heavily Input side Disks from upstream and downstream Output side

Test results to design 1mm The test results show that the frequently breakdown in the coupler prevent the higher power running. Optimization of coupler will used on new deflector design.

Summary The first prototype of x-band deflecting structure has been finished, including design, fabrication, brazing, test, tuning and high power test…… Have found some problems of fabrication and brazing, analysis about BD position, such as cut structure to halves have done and the analysis results basically reflected the problem of design. Optimization of coupler will used on new deflector design.

Thank you!!!

Acknowledgement Many thanks to… T. Higo, S. Matsumoto, T. Abe, A. Karube, A. Asai, Kawaba, Y. Arakida, T. Takatomi, P. Matsui, X. Wu… and many other members of KEK contribute to SINAP Deflector test.