Desk Based Preconstruction – Planning

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Managing the Health and Safety of Contractors
Construction (Design and Management) Regulations 2007
CDM 2015 Key Changes and Duty-Holder Responsibilities
Risk Assessment.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Utilities Working on the Network Health & Safety Requirements.
Construction Phase Health and Safety Plan By John Johnston AIIRSM Health and Safety for Beginners
The Pre-Tender Stage Health and Safety Plan By John Johnston AIIRSM Health and Safety for Beginners
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
UK’s CDM Regulations 2007 and its Applications in Singapore
Risk Assessment – An Essential Standard
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
RISK ASSESSMENT. What is Risk Assessment? It is an examination of what we do, to determine the things that can cause harm to people It allows us to decide.
WELCOME TO THE INDUCTION TRAINING PROGRAM.  Reasons for Safety  History/Legislation  Responsibilities - Employee/Employer  Safety Policy  Accidents.
Health and Safety Policy
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
UNIT 27: UNDERSTANDING HEALTH AND SAFETY IN THE BUSINESS WORKPLACE
How to write a risk assessment
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
Construction Site Induction A guide to “HOW TO” “HOW TO” by Coldrop.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Planning the Project Unit 1 – Lesson 12.
Health & Safety at Work Act 1974
Administrative Practices Outcome 1
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Health and Safety Policy
Learning aim B: Explore how sub-structures are constructed
Planning and Organising Two Introduction to Construction Methodology
HSE Update Lisa Skinner HM Inspector of Health & Safety
Unit 1 Health and Safety in the Engineering Workplace
Site Based Preconstruction – Site Set Up
January 2009 Update Site Waste Management Plans
Safe Work Method Statements
Temporary Works Co-ordination
Technical Brief: Part 4 Task Briefing Sheet (TBS)
Design Risk Management Spotlight on CDM 2015
Presentation Title: View > Header & Footer
Technical Brief: Part 3 Work Package Plan (WPP)
PCIP Preparation.
The Construction (Design and Management) Regulations 2015
RISK ASSESSMENT AND METHOD STATEMENT
OHS–Occupational Health & Safety
STFC Safety, Health and Environment (SHE) Codes
Signage 2/22/2019.
Legal and Organisation requirements for data recording
Risk Assessment – Space Only Stands
Workshop commissioning Installation Coordination at ESS
Planning and Organising Two Introduction to Construction Methodology
Health and Safety Induction for Managers
Effective Construction Safety Management
Frank Power Ergonomist (Inspector) Health and Safety Authority
Client duties on CDM Regulation 2015
Presentation transcript:

Desk Based Preconstruction – Planning Oops. How could this have been avoided?

Scaled Site Layout Plan Scaled Site Plans will be drawn up prior to the build and will show: location of access routes, Temporary roads. Accommodation Materials storage Welfare facilities for staff. Fixed plant equipment – Cement Silo’s, Generators etc Fire precaution measures

Programme of works A programme of works will be compiled which will detail every aspect of the build. This will give a clear timeline for all actions that need to be undertaken and how long they will take. The Project Manager will coordinate the build using this plan. Resources will be purchased – building materials, plant equipment etc Safety signs erected. Statutory notices to inform the public of road closures, footpath Closures. Road temporary road crossings and traffic management.

Legal Requirements Construction involves a lot of legal work before any building can start. The following are produced in the preconstruction phase. A Construction health and Safety Planfile:///C:/Users/pm/Downloads/10278.PDF See an actual H&S Plan The construction phase plan is prepared by the principal contractor, for notifiable projects, to outline the arrangements for managing health and safety on site during construction work. The health and safety file is prepared or revised by the CDM co-ordinator, for notifiable projects. Risk Assessments A risk assessment is a systematic examination of a task, job or process that you carry out at work for the purpose of; Identifying the significant hazards that are present (a hazard is something that has the potential to cause someone harm or ill health). http://www.hse.gov.uk/risk/controlling-risks.htm

Method Statements A work method statement, sometimes called a "safe system of work", is a document that details the way a work task or process is to be completed. The method statement should outline the hazards involved and include a step by step guide on how to do the job safely. Informing the Health and Safety executive (HSE) http://www.hse.gov.uk/ Find out what the HSE is and what it does.

1. Explain the importance of a Scaled Site plan in construction. 2. Explain the purpose of a programme of works. 3. Explain the legal requirements to be considered during construction.