Comprehensive Sewer Planning Update Meeting

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Project Background and Objectives
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
2009 City of Bozeman Storm Water Update
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
STORMWATER MANAGEMENT PROGRAM UPDATE July 23, 2014.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Water Quality Management Plan Update Board of Directors March 25, 2009.
Delon Hampton and Associates, Chartered EPMC 3B Joint-Use Facilities Capital Cost Allocation Study Presented to Environmental Quality & Operations Committee.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Flooding. A Spring Green Community Forum Flooding in Spring Green: A Community Forum We have listened very closely to your concerns, questions and issues.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Effectiveness of Private Property Infiltration and Inflow Reduction efforts in East Tosa October 14, 2014: Wauwatosa Budget and Finance Committee Meeting.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
Comprehensive Sewer Planning Update Meeting M. Chris Swartz, Village Manager Mustafa Emir, Village Engineer March 23, 2015.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Presented by Kelsey Lang, Planning Associate June 27, 2016
Welcome to the Libertyville Stormwater Master Plan Open House
Municipal Separate Storm Sewer System (MS4) Permit
Update on PI Modeling and Nitrogen Removal at Blue Plains
Sewer System Presentation
SPU Modeling & Monitoring
Manchester’s CSO Program: A Look Behind and a Look Ahead
City of Appleton Stormwater Management Update Presented to the
GATEWAY DRAINAGE SYSTEM 2017 WET SEASON/IRMA OVERVIEW
WEST & EAST DISTRICT PROJECTS PRESENTATION
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Springbrook Estates Sewer Improvement Area Informational Meeting
Town of Melbourne Beach
Babcock Basin-Design Phase
Total Maximum Daily Load Program
Kentucky Lead Workgroup Recommendations
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
[OUR CITY NAME]’S OLD SEWERS
OUR CITY’S PLUMBING PROBLEM
MS4 OVERVIEW 2015.
Joint City Council / Planning Commission
Fixing Our City’s Old Sewers
Status of Romanian Pilot Study
“Balancing Gray and Green Infrastructure”
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

Comprehensive Sewer Planning Update Meeting Leeann Butschlick, Director of Public Works Mustafa Emir, Village Engineer June 5, 2017

Tonight’s Agenda Recap of 2011 Comprehensive Facility Plan Summary of Combined Area Studies by Shorewood Summary of MMSD Initiatives in the Combined Area

Facility Plan Goals GOAL 1 - Provide basement back-up protection for 2 inches of rain in 1 hour throughout the Village by 2015 GOAL 2 - Reduce Inflow and Infiltration (I&I) in separated area by 40% by 2035 and 80% long-term, for back-up protection for 4 inches of rain in 1 hour GOAL 3 - Separation of the sanitary and storm sewer in the combined area will be completed by 2035, resulting back-up protection against a minimum of 4 inches per 1 hour in this area GOAL 4 - Reduce street flooding throughout the Village to provide a minimum of 2 feet freeboard during 3 inch per hour rainfall by 2020.

Sewer Planning Recap July ‘10 Nearly1,000 homes damaged from flooding and basement back-ups caused by July 15 and July 22 storms. August ‘10 Four public meetings Village made sewers a “top priority” Performance Goals Established. Village staff began developing “Comprehensive Sanitary Sewer, Stormwater and Drainage Facility Plan” Sept. ‘10 – Feb. ‘11 Village completes a full study of Village’s sewers; problems and solutions identified; initial plan was drafted Six public update meetings Village pre-qualified four firms for plan review and Pre-Design Memoranda

Sewer Planning Recap… March ‘11 – May ‘11 Four firms reviewed the plan and developed Pre-Design Memoranda. The plan was revised to include recommendations from Pre-Design Memoranda. May ’11 Village Board approved the plan Four firms were hired to complete design and engineering for sewer projects June ‘11 Village approves contract modifications to incorporate sewer improvements into 2011 Downer Avenue road project July ’11 Surveys sent out to all Shorewood property owners to gauge support for a proposed funding plan for sewer projects Sept. ’11 Village receives survey results from UW-Milwaukee Center for Urban Initiatives and Research Feb ‘11 – Nov “11 3 Public Meetings and Village Board updates in February, April, and November

Sewer Planning Recap… 2012 Basin 1 and 6 Sewer Improvement Design Basin 1 and 6 Sewer Improvement Construction 2014 Phase II(a) of Basin 6 sewer improvement construction Separation of Basin 6 from Whitefish Bay Continued refinement of Facility Plan recommendations for Combined Sewer Service Area Update provided to Village Board in August MMSD Evaluation of Combined Sewer Alternatives completed in November (consultant: CDM/Smith) 2015 Independent Cost estimates that compare Combined Service Area alternatives (consultant: Concord Group) Update presented to Village Board in March 2015 2016 Study on Environmental Impacts of the new Storm Sewer outlet to Milwaukee River (consultant: Baxter & Woodman) 2017 MMSD finalizes internal study to reconfigure MMSD systems to increase service to Shorewood and Milwaukee

Facility Plan Project Summary Inflow-Infiltration reduction in public and private sewers throughout the Village - ONGOING Basin 1 Sanitary and Storm Sewer Construction - COMPLETE Basin 6 Sanitary and Storm Sewer Construction - COMPLETE Combined Area North Combined Sewer Construction - COMPLETE Combined Area South Combined Sewer and Storm Sewer Construction - PLANNED

Combined Sewer Service Area South Planning Summary Starting in 2011, Shorewood develops a plan to install a new storm sewer outfall to Milwaukee River to collect street runoff instead relying only on combined sewers. The concept is further developed in 2014 by MMSD studies and measures to further reduce runoff in the combined sewers are proposed. This was presented to the Board in 2015. Following that meeting in 2015, Shorewood conducts a study to evaluate the regulatory feasibility of the Milwaukee River Outfall. At the same time MMSD starts planning for combined sewer capacity improvements to better serve Shorewood and Milwaukee.

Summary of the Milwaukee River Outfall Solution The Outfall idea conceived by Ruekert-Mielke in 2011 Refined by CDM/Smith on behalf of MMSD in 2014 – 2015 Regulatory and Phasing considerations by Baxter & Woodman in 2016

Village of Shorewood Existing Combined Sewer System

Village of Shorewood Existing Basement Backup Risk – Computer Modeling Emphasize that this map shows backup “potential” base on these assumptions: gravity sewer (no overhead plumbing), no or inoperable backflow/backwater valve, and elevation of basement floor less than or equal to 6 feet below the elevation of the street; during a 3-inch, 1-hour precipitation event.

Village of Shorewood Existing Surface Ponding – Computer Modeling

Village of Shorewood Alternatives Analysis Full Sewer Separation New Storm Sewer System to Milwaukee River Water Quality Permitting Issues Low Pressure Sewers Overhead / Hung Plumbing in Basements 980 Basement Conversions - Private Improvements Does not Solve Sewage Overflows or Street Flooding Overflow Storm Sewer System aka “Virtual Separation” Recommended Alternative

Village of Shorewood Recommended Improvements Overflow Storm Sewers w/Outfall to Milwaukee River Remove Bottlenecks in Combined Sewer System

Village of Shorewood Regulatory Review – Key Findings Permitting: MMSD; Wisconsin DNR; US Army Corps of Engineers Water Quality Best Management Practices Continued Treatment of the First Flush and Low Flow by MMSD Green Infrastructure Measures Not Needed At This Time To Meet Current Regulations Draft water quality study completed by WDNR / MMSD for Milwaukee River Total Maximum Daily Load (TMDL) for Certain Pollutants

Village of Shorewood Existing Basement Backup Risk

Village of Shorewood Basement Backup Risk – Following Improvements

Intentional, by design, street flow <6” Intentional, by design, street flow <6”. Still a some ponding – mostly south blocks

Village of Shorewood Proposed Overflow Sewer System New Storm sewer to take surcharge of basements (disconnect downspouts and sump pumps) – criteria: during the 3-inch 1-hr storm – HGL below basements (6’ freeboard), 6” max in street, 9” max in sags. 2 hour ponding duration

Village of Shorewood Improvement Summary Provide Basement Backup Protection / Reduce Street Flooding Overhead Sewer / Hung Plumbing in Selected Basements Removing Bottlenecks in Combined Sewer System Overflow Storm Sewers w/Outfall to Milwaukee River Continued Treatment of the First Flush and Low Flow by MMSD

Everything comes together Baxter & Woodman shows us the regulatory framework for the proposed Milwaukee River Storm outfall. Baxter & Woodman also tell us that, without combined sewer capacity increases envisaged by MMSD, the way to address flooding is to provide the Milwaukee River outfall FIRST, so other pipes can connect to it in future years and expand coverage. With Combined sewer capacity increase by MMSD, the sequence of implementation will be different…

When MMSD increases combined sewer capacity: Instead of having to build the Milwaukee River outfall at great initial expense, Shorewood will be able to construct individual segments of combined sewer to provide significant flood protection. Increased flood protection will allow for the optimization of the most expensive segments of the Milwaukee River outfall and reduce the price tag of the overall response With increased flood protection in place, the planning, permitting, and financing the Milwaukee River outfall can proceed without the pressure of time hanging over us. The expansion of the Milwaukee River outfall service area in future years will increase the storm sewer service area and achieve the Goals of the Facility Plan.

In Plain English We thought our strongest option was to build a big and expensive pipe to Milwaukee River and keep building a network of storm sewers to achieve flood protection. BIG Money by Shorewood with no significant immediate relief, but increasing benefits as more pipes are built We now have MMSD building a big and expensive pipe connecting to their Deep Tunnel, and we can build a network of less expensive combined sewers to deal with flooding BIG Money by MMSD with immediate benefits, and increasing benefits as more pipes are built.