NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 15, 2016 Helen Cuervo VDOT District Administrator, Northern Virginia.

Slides:



Advertisements
Similar presentations
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Advertisements

I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
House Bill 2 and P3 Update Aubrey Layne Secretary of Transportation December 17, 2014.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan I-95 Corridor Stakeholder and Service Provider Meeting #2 June 13, 2011.
1 I-95/I-395 HOV/Bus/HOT Lanes Project update December
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Interstate 95 Corridor Improvement Program June 20, 2012.
Regional Priority Bus Transit Conference June 24, 2009.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Beyond Oil Transforming Transportation: A National Demonstration Project Breakout Session: A New Paradigm - Future of Transportation, Funding, and Climate.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
The Partnership between Transportation and Technology Jennifer Mitchell, Director Department of Rail and Public Transportation ITSVA Conference.
Multi Agency Exchange May 16, 2017.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Integrating Transit and Highway Solutions In High Volume Corridors
Update of Transportation Priorities Plan
To be Discussed Background of Road Bond Program
Nice to Meeks you….The Transform 66 Multimodal Project
Four Winds Condominium Association August 2, 2017
Local Government Roundtable Session Arlington, Virginia
I-77 High-Occupancy Toll Lanes
Regional Roads Committee
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
DATA Transportation 101 Project Status March 20, 2002
NGTA Halton Planning and Public Works Committee
Major Projects in Development
Mobility Choice Blueprint
Nick Wood, P.E. Texas A&M Transportation Institute
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
San Mateo Countywide Transportation Plan update
DRPT Overview Jennifer Mitchell Agency Director
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Slugging in the I-395 Corridor
Board Transportation Committee October 13, 2015
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Responsibilities and FUNDING
Commonwealth Transportation Board
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
April 23, 2018.
I-81 Corridor Improvement Plan
Draft FY Six Year Program
Major Initiatives in Hampton Roads
Interstate 95 Corridor Improvement Plan
Presentation transcript:

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 15, 2016 Helen Cuervo VDOT District Administrator, Northern Virginia

Northern Virginia Highlights HB 599 HB 2 Project Prioritization State of Good Repair Funding Express Lanes Improvements Transform 66 Transportation Demand Management Connected Vehicles Initiatives

HB 599: Evaluation of Significant Transportation Projects in Northern Virginia Provides detailed ratings based on seven performance measures selected in cooperation with stakeholders and the Northern Virginia Transportation Authority Congestion is the highest rating factor (45%) Measures how well a project mitigates congestion NVTA uses the congestion ratings as part of its project-funding formula

HB 2: Funding the Right Transportation Projects Directed Commonwealth Transportation Board to develop a statewide prioritization process (2014) Invests limited tax dollars in projects that meet the most critical transportation needs in Virginia Must use objective measures for six factor areas Must consider highway, transit, rail, road, operational improvements and transportation demand management projects ** Post-Construction: (for example, operating funds start in 2021 with $6.5 M and increase yearly) $523 million new funding recommended for Northern Virginia projects FY2017-2022

State of Good Repair Funding For FY17-18: Structure and Bridge: $15.2 million Duke Street over I-395 Gallows Road over Arlington Boulevard CTB vote in June Paving: $6.1 million 39 lane miles Focus on eastbound Route 50 (Loudoun/Fairfax) 10 miles northbound Route 29 in Arlington

Northern Virginia Express Lanes Network By 2021, an 84-mile seamless network of express lanes Faster and more reliable trips for drivers, carpoolers, and transit users

95/395 Corridor Express Lanes Northern Extension Converting two existing HOV to three express lanes, 8 miles north to D.C. line Extensive coordination – Pentagon, Arlington, Alexandria, D.C., etc. Draft financial plan expected fall 2016 Construction 2017, open 2019 Being completed under 2012 Comprehensive Agreement with 95 Express Lanes, LLC. The Framework Agreement was signed in November 2015.

95/395 Corridor Express Lanes Southern Extension Extend 2.2 miles south past Garrisonville bottleneck Approximately $50 million; half funded by state, half Transurban Construction begins this summer. SB ramp opens late 2017; NB ramp summer 2018 With both projects, total 37.5 miles from Stafford to D.C.

I-66 Corridor Inside the Beltway Drivers legally use lanes during rush hours by paying variable toll; carpools continue to use for free Contract award to build tolling infrastructure and develop/install system expected at June CTB Construction begins this summer, tolling begins summer 2017 Estimated $60 million Multimodal improvements funded by toll revenue to support transit, TDM, and other initiatives benefitting the I-66 corridor (selected by NVTC under 40-year agreement with Commonwealth) Recent public hearings for input on 10 endorsed projects worth $9.8 million total; CTB vote in June Benefits include enhanced bus service, bus stop improvements, transit information and incentives programs, transit access.

I-66 Corridor Eastbound Widening Widening to three lanes from Dulles Connector Road to Ballston (about four miles) Construction 2018 to 2020 $140 million funded with increased revenues from recently passed federal transportation bill

I-66 Outside the Beltway Two express lanes each direction from I-495 to Gainesville with variable toll Three general purpose lanes Safety and operational improvements at key interchanges Estimated cost $2.1 billion Cross-section, Gainesville to Manassas, Centreville to Beltway

Overview of Multimodal Improvements

Multimodal Improvements Expanding travel choices for transit, carpooling, vanpooling and other alternatives: New park-and-ride lots offering 4,000 spaces by late 2020 New/enhanced commuter bus service New/upgraded bicycle/pedestrian paths in Fairfax and Prince William, with new crossings of I-66

I-66 Outside the Beltway Current focus: Advance procurement with private sector and completing final environmental work Recent public hearings on public-private procurement and conversion of HOV-2 to HOT-3 (late 2020) 13 proposals with two strong P3 teams competing Private partner to be chosen in September with comprehensive agreement by end of year Design public hearings early 2017 Construction mid-2017; open late 2020/early 2021

I-66 Corridor Total Benefit Expanding travel choices, ride-share planning, park-and-ride capacity New and expanded transit service Lanes managed to be free-flowing at all times Improve speed reliability (to 45mph or better) Create opportunities for improved level of service of parallel routes Provide revenue stream support to multimodal components on I- 66 and complementary corridors

Transportation Demand Management VDOT oversees/funds $2.1 million to Commuter Connections and Commuter Operations Center (FY17) Includes Guaranteed Ride Home, marketing, monitoring, evaluation Coordination with MDOT and DDOT Local agency funding FY17: $645,000 to employer outreach Telework!VA Northern Va. program funding and co-management with DRPT Funding member of Clean Air Partners, educating public on ground-level ozone and greenhouse gases Metropolitan Area Transportation Operations Center (MATOC) funding member Regional SafeTrack impact mitigation

Transportation Demand Management Transform 66 Program including: Transportation Management Plan: $35 million for TDM, transit, traffic operations, local network operations, traffic engineering and analysis, construction of Haymarket Park & Ride l $10 million for additional multimodal projects to be approved by CTB for distribution by NVTC to local jurisdictions Post-construction: Multimodal program continues to be funded by developer at amounts/times set in agreement Ongoing inventory and $4 million of upgrades to state ADA curb ramps Working with DRPT to ensure rail, transit, TDM elements are included in highway projects, and documented as part of the Six-Year Improvement Program process (per VDOT Business Plan) Coordination to encourage TDM projects in NVTA’s Transaction plan ** Post-Construction: (for example, operating funds start in 2021 with $6.5 M and increase yearly)

Virginia Connected Corridors Virginia Tech Transportation Institute and VDOT partnership Northern Virginia connected-vehicle test bed includes I-66, I-495, U.S. 29 and U.S. 50 60 roadside equipment units

Virginia Connected Corridors Researchers across the Commonwealth testing and implementing connected applications for: traveler information enhanced transit operations lane closure alerts work zone/worker alerts incident management VCC test app – traveler information Road crew test app

Virginia Automated Corridors Initiative 2015 Governor’s Proclamation allows road testing under VTTI Led by VTTI with VDOT, Transurban and HERE Builds on existing connected corridors; differs from other testbeds in providing on-road, real-world environment Government, manufacturers, suppliers can test and certify systems Advances development, testing, deployment of automated-vehicle technology Ultimate goal: Helping stakeholders create robust automated and autonomous vehicles

Virginia Automated Corridors Initiative Smart Road (VTTI) Controlled test environment Virginia International Raceway Reconfigurable track, high-speed operations, elevation changes, complex curves Northern Virginia Express Lanes Open operational environment, limited-access I-66, I-495, and I-95 Testing details and challenges of public roadway systems VDOT has agreed to keep at least a portion of the pavement markings on the VAC in superior condition (automated vehicles of today rely on visual image processing to “see” the pavement markings to keep the vehicle in the lane) Potential expansion to any public road to satisfy unique test requirements