Using the HEPHY CO2 plant in B1 room

Slides:



Advertisements
Similar presentations
What to when you have an unexpected OSHA inspection.
Advertisements

Review of UNC Section Q “Emergencies” Steve Pownall Transmission Workstream.
There are three types of emergencies:  Internal  External  Natural disasters.
Occupational Health & Safety training and consultancy Demo version e-training for emergency procedures Start your e-training.
1 Low Conductivity Water (LCW) Connection Training Environmental Energy Technologies Division Safety Topic January 9, 2012.
FIRE SAFETY Autor: Ljiljana Kovačević, VPTŠ Užice ВИСОКА ПОСЛОВНО- ТЕХНИЧКА ШКОЛА СТРУКОВНИХ СТУДИЈА У УЖИЦУ.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
Oxygen Concentrators.
Crane Operations Objective
How much do you do?. What is a Boiler? A boiler is a vessel that is is under pressure and is being heated. The boiler will have a National Board # on.
4th Quarter Contractor Business Meeting December 14, 2012 Mike Kehoe Plant Engineering Facilities Session.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Safety and Health Programs
Division of Occupational Safety and Health (Cal/OSHA) March HEAT ILLNESS PREVENTION TRAINING.
Time Management & Work Organization Skills for Effective HR Personnel Presenter Annick M. Brennen, M.A. Educational Administrator, Consultant, & Trainer.
Worksite Hazard Analysis
Management of Health And Safety.
Heat Illness Prevention 2010 Employer Training. Training Goals Increase awareness and commitment to safety and health at the work site. Review heat illness.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
Vocabulary 4. local belonging to or connected with the particular place →It was difficult to understand the local dialect. contract an official written.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Performance Improvement. 2 Steps to Performance Improvement 1. Define the Problem 2. Define Duties or Behaviors to be Improved 3. Establish Priorities.
MODULE 6 Vehicle Parking, Servicing, and Security.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
1. 2 Hazard Assessment 3 Your accident rates or injury rates will be reduced by being pro-active in Hazard Assessment.
Vaccination for Contagious Diseases Handling and Transportation of Vaccines Adapted from the FAD PReP/NAHEMS Guidelines: Vaccination for Contagious Diseases.
Miner’s Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 Miners Rights Michigan Mine Safety & Health Training Program Rubin.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
CHAPTER 12 Professional Conduct National Pesticide Applicator Certification Core Manual Chapter 12 and Category E Chapter 10.
Health and Safety in Adult Social Care.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
+ HACCP Plan Section Flow of Food Path that food takes in an operations from start to finish. Purchasing Receiving Storing Preparing Cooking Holding.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Working Safely Near Power Lines NOVA SCOTIA ASPHALT USER PRODUCER ASSOCIATION.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Measuring and Reviewing Performance
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
SAFETY | TRAINING | CONSULTANCY| STAFFING SOLUTIONS
IBBelle: Status & Plans
Chapter 12 Administrative Controls
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Therapeutic equipment
Administration of a FIDIC Contract - Project Control
Ti/SS transitions A.Basti INFN-PISA*
Gas Regulator Inspection & Renewal Record
MICE Meeting at RAL, Oct-23, 2005
Status of the CO2 Cooling Project
Discussion items SVD mechanics session.

A Road Map to Food Safety
IPPC second consultation 1 July to 30 September 2018
IBBelle: Status Commissioning at MPP Transport to KEK
Exam conditions *SILENCE*
Miners Rights Rights & Responsibilities Under the Mine Safety & Health Act of 1977 Introduce topic. Hand out Miner’s Rights Booklets. Mine Safety & Health.
Team Leader name: Date:
Chapter 12 Administrative Controls
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
SOFTWARE DEVELOPMENT PLAN
Whose Job Is It? Responsibility for Laboratory Safety and Security
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
TS
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
CR-GR-HSE-419 Safety of excavation works
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Edwards S1, Arklay C1, Crameri S1, May A2, van Driel R1 and Hyatt AD1.
Presentation transcript:

Using the HEPHY CO2 plant in B1 room 18 August 2015 4 Sept. 2015 (revised) T. Tsuboyama (KEK)

The CO2 plant Integrated in a 46cm (H) x 46cm (W) x 55cm (D) chassis and can be put on a working table. Low temperature parts are wrapped with heat-insulating rubber to avoid dew. KEK and HEPHY people discuss that safety valves should be added. This can be done either in HEPHY or in KEK.

Location of CO2 usage Tsukuba experiment hall. B1 level. SVD/PXD preparation room

Location of the CO2 plant path through the ceiling of B1 room CO2 Cylinders (up to 2) HEPHY CO2 Plant Tsukuba B1 room ⌀100 exhaust pipes VXD assembly tent Dark room (5 m x 5m)

Exhaust pipes A thick tube will be used in order to reduce conductivity, for safety. Outside 15 m long, ⌀100mm exhaust tube F1 room CO2 plant exhaust (∅50 tube?) B1 room

Usage of CO2 cooling plant in KEK We should clear two laws concerning the CO2 plant. Working environment and health law 労働安全衛生法 High pressure gas safety act 高圧ガス安全法 However, I need to negotiate the managers of 1 and 2 as this is first practical utilization of CO2 in KEK. The CO2 plant should be acknowledged in KEK. I did not like it is treated in governmental regulations, in which huge efforts are necessary to get the license. License is not given if we are not lucky.

Working environment and health law I first have discussed with Prof. Furukawa, the working environment health law manager of IPNS, and with a 3rd party safety consultant company. We agreed the following conditions should be established before they admit our CO2 plant. Number of CO2 cylinders is up to 2 in the B1 room to secure the Oxygen concentration >15 % after an CO2 gas leak accident. CO2 should be exhausted outside of the Tsukuba building. We should equip enough number of monitors and alarms. The alarm should be displayed outside of doors. In case of significant CO2 leak, B1 room must be extinguished and wait until the CO2 level decreases. Information and necessary education: CO2 system manual Safety manual Instruction lecture to every worker.

High pressure gas safety act Then I discussed with Prof. Nakai, the high-pressure gas safety manager of KEK. He concluded that the plant is not subject to the governmental license. He admitted that KEK accepts the CO2 plant under following conditions: Definite acceptance test condition should be defined. Intense inspection and examination is done every year. Daily inspection shift: inspection is performed even the plant is not operated, as accidents can happen even when idle. You can finish the inspection when you decide the plant is no more used. Documents describing everything: Operation principles, detail design, structure, parts list (certification information), operation, safety system, failure cases. Emergency contact network.

Summary I cleared the first two steps. Working environmental safety low High-pressure gas safety act The managers allow us to utilize the CO2 system if conditions are met. I now can ask HEPHY people to start the process of CO2 plant shipping to KEK. If you prepare a shipping idea, schedule or documents, I will discuss with Ms. Nomura to start the receiving procedure. I will also ask comments of environmental /high-pressure safety professors.