WR Activities in Tsinghua

Slides:



Advertisements
Similar presentations
Outline Index of Refraction Introduction Classical Model
Advertisements

M. Kreider, T. Fleck WhiteRabbit 1 WhiteRabbit Timing System.
S Digital Communication Systems Fiber-optic Communications - Supplementary.
Waveguides Seminary 5. Problem 5.1 Attenuation and crosstalk of a wire pair A carrier frequency connection is transmitted on twisted pairs with the following.
Optical Interfaces Lab Last Update Copyright 2014 Kenneth M. Chipps Ph.D. 1.
EE 230: Optical Fiber Communication Lecture 17 From the movie Warriors of the Net System Considerations.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Dispersion Measurements Lecture-3. Dispersion Measurements Measurement of Intermodal Dispersion The most common method for measuring multimode fiber bandwidth.
Poznan Supercomputing and Networking Center
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
Optical Fiber Basics-Part 2
Analysis of Phase Noise in a fiber-optic link
H.Z. Peek Nikhef Amsterdam Electronics- Technology VLVnT11 Erlangen12-14, October White Rabbit Sub-Nanosecond timing over Ethernet H.Z. Peek......
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Precise measurement of physical link delay 802.1as, IEEE 802 plenary Lu Huang
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
High-precision timing discussion 1 David Berge University of Amsterdam & Nikhef GRAPPA Gravitation AstroParticle Physics Amsterdam Research Priority Area.
H.Z. Peek Nikhef Amsterdam Electronics- Technology KM3NeT General Assembly Meeting Catania, 20-23, February White Rabbit Sub-Nanosecond timing over.
Digitization at Feed Through R&D (2) Digitizer Performance Evaluation Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
 13 Readout Electronics A First Look 28-Jan-2004.
P. Jansweijer Nikhef Amsterdam Electronics- Technology Amsterdam July 5-6, 2010KM3NeT: General WPF/L meeting 1 Measuring time offset over a bidirectional.
Digital Acquisition: State of the Art and future prospects
Aloha Observatory Design
Pedro Moreira CERN BE-CO-HT
Results with the RPC system of OPERA and perspectives
Deep-sea neutrino telescopes
DAQ read out system Status Report
Improving IEEE 1588 synchronization accuracy in 1000BASE-T systems
Synchronization issues
INSIDE in-beam PET system assembly and test at INFN Torino
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Using diode laser for atomic physics (I)
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
the FIRESTORM project Real-Time distribution of
Next generation rad-hard links
White Rabbit in KM3NeT Mieke Bouwhuis NIKHEF 9th White Rabbit Workshop
LHAASO Electronics developments
ILC Phase Reference Distribution R&D
Institute of High Energy Physics, CAS
The White Rabbit Fieldbus
Long haul time distribution in existing telecommunication networks
Distributed Computing
HERD Prototype Beam Test
GROUP DELAY Group delay per unit length can be defined as:
Status of the Beam Phase and Intensity Monitor for LHCb
Subject Name: Optical Fiber Communication Subject Code: 10EC72
Kostas Manolopoulos Tasos Belias
Status of Synchronization System
LHAASO-WCDA: Design & Performance
QUARTIC TDC Development at Univ. of Alberta
A First Look J. Pilcher 12-Mar-2004
ANTARES time calibration
Precision Time Protocol
Conceptual design of TOF and beam test results
Fill-pattern Control System for KEKB
Commodity Flash ADC-FPGA Based Electronics for an
BESIII EMC electronics
MPPC for T2K Fine-Grained Detector
Design Requirements for Jinping Underground Neutrino Experiment
Readout electronics system for Laser TPC prototype
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

WR Activities in Tsinghua Guanghua Gong, Hongming Li, Xingwei Liu, Jianming Li Dept. of Engineering Physics, Tsinghua University Qiang Du Lawrence Berkeley National Lab 8th WR workshop, CERN Gevena, 6-7 Oct, 2014

Outline Temperature effect of WR link WR deployment at YBJ@Tibet WR development at THU other WR applications in China Introduction to Ultrasync Page 2

Temp. effect measurement of FIX DELAY http://arxiv.org/abs/1406.4223 Page 3

Temp. effect calculation of FIX DELAY Only ( ∆ 𝒕𝒙𝒔 , ∆ 𝒓𝒙𝒔 ) changes with temp. δ 𝑑𝑒𝑙𝑎𝑦 𝑚𝑚 = δ ∆ 𝑟𝑥𝑠 + δ ∆ 𝑡𝑥𝑠 𝑜𝑓𝑓𝑠𝑒𝑡 =δ 𝑑𝑒𝑙𝑎𝑦 𝑚𝑠 = 1 2 δ ∆ 𝑟𝑥𝑠 − δ ∆ 𝑡𝑥𝑠 δ txs1 =−7.9𝑝𝑠/℃ δ rxs1 = 13.0𝑝𝑠/℃ δ txs2 =−8.8𝑝𝑠/℃ δ rxs2 = 13.6𝑝𝑠/℃

Temp. effect correction of FIX DELAY Take the average value (δ txs =−8.5𝑝𝑠/℃, δ rxs =13.0𝑝𝑠/℃ ) for temperature correction. Node1 Node2 Node3 reduced from 800ps to 150ps in 70 ℃ temperature range components diversity exists, node calibration needed for high precision application. Page 5

Temp. effect of fiber length The refractive index of optical fiber has temp & wavelength dependency, asymmetry coefficient 𝛂 is not constant, it has temperature dependency. Fiber length 1KM Fiber length 10KM −0.2𝑝𝑠/(℃*Km) Page 6

Temp. effect of SFP laser spectrum SFP Type AXGE-1254-0531 Tx@1310nm ”Fabry-Perot” 0.11𝑝𝑠/(℃*Km) SFP Type AXGE-3454-0531 Tx@1490nm ”Distributed Feedback” −0.51𝑝𝑠/(℃*Km) 0.4~ 0.5 nm/℃ -1.3~0.9 ps/(nm*km) -0.65~0.45 ps/(℃*km) -0.23~0.33 ps/(℃*km) 0.08~ 0.12 nm/℃ 12.9~14.4 ps/(nm*km) 1.03~1.73 ps/(℃*km) -0.87~ -0.52 ps/(℃*km) laser diode spectrum temperature efficiency G652.D Chromatic dispersion [ref] ITU-T δ ∆ 𝑡𝑥𝑠 𝑜𝑓𝑓𝑠𝑒𝑡 =δ 𝑑𝑒𝑙𝑎𝑦 𝑠𝑚 =− 1 2 δ ∆ 𝑡𝑥𝑠

WR deployment at YBJ@Tibet ARGO, Yangbajin, Tibet, 4300m a.s.l. 48 electron detectors, 2 Muon detectors GPS receiver, Rubidium frequency 4 WR switches with latest GW/SW Customized node (spec. elec with WRPC) GPS+Ru+GrandMaster ED MD Page 8

WR deployment at YBJ@Tibet WRS 50/80m fiber GM Ru GPS ED assembled 50/80m fiber 3 ED as telescope 9ED on-top of MD 100m optical power composite cable Portable Calibrate-Node

Portable Calibrate Node A Cute-WR inside box, water sealed, vibration protect Armored optical power composite cable Rugged composite connector reference PPS for field measurement Directly connected to/synced with Grand-Master switch

WR-Switch GM vs PCN WRS1,2,3 vs PCN Over 20 hours, temp range 10-26℃ PCN with temp. correction, WRS without Page 11

WR node 300 samples for each node Nodes in different locations Node index Node vs PCN (ps) Accuracy precision 2 -138 100 5 -56 28 8 12 -27 150 16 17 -15 162 24 97 156 32 -40 34 39 -28 41 42 -157 135 44 -102 26 50 -45 300 samples for each node Nodes in different locations WR integrated with detector electronics (ED & MD type) WRPC as IP core Node has been calibrated individually Power noise causes bad precision

WR deployment at YBJ@Tibet : issues Slave can’t follow time jump of master (known) TAI vs UTC DAQ-PC is running with UTC time, WR-timestamp is in TAI mode. Confusing? RTU flushing takes time?? WR-time-get response late! Net-port based status monitor Packet lost Fix-delay changes after P&R WRPC as netlist blackbox is not enough. Page 13

WR deployment at YBJ@Tibet WR is promising No serious issue, excellent experience. ~100ps accuracy with individual calibration VERY tough environment Temp, rain/snow, dust, rude operation, animal PCN is useful TDC will be integrated (no need for oscilloscope) Remote FLASH update / multiboot will be great should be integrated into all WR nodes Page 14

WR developments at THU Cute-WR with remote-updade / multiboot General for all LHAASO WR-nodes Cute-WR-DP Redundant links for high reliability (parallel mode) Mini-switch for cascade topology (chain mode) Cute-WR with TDC Page 15

WR node with TDC synchronized time tags for signals/events Distributed TDC, event logger, many applications delay chain based TDC (23ps rms) Auto calibration, real-time temp. correction, Cyclone-II/Spartan-6/Vertex-4 Bin nonlinearity need to be calibrated Auto calibration before measurement is desirable Random input signals only available in special applications Dedicated calibrate signal Special OSC / Cascade PLL W.Jin RT2014: Uneven Bin Width Digitization & Cascade PLL DNL Histogram In (bin) LUT S Out (ps) Pulses with evenly spread timing relative to the TDC clock DMTD helper-clock WR-clock Get it for free, Bonus of WR

other WR applications in China CSNS (China Spallation Neutron Source) Apply WR for T0 arrival time measurement ~50 nodes, 2KM distance, 50ps time resolution JUNO (Jiangmen Underground Neutrino Observatory) apply WR for under-water readout-box time-sync ~1000 nodes, 150m distance, fiber must be LS compatible under water connectors, high reliability ADS (Accelerator Driven Sub-critical System) Apply WR as event logger for beam protect system 10 nodes, 200m distance, high reliability CJPL (China Jinping Underground Laboratory) Deepest underground lab, 7500 M.W.E. Dark-matter / Neutrino experiments, low background facilities General time/frequency distribution for 9 experiment halls Page 17

Introduction to Ultrasync Academic spin-off of THU New partner in OHWR community Current: OHWR distributor (import/export) Cute cards production WR consultation & promotion in China Future: WR related development WR installation/commission/maintainess www.ultrasync.com.cn ---under construction Page 18

sweet! White Rabbit is synchronous, precise, robust and