Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Advertisements

Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Alabama Department of Economic and Community Affairs.
Energy Conservation & Performance Contracting
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Business Acquisition Process Implementation & transition Closing Negotiation of the transaction Due Diligence Engagement TargetIdentification.
Practical Ways for Towns to Save Money with Clean Energy Projects Doreen Hamilton April 30, 2014.
Genesis Solar Module Brochure ™
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
Route to Buyout – Preparation is Key MetLife Assurance Limited – A specialist in pension risk management.
Big Ten Sustainability Conference November 14-15, 2010 Funding Strategies: Energy Savings Projects and Seed Grants Funding Strategies.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
The Contractor Development Program
Creating A Greener Energy Future For the Commonwealth Procurement of Renewable Energy on Landfills January 19, 2010 Courtney Feeley Karp, Esq.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
District of Columbia Housing Authority Office of Capital Programs and Development Construction Services Administration, LLC Going Green: Intelligent Investments.
Reduce Your Operating Expenses, Increase Your Profits a Story of Energy Efficiency.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
New Jersey Energy Efficiency, Generation & Resilience Funding Update
GUARANTEED ENERGY SAVINGS CONTRACTS
EDENTON-CHOWAN SCHOOLS
Energy Savings Performance Contracts & Energy Service Companies
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
EPC CONCEPTS and BUSINESS CASES
EIA approval process, Management plan and Monitoring
Colorado Department of Public Health and Environment April, 18, 2008
Highways Maintenance Contract Commissioning Project
PV SOLAR PROJECT OPPORTUNITIES

Valley & Third Streets Redevelopment
Phase 3 Solar Feasibility Study Findings and Recommendations
Civic Center Sports Field Study Session & Quarterly Update
Enterprise Content Management Owners Representative Contract Approval
Developing and Issuing the RFP
Quality Management Systems – Requirements
Makerere University Investors Conference
Phase 2 Tollgate Review Discussion Template
Advancing Solar PV at Lower Cost: Performance Based Incentives, Price Certainty, and Equitable Rate Treatment Ronald Gerwatowski – Senior VP, National.
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
[Project Name] Project Gating Presentation
Phase 2 Tollgate Review Discussion Template
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
EIA- Concept and Practice
Delta Water Supply Project
Progress on the Renewable Energy IPP Procurement Programme
TECHNOLOGY ASSESSMENT
Agenda Topics: Competitive Bidding Determine Selection Method
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
EDENTON-CHOWAN SCHOOLS
Energy Savings through Elevator Modernization and
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

Triple bottom Line Achievements Through Energy Savings and Energy Performance Contracts Gary Nower – Wilfrid Laurier University Edward Ng – EY Carl McKay - Willms & Shier

Project Overview Wilfrid Laurier University Wilfrid Laurier is a medium sized University with two (2) main campuses: Waterloo Brantford

Project Overview Wilfrid Laurier University Brantford Campus 3,500 FTE’s 500K ft2

Project Overview Wilfrid Laurier University KING STREET NORTH Waterloo Campus 15,000 FTE 2.4M ft2

Project Overview To ESCO or not to ESCO…. University Need Potential for energy savings Decision on How Best to Proceed Evaluation determined ESCO as the best option FM Strategy Deferred TMA TCO

Project Overview FM Strategy TCO TMA ESCO

Project Overview ESCO – Take 1 P3 Procurement strategy - Guarantees RFQ RFP Revisit Strategy Reboot

Project Overview ESCO - Technical Re-tooled the RFP to include three (3) Representative Facilities, the balance of the portfolio and a micro grid study.

Project Overview ESCO – Implementation Phase ESCO Component Status Phase I Three (3) Representative Facilities Complete Phase II Portfolio Facilities Beginning in December 2016 Phase III Micro grid and CUP July 2017

Project Overview Current Status Phase I complete – savings of approximately $280K/yr. Phase II Start December 2016 – Savings TBD Phase III Start July 2017 - Savings of approximately $1.4M/yr.

Project Process and Transaction Procurement Principles Procurement Process Fair and transparent process Maximum competitive tension Cost certainty for WLU Proponent opportunity for due diligence Representative Facilities vs. Portfolio Facilities Two-way communication throughout procurement

Project Process and Transaction Procurement Process RFQ Issuance of RFQ Bidder clarification requests RFQ response submissions Evaluation of RFQ response submissions Selection of three (3) shortlisted bidders RFP Issuance of RFP On-site visits (Representative Facilities) Consultation meetings with bidders Proposal submissions Evaluation of Proposals Selection of Preferred Proponent Commercial and Financial Close Post Selection Execution of Energy Performance Contract for Representative Facilities Implementation of ECMs at Representative Facilities Execution of Technical Audit Study (Representative Facilities) Execution of Energy Performance Contract for Portfolio Facilities Implementation of ECMs at Portfolio Facilities [3 to 4] months 9 months [●] months

Project Process and Transaction Proposal Components Technical Proposal Financial Proposal Representative Facilities 75 points Continuity of Key Project Personnel Facility Assessment Baseline Energy Consumption Proposed ECMs ECM Construction, Implementation and Maintenance ECM Measurement and Verification Implementation Cost, Guaranteed Savings and Post Acceptance Performance Period Costs Payment Terms Financial Viability Proposal Summary Portfolio Facilities 25 points Potential ECMs Energy Audit Fee Cost and Pricing

Project Process and Transaction Outcomes WLU will fund the Project through a 20-year payback agreement that uses the energy savings to pay for the upgrades through an ESCO agreement with Johnson Controls Inc. (JCI) Proposed sustainable energy management initiatives include solar wall installations, system upgrades and an energy audit at WLU’s facilities in Waterloo and Brantford JCI’s proposed 18 ECMs for all three (3) Representative Facilities Total annual savings estimated at $284,425, with electricity savings representing the most material value at $262,000 per year.

Energy Performance Contracting Typical ESCO Contracting Process Preliminary Assessment ESCO conducts preliminary assessment of proposed partner qualifications and facilities to determine the feasibility of the project –Establishing baselines and/or existing facility conditions Letter of intent Negotiate an energy audit agreement and form of energy performance contract. Comprehensive Energy Audit ESCO conducts a comprehensive energy audit of facilities and a proposal for energy conservation measures is prepared for review by institution. Scope of Work The final accepted proposal becomes the scope of work under the energy performance contract. Financing Institution determines whether project will be self financed or whether 3rd party financing will be obtained. Contracting Entering into of energy performance contract to design, procure and construct ECMs in accordance with the scope of work from Energy Audit agreement.

Energy Performance Contracting Energy Audit Agreement Agreement between ESCO and Institution for ESCO to conduct a technical energy audit of the agreed to facilities and provide a report to the Institution that will form the basis of the scope of work under an energy performance contract. The report (or proposal) once approved by Institution becomes the scope of work under the energy performance contract. The cost of the energy audit is generally provided as a fee per square foot. Typically the payment of the audit fee is contingent on ESCO being able to show that the suite of energy saving measures proposed can be paid for with the resulting energy cost savings and within a maximum time period (payback period). Where the Institution accepts the proposal the fees for the energy audit are rolled into the project costs under the energy performance contract.

Energy Performance Contracting Energy Performance Contract Agreement between ESCO and Institution for ESCO to implement the accepted energy conservation measures arising from the energy audit. Energy Performance Contract Performance guarantee Reconciliation of ESCO under performance and over performance Security for ESCO performance

Energy Performance Contracting Performance Guarantee ESCO guarantees that the project energy cost savings will pay for the projects capital costs and post implementation measurement and verification costs over a specific payback period. The pay back period is the period of time in which the aggregate energy cost savings must equal or exceed the capital costs of and post implementation measurement and verification costs. The payback period can be blended with various energy conservation measures with varying payback periods to allow for more comprehensive energy conservation measures. For example in the case of a 10 year pay back period an ECM with a 15 year pay back can be offset by ECMs with a 5 year pay back. In the event that the energy cost saving are not sufficient to pay for the project costs ESCO must compensate Institution for the under performance.

Treatment of Performance Energy Performance Contracting Reconciliation of Under Performance and Over Performance During the payback period there may be periods of over performance and under performance of energy savings. Treatment of Performance ESCO and Institution will need to determine the treatment of ESCO over performance and under performance. Payback Period ESCO will want to have any payback period over performance credited against any payback period under performance. Recognition Institution may want to limit recognition of ESCO over performance and will want to receive under performance compensation as quickly as possible.

Energy Performance Contracting Security for Performance ESCO’s provision of security for it performance is a significant concern for institution. Significant part of Institution’s comfort with ESCO’s ability to complete its contractual obligations should come from RFQ process which will include financial background of ESCO. Energy Performance Contract will contain risk mitigation measures for construction and guarantee payment obligations including any of the following: Performance and payment bond; Letter of credit; and/or Parent company guarantee.

Current Status Phase I is now complete Phase II is under review Phase III Micro grid analysis complete

Micro Grid

Proposed Micro Grid Solution

Micro Grid Operating Modes Grid Connected Operation CHP Operation Power Storage Operation Solar PV Operation WLN Power Feeder Operation Temporary Outage Operation Emergency Generators

Micro Grid Operating Modes Island Mode Operation (Extended Outages) CHP Operation Power Storage Operation Solar PV Operation Emergency Generators

Questions?